MEMORANDUM
January 24, 2004
TO: Louise Fischer, Kerr Surveying, Via fax 691.8904
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CVM ADDITION (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, February 9,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for, February 19, 2004, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Carol Cotter or myself at 764 -3570.
Attachments: Staff review comments
cc: Cull V. Mancuso, P. O. Box 3480, Bryan, TX, 77805
Case file #04- 00500006
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CVM ADDITION (FP) - 04- 00500006
ENGINEERING
1. Please note: The City will not be responsible for replacement of the shed that
encroaches into the sanitary sewer easement should the City ever have to work in
that easement.
2. Revise the Final Plat to reflect the easements requested for the Preliminary Plat.
Reviewed by: Carol Cotter
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2004 version of plat and /or site plan.
email to rbolin(a)-cstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
9. Developer provides a 20' PUE along line S53d51'40" for entire length of property.
10. Developer changes 10' sanitary easement along line at N41d58'29 "E to a PUE
entire length of property.
11
Date: January 22, 2004
for
Developer provides 10" PUE along line at N49D32'42 "W for 141.56. Which is along
Texas Ave, for entire length of property.
Reviewed by: Ronnie Bolin
Date: 1 -15 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.