HomeMy WebLinkAbout00072457CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
March 28, 2002
TO: Greg Taggert, via fax 693 -4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SPRING BRANCH (REZ) - REZONING
Staff reviewed the above - mentioned rezoning application as requested. The following
page is a list of staff review comments detailing items that need to be addressed.
Please address the comments and submit the following information for further staff
review:
Two (2) complete sets of rezoning maps; and,
Date the property was conveyed to owner by deed.
If there are comments that you are not addressing with the revised rezoning maps,
please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 764 -3570.
Attachments: Staff review comments
cc: Frank Thurmond; Thurmond and Windham, via fax 846 -2438
Case file #02 -055
Home of Texas A &M University
DEVELOPMENT SERVICES
r
TRANSMITTAL LETTER
10
Name/Firm:
ot t�� Date: Z / a ZGOZ X D
Address: 2 5 51 ctS v - e S Phone:
CS - 7764 . 0 Fax:
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ FEMA CLOMA /CLOMR/LOMA/LOMR
❑ Site Plan
Cl Master Development Plan
❑ Preliminary Plat
❑ Final Plat
❑ Grading Plan
❑ Landscape Plan
❑ Irrigation Plan
❑ Building Construction Documents
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
W/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑
Redlines
' INFRASTRUCTURE AND ENGINEERING DOCUMENTS
iA11 infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w /❑
Redlines
❑
Drainage Construction Documents
w/ ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bounds
decsription
❑
Drainage Letter or Report w/ ❑
Redlines
❑
Fire Flow Analysis
w/ ❑
Redlines
Special Instructions:
❑ Development Permit App.
❑ Conditional Use Permit
)i,R ezoningy Application
❑ Variance Request
❑ Other - Please specify
d( e c
❑ TYDOT Driveway Permit
❑ T.YDOT Utility Permit
❑ Other - Please specify
TRANSMITTAL LETTER I or I
TRANSMIT 12!=:2001
2551 Texas Ave. South, Ste. A, College Station, TX 77840
Ofc: 979.693.5359 Fax: 979.693.4243 Email: mdgcs @mdgcs.com Web: www.mdgcs.com
March 21, 2002
Natalie Ruiz
Development Coordinator
City of College Station
College Station, Texas 77845
Re: Rezoning of a 32.13 Acre Tract, Thomas Caruthers League, A -9, College Station
Ms. Ruiz:
Please take this letter as my authorization for MDG and its officers Larry Wells or Greg Taggart to act as
my agent in this zoning matter.
Please feel free to call me if you have any questions. Ili
Sincerely, �V�(�Er� / ]
�t %
Frank on
000387- c.02(3486)
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
April 8, 2002
TO: Greg Taggert, via fax 693 -4243
FROM: Molly Hitchcock, Staff Planner
SUBJECT: SPRING BRANCH (REZ) - Site Plan
Staff reviewed the above - mentioned rezoning application as requested. The
following page is a staff review comment detailing an item that needs to be
addressed. Please address the comments and submit the following information
for further staff review:
Two (2) complete sets of rezoning maps.
If there are comments that you are not addressing with the revised rezoning
maps, please attach a letter explaining the details. If you have any questions or
need additional information, please call me at 764 -3570.
Attachments: Staff review comments
cc: Frank Thurmond; Thurmond and Windham, via fax 846 -2438
Case file #02 -055
Home of Texas A &M University
STAFF REVIEW COMMENTS
Project: SPRING BRANCH (REZ)- REZONING (02 -055)
PLANNING
1. On the rezoning map, please show all easements abutting the subject property.
2. Please provide staff with the deed date. It was not included on the application.
Reviewed by: Jennifer Flanery Date: March 28, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
2of2
STAFF REVIEW COMMENTS NO. 2
Project: SPRING BRANCH (REZ)- REZONING (02 -055)
PLANNING
1. Please show the 20 -ft. utility easement that abuts the subject property to the
west.
Reviewed by: Jennifer Flanery/Molly Hitchcock Date: April 8, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
2of2