Loading...
HomeMy WebLinkAboutMisc.0408 1 0 6 ,601 THE TRACE AT COLLEGE STATION CONDOMINIUMS V% o4 ON -SITE ESTIMATE OF PROBABLE COST PUBLIC INFRASTRUCTURE 1/9/200 PROPOSED SEWER CONSTRUCTION ' PROPOSED s SEWERLINE "1" 0+00 -4+ $9.21 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST EA 6" PVC Sanitary Sewer Line (SDR 26, Class160) ASTM 440 LF $21.00 EA 1 D3034 1 EA $9,240.00 2 Standard Manhole 1 EA $2,000.00 $2,000.00 3 Tie to Exist. Sanitary Sewer 1 EA $2,200.00 $2,200.00 4 Trench Safety 440 LF $2.00 $880.00 $32,450.00 SEWERLINE "1" CONSTRUCTION = $14,320.00 TOTAL SEWER CONSTRUCTION = $14,320.00 PROPOSED WATER CONSTRUCTION PROPOSED 8" WATERLINE "1" 0+00 - 8+47:81 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (DR14 Class 200, AWWA C909) 2 Standard Fire Hydrant (Type 2) w /accessories 3 Wet Connection To Existing 12" Waterline 4 6" x 6" MJ Gate Valve w /accessories 5 8 "x6 "MJTee 6 8" x 22 1/2 MJ Bend 7 8" MJ Plug 850 LF $21.00 $17,850.00 3 EA $2,500.00 $7,500.00 1 EA $5,000.00 $5,000.00 1 EA $300.00 $300.00 4 EA $300.00 $1,200.00 1 EA $300.00 $300.00 1 EA $300.00 $300.00 WATERLINE "1" CONSTRUCTION = $32,450.00 PROPOSED 8" WATERLINE "2" D+00 - 12+43.28 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (DR 14 Class 200, AWWA C909,) 2 Standard Fire Hydrant (Type 2) w /accessories 3 Wet Connection To Existing 12" Waterline 4 8" x 90 MJ Bend 5 8" x 22 1/2 MJ Bend 6 8 "x8 "MJTee 1,244 LF $21.00 $26,124.00 2 EA $2,500.00 $5,000.00 1 EA $5,000.00 $5,000.00 1 EA $300.00 $300.00 EA $300.00 $300.00 EA $300.00 $300.00 WATERLINE "2" CONSTRUCTION = $37,024.00 CONSTRUCTION = $69,474.00 IMPROVEMENTS = $83,794.00 '/o CONTINGENCY= $8,379.40 VSTRUCTION PRICO $92,173.40