HomeMy WebLinkAbout00072290CITY OF COLLEGE STATION
WORK REQUEST
PAGE
REQ /JOB:
WF0274480 / 001 PROJECT:
RE DAT
2%14%02
CREW:
PRINT TIME:
14:09:29
SCHEDULE
DATES
LOCATION:
5050 PEBBLE CREEK PKWY 77845 COMPLETION:
2
GEN. LOC:
COLLEGE STATION LOC
ID: 131392
REF NBR:
REQ DEPT:
DE- BUILDING INSPECTION
PRIORITY: NORMAL
REQUESTOR:
PEBBLE CREEK DEVELOPMENT CO
ORIGIN: CUSTOMER -WALK
IN
USER ID:
GMESSARRA AUTH: GMESSARRA
WORK TYPE: ROUTINE
DESCRIPTION:
1 IRRIGATION TAP
REQUEST COMMENTS
BILL TO: PEBBLE CREEK OWNERS ASSOC 690 -0992
4500 PEBBLE CREEK PKY - CS 77845
CONTACT NAME: BOBBY MAULDIN - PLS CONTACT BEFORE
NEEDS TO BE PLACED AT THE CORNER OF PEBBLE CREEK
PKWY & ROYAL ADELADE
------------------------------------------------------
Job Order Description: 1 IRRIGATION TAP
Category code CS- CUSTOMER SERVICES CSCS
Task code: SET UP NEW UTILITY ACCT SET
Facility ID
Assigned Department: OT- CUSTOMER SERVICE
02112102 08:03 From: Bridgette George 979 - 764 -3896
IDENTIFY THE TYPE OF WORK TO BE PERFORMED:
Page 7 of 8
*the starred items may not require that structural contractors, sign contractors, or landscapers perform
the work - contact applicable City Departments for determination
I hereby verify that the information contained in this application is true and complete, to the best of my knowledge. I
understand that the City has the authority to inspect the work to be conducted within the public right -of -way at any
time. I also understand that this permit may be revoked at any time at the discretion of the City Officials.
Applicant's signature
Conditions of Approval:
2- M 2_
Date applied
PIP APPLICATION 2 of 2
Pipapp.doc 02/12/2002
Awning
Structural Contractor:
Benches
Number of Benches:
Bike racks
Number of Bike Racks:
Cafe
*Structural Contractor:
Canopy
*Structural Contractor:
Demolition
Structural Contractor:
Electrical
Master Electrician:
Facade
Structural Contractor:
Irrigation system
State Licensed Irrigator:
Landscaping
*Landscape Architect /Company: AW1VL4NG
Masonry fence
*Structural Contractor:
Sign(s)
*Sign Contractor:
Waterway Alterations
Design Engineer:
Wood fence
*Structural Contractor:
Other (please describe):
Identify party to perform this work:
*the starred items may not require that structural contractors, sign contractors, or landscapers perform
the work - contact applicable City Departments for determination
I hereby verify that the information contained in this application is true and complete, to the best of my knowledge. I
understand that the City has the authority to inspect the work to be conducted within the public right -of -way at any
time. I also understand that this permit may be revoked at any time at the discretion of the City Officials.
Applicant's signature
Conditions of Approval:
2- M 2_
Date applied
PIP APPLICATION 2 of 2
Pipapp.doc 02/12/2002