HomeMy WebLinkAbout00072336
Budgetary & Financial Summary: N/A
Attachments:
1. Area map
2. Application
3. Copy of Plat
04.!6412002 10:45 9796918904 KERRSUV PAGE 02
FILE COPY 6~
KERR SURVEYING CO.
P.O. BOX 269
505 CHURCH STREET
COLLEGE STATION, TEXAS 77841
Brad Kerr Telephone:
Registered Professional (979)268-7.3195
Land Swvcyor #4502 (979) 691-8904 FAX
April 4, 2002
Attn. Spencer Thomas
City of College Station
Please pull the Preliminary Plat of Lick Creek Subdivision from the agenda for the April 4,
2002, Planning and Zoning meeting and reschedule for the April 1.8, 2002, meeting.
If you have any questions please feel free to contact us.
Sincerely,
Louise Barker
0410412002 10:45 9796918904 KERRSUV PAGE 01
Fay Traiismlttal
late:
From:
Kerr Surveying Company
505 Church Street
P.O. Box 269
College Station, TX 77841
Phone: 979-268-3195
Fax: 979-691-8904
To:
C/O:
Fax:
RE: "
Number of sheets transmitted, including cover sheet: C--~
vc-2-3lp
DEVELOPMENT SERVICES 910(; j oa
TRANSMITTAL LETTER cl: WAM
s~
13
Name/Firm: r1/~ v,4 Dater
Address: ~T&S" &007 Phone: oQF-J15/5-
Sd-n, T, Fax:
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ Master Development Plan w/ ❑ Redlines ❑ Development Permit App.
Preliminary Plat w/ ❑ Redlines ❑ Conditional Use Permit
❑ Final Plat w/ ❑ Redlines ❑ Rezoning Application
❑ FEMA CLOMA/CLOMR/LOMA/LOMR w/ ❑ Redlines ❑ Variance Request
❑ Site Plan w/ ❑ Redlines ❑ Other - Please specify
❑ Grading Plan w/ ❑ Redlines
❑ Landscape Plan w/ ❑ Redlines
❑ Irrigation Plan w/ ❑ Redlines
❑ Building Construction Documents w/ ❑ Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑ Waterline Construction Documents w/ ❑ Redlines ❑ TxDOT Driveway Permit
❑ Sewerline Construction Documents w/❑ Redlines ❑ TxDOT Utility Permit
❑ Drainage Construction Documents w/ ❑ Redlines ❑ Other - Please specify
❑ Street Construction Documents w/ ❑ Redlines
❑ Easement application with metes & bounds decsription
❑ Drainage Letter or Report w/ ❑ Redlines
❑ Fire Flow Analysis w/ ❑ Redlines
Special Instructions:
\NSMITTAL LETTER 1 of 1
NSMIT.DOC 10/17/01