MEMORANDUM
January 22, 2004
TO: Lenwood Adams, PE, MDG, Via fax 694.4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: KENNETH W SCHICK (RP) - Final Plat
Staff reviewed the above - mentioned final plat as requested but had to stop review due
to conflicts with the platting and zoning. The following page is a list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information by an established deadline to be scheduled for a
future Planning & Zoning Commission meeting:
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
If you have any questions or need additional information, please call Spencer
Thompson or myself at 764.3570.
Attachments: Staff review comments
cc: Student Housing USA, Via fax 512 - 247 -4915
Case file #04- 00500008
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: KENNETH W SCHICK (RP) - 04- 00500008
PLAT COMMENTS
ENGINEERING
1. STOP REVIEW. Staff is required to stop the review of this plat due to conflicts with
platting and zoning. Plat comments are supplied below.
2. Please correct the Ownership Certification block. It appears to be incorrect, text
shifted, etc.
3. Is the property owner intending to dedicate property other than ROW to the CoCS. If
so, please include language in ownership dedication. See below.
4. The title block should read H. W. Schick Subdivision.
5. An access easement is needed from SW Parkway to Tract 7R -3. However,
discussion of driveway location with City Staff needs to be addressed.
6. Comment #4 applies to Tract 9R -3 since a separate driveway cut would not be
permitted along Wellborn road in this area.
7. The ROW distance is incorrect. There is not 50 -ft of ROW on Christine.
8. Construction drawing comments to be returned separately. Staff will return
comments even though the plat is stopped. A DP is required with construction
documents.
9. See comment #6. However, the sewer line proposed to cross Tracts 5 and 6 will not
be allowed. This line will need to utilize a different route. Therefore, the associated
easement on Tract 7R -3 will not be needed.
Reviewed by: Spencer Thompson Date: January 21, 2004
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2004 version of plat and /or site plan.
email to rbolin _cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
9. College Station Utilities is preparing to install street lights along Wellborn Rd. from
Christine Lane to Southwest Parkway. Please contact us about any curb cuts along
this section of Wellborn Rd.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
10. Developer provides a 10" PUE along Wellborn Rd. From Christine Lane to
Southwest Parkway for street lights.
Reviewed by: Ronnie Bolin Date: 1 -15 -04
CERTIFICATE OF GREENWAY DEDICATION
"STATE OF TEXAS )
COUNTY OF BRAZOS )
I (we) , owner(s) and developers of the land shown
on this plat, and described herein as Subdivision in the
City of College Station, Texas, and whose name(s) is /are subscribed hereto, hereby
dedicate in fee simple to the use of the public forever all greenways thereon shown for
the purpose and consideration therein expressed.
Owner(s) "
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City, will constitute a completely
new review.
3 of 3
r
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
January 22, 2004
TO: Lenwood Adams, PE, MDG, Via fax 694.4243/
FROM: Bridgette George, Assistant Development Manager
SUBJECT: KENNETH W SCHICK (RP) - Final Plat
Staff reviewed the above - mentioned final plat as requested but had to stop review due
to conflicts with the platting and zoning. The following page is a list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information by an established deadline to be scheduled for a
future Planning & Zoning Commission meeting:
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx.us
If you have any questions or need additional information, please call Spencer
Thompson or myself at 764.3570.
Attachments: Staff review comments
cc: Student Housing USA, Via fax
Case file #04- 00500008
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: KENNETH W SCHICK (RP) - 04- 00500008
PLAT COMMENTS
ENGINEERING
1. STOP REVIEW. Staff is required to stop the review of this plat due to conflicts with
platting and zoning. Plat comments are supplied below.
2. Please correct the Ownership Certification block. It appears to be incorrect, text
shifted, etc.
3. Is the property owner intending to dedicate property other than ROW to the CoCS. If
so, please include language in ownership dedication. See below.
4. The title block should read H. W. Schick Subdivision.
5. An access easement is needed from SW Parkway to Tract 7R -3. However,
discussion of driveway location with City Staff needs to be addressed.
6. Comment #4 applies to Tract 9R -3 since a separate driveway cut would not be
permitted along Wellborn road in this area.
7. The ROW distance is incorrect. There is not 50 -ft of ROW on Christine.
8. Construction drawing comments to be returned separately. Staff will return
comments even though the plat is stopped. A DP is required with construction
documents.
9. See comment #6. However, the sewer line proposed to cross Tracts 5 and 6 will not
be allowed. This line will need to utilize a different route. Therefore, the associated
easement on Tract 7R -3 will not be needed.
Reviewed by: Spencer Thompson Date: January 21, 2004
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2004 version of plat and /or site plan.
email to rbolin(a)-cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
9. College Station Utilities is preparing to install street lights along Wellborn Rd. from
Christine Lane to Southwest Parkway. Please contact us about any curb cuts along
this section of Wellborn Rd.
10. Developer provides a 10" PUE along Wellborn Rd. From Christine Lane to
Southwest Parkway for street lights.
Reviewed by: Ronnie Bolin Date: 1 -15 -04
CERTIFICATE OF GREENWAY DEDICATION
"STATE OF TEXAS )
COUNTY OF BRAZOS )
I (we) , owner(s) and developers of the land shown
on this plat, and described herein as Subdivision in the
City of College Station, Texas, and whose name(s) is /are subscribed hereto, hereby
dedicate in fee simple to the use of the public forever all greenways thereon shown for
the purpose and consideration therein expressed.
Owner(s) "
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City, will constitute a completely
new review.
3 of 3