Loading...
HomeMy WebLinkAbout00072180EXISTING PLANTS* TREE 9 N6fVftfffft BARRICADE AREA Canopy Tree 35 pts. Non - canopy Tree 40 pts. TREES WITHIN BARRICADE AREA Canopy Tree 200 pts. 300 pts. Non - canopy Tree 75 pts 150 pts. "a" * To receive landscape points, all existing trees must be in and reasonably free of damage by insects and /or disease. 2" to 14.5" caliper 1.25" caliper and larger Between 4" and 8" 8" and larger Between 2" and 4" 4" and larger good form and condition C. 100% coverage of roundcover or grass is required -in pparking lot islands swales and drainage areas, and the 24' landscape reserve.. unles& otherwise:.landscai; cd or existing plants are preserved. 100% coverage of roundcover or grass is also required in all unpaved portions of street or highway right -of -way on or abutting the property and adjacent property that has been disturbed during construction. If grass is to be used for groundcover, 100% live grass groundcover is required, whether by solid sod overlay or preplanting and successful takeover of grasses. D. Every project must expend a minimum of 50% of its point to E. Every development must employ an irrigation system. F. Additional Point Credits 7 (1) A ten percent (10 %) point credit will be awarded if twenty -five percent (25 %) or more of parking area consists of enhanced paving. (2) A ten percent (1 0 %) point credit for every one percent (1 %) of site area devoted to special facilities fountains benches and lanters water features, etc.). G. Separation Requirement - Canopy trees must be planted at a minimum of twenty feet (20') from other canopy trees. Live Oaks (Quercus viginiana) must be lanted at minimum of 35' from other Live Oaks. P ac H. Dispersal Requirement - Landscaping must be reasonably dispersed - throughout all visible areas of the site. 11.3 STREETSCAPE REQUIREMENTS A. Along all major arterials and freeways one canopy tree for every twenty -five feet (25 of frontage shah be installed. Two (2) non - canopy frees may be substituted for each o canopy tree. Canopy and non -canopy trees must be selected from the Streetscape Plant List and may be iper) grouped as desired. One (1) existing tree (minimum of 4" cal may be substituted for each new tree. New trees must be planted within 50' (fifty feet) the property line along the street. B. Along minor arterials, one (1) canopy tree for every thirty -two feet (32') of frontage shall be installed. Two (2) non - canopy trees may be substituted for one (1) cano tree. Canopy and non - canopy trees must be selected from the Streetscape Plant List and may be grouped as desired. One (1) existing tree (minimum of 4" calipper) may be substituted for each new tree. New trees must be planted within fifty feet (50') of the property line along the street. C. Parking areas adjacent to a ROW shall be screened for any development if parking is located between a building and a street right -of -way. Screening may be accom lisped imum of using plantingg' above s, berms, structural elements, or combinations thereof, and mu P be a min 3 the parking lot pavement elevation. Zoning Ordinance Pane 1 1 - ? DEVLOPMENT FEE SCHEDULE * These application fees are paid initially with the original submission and include three staff reviews of the P lat/site plan and associated construction documen tsk'The fee will be reassessed for each additional staff revii PARKLAND DEDICATION FEES CONDITIONAL USE PERMIT — Site & Use 300.00* CONDITIONAL USE PERMIT — Use Only 300.00* CONDITIONAL USE PERMIT — Appeal P&Z's Decision to Council P$60.00 195.00 CONDITIONAL USE PERMIT — IHDC 150.00* CONDITIONAL USE PERMIT — Time Extension Staff Review Only) DEVELOPMENT PERMIT 200.00* FINAL PLAT 400.00* FINAL PLAT — Minor or amending 300.00* FINAL PLAT additional fee for public hearing) 200.00* FINAL PLAT additional fee for multiple sheets 55.00 LICENSE TO ENCROACH $325.00 MASTER PLAN 400.00* OIL AND GAS EXPLORATION PERMIT $2000.00 OIL & GAS PERMIT — Annual Renewal $300.00 ORDINANCE AMENDMENT — Re uest to P&Z or CC $120.00 ORDINANCE AMENDMENT — with Public Hearing $325.00 PDD AMENDMENT — Staff Review Only 75.00 PDD AMENDMENT — P&Z or CC Review Only no PH $135.00 PRC CASES (Driveway variance appeals etc. 150.00 PLAT AMENDMENT Master Preliminary & FINAL PLATS — Minor 220.00* PRELIMINARY PLAT 400.00* PUBLIC IMPROVEMENT PERMIT 150.00 PUBLIC INFRASTRUCTURE PLAN REVIEW & INSPECTION FEE $600.00 REQUEST FOR EXTENSION — Master & Preliminary Plats $200.00 REZONING $500.00 REZONING — PDD w /Conce t Plan $500.00 RIGHT OF WAY /EASEMENT ABADONMENT $300.00 SIGN PERMITS— Plan Review for Zoning Requirements $25.00 SITE PLAN 200.00* SITE PLAN AMENDMENT — Minor 200.00* SPECIAL DISTRICT REVIEW $200.00 VARIANCE — Subdivision Regulations $100.00 ZONING BOARD OF ADJUSTMENT CASES $150.00 DC NG LETTE Land Dedication Single Family Developments 1 acre per 101 Dwelling Unit's + Multi-Family Dwelling Unit $309 per Dwelling Unit Park Development fee Multi - Family Developments 1 acre per 101 Dwelling Unit's + $233 per Dwelling Unit Park Development fee Fee in Lieu of Land Dedication Single Family Lot 457 Multi-Family Dwelling Unit 345 FAX COVER PAGE Date: Friday, January 18, 2002 Time: 9:01 AM To: Russ Welch Fax Phone: 731 -8247 From: Bridgette George Title: Assistant Development Manager Company: City of College Station Address: 1101 Texas Ave College Station, TX 77840 Fax Phone: 979 - 764 -3496 Phone: 979 -764 -3570 Subject: Russ Welch Harley - Davidson Message: 5 pages including cover