Loading...
HomeMy WebLinkAbout00072283J STAFF REVIEW COMMENTS NO. 1 Project: PEBBLE CREEK OWNERS ASSOC (PIP)- PUBLIC IMPROVEMENT PERMIT (2- 500030) PLANNING 1. Please submit a 24 x 36 site plan of the subject area to be improved to scale. 2. Please show all existing utilities and location of any sidewalks that may exist adjacent to the proposed area of improvement. 3. You will need to show exact locations of all plantings. Please be aware that all plantings must be irrigated, you will need to show proposed irrigation system. 4. Please be aware that there is a 45 -foot site triangle at each street intersection, there cannot be any plantings between 3 -9 ft. of height in this site triangle area. Reviewed by: Jennifer Reeves Date: 02/20/02 ENGINEERING 1. Engineering will review this after utility and irrigation information is provided. MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 Feb. 20 2002 1:41PM PC 9796906081 P.1 PEBBLE CREEK 4500 Pebble Creek Parkway College Station, TX 77845 Development Company (979)690 -0992 Fax (979)690 -6081 Fax Cover Page Please deliver the fallowing pages to: Name: Company: Fax Number: Total Number of pages (including cover page): Date: 1--/ za /'0 2- From: Bobby Mauldin Comments: PE13B1:E CkEEk' February 22, 2002 Ms. Bridgette George Assistant Development Manager City of College Station 1101 Texas Avenue College Station, TX 77845 Dear Ms. George, I have enclosed for your review the 24 x 36 master plat of Pebble Creek Development. would like to point out that the deed restrictions for Phase 5B, C & D did require all homeowners irrigate the outside portions of the fence; this is the area in which the plantings will be placed. So aside from some minor adjustments, we will not have any new irrigation installed in these proposed areas. Thank you for your consideration. Sincerely Pebble Creek Development Company, Inc. Bobby Mauldin RE'rEVVED FOR FE 2002 CULLtbt b I A I 1UN DEVELOPMENTSERVICES _ . FA CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM February 21, 2002 TO: Bobby Mauldin, Pebble Creek Owners Assn., Via fax 690 -6081 FROM: Bridgette George, Assistant Development Manager SUBJECT: PEBBLE CREEK OWNERS ASSOC (PIP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Case file #2- 500030 Home of Texas A&M University Feb. 15 2002 10:23AM PC 9796906081 P.1 PEBBLE CREEK 4500 Pebble Creek Parkway College Station, TX 77845 Development Company (979)690 -0992 Fax (979)690 -6081 Name: 1311. �p�7TE Company: Fax Number: Total Number of pages (including cover page): Date: /,57t�- From: Bobby Mauldin Comments: - TA�5W Z4' au � 7 , Alt kJlC,c, +D o .4 P[�JT �4+ES1V L.6 7, 1 i�E LrE' 6 07 I to 07- W S' Cr ARF _ oSt y G�our.1 WE a4K (, h Lr 1 - 4 Cah / �KtkC Ou Otis � f"kr .Sfr B �EJW L�Ak Ip✓ T �� Awy- / 1 y �lSl'A�rJ �I Nlaw�"� Please deliver the following pages to: SOME The City of R, College Station, Texas Embracing the Past, Exploring the Future. P.O. Box 9960 • 1101 Texas Avenue 0 College Station, TX 77842 (979) 764 -3500 www.ci.college-station.tx.us MEMORANDUM TO: Jennifer Reeves Staff Planner Development Services CC: Bob Mosley, City Engineer Lee Robinson, Traffic Systems Superintendant FROM: Dale Picha, Traffic Engineer DATE: March 4, 2002 RE: Landscape Improvements on Parkview Drive The establishment by the Pebble Creek Homeowner's Association (HOA) of any temporary and /or permanent landscape materials (including vegetation, sprinkler systems, entry signs, benches, etc.) within city easements or right of way on Parkview Drive shall conform to all provisions of Chapter 3 in the Code of Ordinances, Section 3, Paragraph J, including Paragraph 4(a): (i) the improvement or facility will not be located on, extend onto, nor intrude upon any portion of the roadway; (ii) the improvement or facility will not be located on, extend onto, nor intrude upon any portion of the sidewalk which is needed for pedestrian use; (iii) the design and location of the improvement or facilities includes all reasonable planning to minimize potential harm, injury, or interference to the public in the use of the public street or sidewalk; (iv) the improvement or facility will not create any hazardous condition or obstruction of vehicular or pedestrian travel upon the public street or sidewalk. The following provisions, whether or not specifically implied or mentioned in the Code of Ordinances, also apply: • If any landscape materials within or near the city easements or right of way are not properly maintained by the Pebble Creek HOA, the City of College Station reserves the right to remove these materials that constitute a sight distance hazard for vehicles and pedestrians, as well as a sight distance obstruction to any official traffic control device. Furthermore, the City of College Station is not responsible for the costs associated with replacing these materials; Home of Texas A &M University Landscape Improvements on Parkview Drive Page 2 of 2 • The Pebble Creek HOA is responsible for the costs (materials and labor) associated with re- locating any official traffic control device. Any device to be relocated, as well as the proposed new location, must be approved by the City Traffic Engineer; • The Pebble Creek HOA is responsible for the costs (materials and labor) associated with the relocation and/or repair of any electrical conduit or other public utilities that becomes damaged during the construction and maintenance of any landscape materials within the city easements or right of way; • The Pebble Creek HOA (and any of its maintenance staff and contractors) shall hold harmless the City of College Station for any injuries incurred while constructing and maintaining any landscape materials within city easements or right of way. If you have questions and comments, please contact: Dale L. Picha, P.E. City Traffic Engineer City of College Station, Dept. of Public Works P.O. Box 9960 College Station, TX 77842 Phone: (979) 764 -3691 FAX: (979) 764 -3489 E -mail: dpicha ccrci .college - station.tx.us Encl: Map of Existing Traffic Control Devices • • t • ON 85552 �, oe