OK 238.1 12/18/01 14:32:24 Joe Courtney Courtney Homes Microsoft Word - Pz05656.doc
OK 239.1 12/18/01 14:32:42 Chris Galindo Galindo Engineers a Microsoft Word - Pz05656.doc
OK 241 12/18/01 14:34:56 Cindy and Greg Skyp Microsoft Word - Pz05656.doc
CC,
~a a
I l (Z-710)
z z5 F~1
S
GALINDO ENGINEERS AND PLANNERS, INCA 24
TRANSMITTAL LETTER
27~ 2 0~~
GEP Project: ,29-01 Date: *,PV,
TO: 410,44X A0/ TGHGOCA;-.
e/TY O~ GOLLEG~' 67:~f T~'O~
FROM: ~R/S G.4G fNLt:; ~
SUBJECT: 5;k-YPAI-A ~Dt1~PLEX~S
TRANSMITTED: ( erewith
per your request
under separate cover
ACTION REQUESTED: ( ) review
(4-6`proval and signature
( ) information / use
DOCUMENTS: ("awings
cost estimate
report / specifications
correspondence
other
date copies description
~I /O I RE/!1sE-,z7 -g/71-~ F I-AIV ^E)'Z WAe7 eGA7--=- Je15"W&W
I I .W.4k1.0 / -=-,E7r1A1eo
COMMENTS:
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
cc
WA ¢ AfZ5. G,eE'G -',-kYf?AG,A O with enclosures,
with enclosures,
enclosures
( /o enclosures
City of College Station
Development Services
P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842
(409) 764-3570
NORTHGATE REVITALIZATION BOARD (NRB)
REVIEW SUBCOMMITTEE MEETING
December 18, 2001
TO: Cindy and Greg Skypala, via 806-353-1847
Christian Galindo, via 846-8868
FROM: NRB Review Subcommittee:
Elton Abbott, Jr., NRB Member
Ron Kaiser, P&Z Commissioner
Carolyn Williams, P&Z Commissioner
Staff Attending:
Natalie Ruiz, Development Review Manager
Molly Hitchcock, Staff Planner
Tammy Macik, Secretary
SUBJECT: Skppala Fourplexes• Discussion, consideration andpossible action of 6proposed
fourplex buildings to be located at 900 Wellborn Road in Northgate. (01--240)
The NRB held a meeting on Wednesday, November 21, 2001 to review the above-
mentioned project. Staff Planner Hitchcock began the discussion by stating that the fourplexes
are similar to an apartment complex but one difference is that they will be built on separate
lots to be sold separately. The dumpster and the parking will be shared by each lot. One item
that Ms. Hitchcock pointed out was the screening of the parking and the proposal being a 3-
foot cedar fence along the frontage of Maple Street. Sidewalks in this area are not in the City
of College Station Master Plan but with the new Northgate Ordinance passage, they will be
required. Ms. Hitchcock stated the two main items that need to be discussed is the mailbox
placement and the discussion of sidewalks. Commissioner Kaiser asked the applicant about the
mailbox placement. Mr. Galindo stated the idea is to get the cluster type box the post office
provides and then they will determine the location. Staff Planner Hitchcock stated that the
mailboxes, according the Northgate Guidelines, The Master Plan, and the Zoning Ordinance,
should be attached to the building when possible and enclosed in a structure similar to the
building. NRB Member Abbott stated that the placement will be at the edge of NG-1. Ms.
Hitchcock told the board that they can make recommendations on the design of the mailboxes.
Commissioner Kaiser suggested checking the aesthetics to make sure the theme is consistent
with the brick.
Ms. Hitchcock stated that a 3--foot cedar fence is being proposed. Ms. Hitchcock added
that the ordinance allows the screening to be of greenery or structural elements. Mr. Galindo
stated that their idea is to minimize the maintenance. The fence would require less
maintenance than greenery. Commissioner Kaiser asked historically what has been done with
this type of screening. Ms. Hitchcock stated most of the time you are seeing shrubs or an iron
Home of TexasA&M University
NRBMeeting
Fmject Skypala Foutplexes
Date 11/21/01
Page 2 of2
fence with shrubs but it is at the Board's discretion. NRB Member Abbott stated that the Board
has approved a fence with brick columns with cedar pickets between the brick columns. Mr.
Joe Courtney stated that the Skypalas' want to use what has already been used on the Tradition
Dorm project. Ms. Ruiz asked the Board if there is a specific feet of spacing they would like.
NRB Member Abbott recommended the intervals of 8 to 20 feet with 4-feet columns with stone
caps.
NRB Member Abbott made the motion to approve as submitted with the consideration
of the fence being brick pillars with cedar fencing in between the pillars and the location of the
mailbox to be worked out with the post office (with aesthetics matching the existing
architectural character), which will be reviewed and approved by staff. Commissioner
Williams seconded and it passed 3-0. The consideration of the sidewalk is being postponed at
this time due to the unknown time when the city will make street improvements.
Home of TexasA&M University
r
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
February 28, 2002
TO: Cindy & Greg Skypala, Via fax 806-353-1847
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SKYPALA FOURPLEXES (SDSP) - Site Plan
Staff reviewed the mail kiosk for the above-mentioned site plan as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review and approval:
Two (2) revised site plans.
If you have any questions or need additional information, please call Molly Hitchcock at
764-3570.
Attachments: Staff review comments
cc: Christian Galindo Galindo Engineering & Planners, Via fax 846-8868
Case file 6W_
Home of Texas A&M University
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
November 6, 2001
TO: Cindy & Greg Skypala, Via fax 806-353-1847
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SKYPALA FOURPLEXES (SDSP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review and review by the Northgate
Revitalization:
Eight (8) copies of the revised site and landscaping plans.
Please be aware that the following is due prior to the issuance of a building permit.
$ 8,280 in Parkland Dedication fees ($345/unit)
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call Molly Hitchcock or Spencer Thompson at 764-3570.
Attachments: Staff review comments
cc: Christian Galindo, Galindo Engineering & Planners, Via fax 846-8868
Case file #1-500240
Home of Texas A&M University
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
TRANSMITTAL LETTER
GEP Project: Z-1-47/ Date: /D. 2.5: 0/
TO: $R i D 6 E TTE 6VeRGF-
c-17Y of ci44549 5M77D111
FROM: l' H-491-C-5 #Z-RM HSG-Al
SUBJECT: 517-Le PLAN . SKYPALA FOUR PLEXES
TRANSMITTED: (herewith
per your request
under separate cover
ACTION REQUESTED: W, review
approval and signature
information / use
DOCUMENTS: W/drawings
cost estimate
report / specifications
correspondence
(,'other
date copies description
46.2-5-.01 1 /D 1 x/76 Pt.AW !WPI} A f'du
:AVON (3: P"e el
LIST' ( 3 PR6F5
i I 1 W JOO. 00 4PPUCA770N FFE
COMMENTS: ~',45EME~lT .4PY-A&J447-1,0,V SHE~7' V141- 8,~' ~U13i1.f~7 TE.d
[3 Y 0A6V A:-.2 co vc~4 ~.e~NT AV 17.1.1 .S/7)F- Al-AN A nAnP-a11AI
cc
lx' 66 i CINDY 4&Nkh (,with enclosures, w/o enclosures
R/with enclosures, o w/o enclosures
GALmDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
TRANSMITTAL LETTER
GEP Project: 24- D / Date: W-0 V, 14,, 2 00/
TO: A4.0 Y / 7-c,y000&
C/T ~ D~ GOL L GG3E' STA T/dam
FROM: G'H.2/5
GAG /NDD
SUBJECT: 9k-X
A ~DGI.~PL EX~S
TRANSMITTED:
rewith
per your request
under separate cover
ACTION REQUESTED:
(11-review
(approval and signature
( ) information / use
DOCUMENTS:
( drawings
cost estimate
report / specifications
correspondence
(her DEVFLO~'MFNT P°,E.~M/T sFP~°L/G~4T/O~l(
date copies description
COMMENTS:
cc: G~t''G SJ'//~1A ( with enclosures, w/o enclosures
with enclosures, w/o enclosures
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Firm: ~ C'~J , Date: I I/ I, ZQ l
Address: ?_01 Phone: '77E2 DF--C/4~ _Cx 7 76:~-23 Fax: '-7 7 Pp-
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
❑ Master Development Plan
❑ Preliminary Plat
❑ Final Plat
❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan
❑ Grading Plan
❑ Landscape Plan
❑ Irrigation Plan
❑ Building Construction Documents
w/ ❑
Redlines
❑ Development Permit App.
w/ ❑
Redlines
❑ Conditional Use Permit
w/ ❑
Redlines
❑ Rezoning Application
w/ ❑
Redlines
❑ Variance Request
w/ ❑
Redlines
Other - Please specify
w/ ❑
Redlines
,
w/ ❑
Redlines
w/ ❑
Redlines
w/ ❑ Redlines
~g
6
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑
Waterline Construction Documents
w/ ❑
Redlines
❑
Sewerline Construction Documents
w/❑
Redlines
❑
Drainage Construction Documents
w/ ❑
Redlines
❑
Street Construction Documents
w/ ❑
Redlines
❑
Easement application with metes & bou
nds decsription
❑
Drainage Letter or Report w/ ❑
Redlines
❑
Fire Flow Analysis
w/ ❑
Redlines
❑ TxDOT Driveway Permit
❑ TxDOT Utility Permit
Other - Please specify
Special Instructions:
G l'vI ~ A ~
TRANSMITTAL LETTER 1 of l
TRANSMIT.DOC 10/17/01
City of College Station
Development Services
P. O. Box 9960 - 1101 Texas Avenue - College Station, Texas 77842
(409) 764-3570
NORTHGATE REVITALIZATION BOARD (NRB)
REVIEW SUBCOMMITTEE MEETING
December 3, 2001
TO: Cindy and Greg Skypala, via 806-353-1847
Christian Galindo, via 846-8868
FROM: NRB Review Subcommittee:
Elton Abbott, Jr., NRB Member
Ron Kaiser, P&Z Commissioner
Carolyn Williams, P&Z Commissioner
Staff Attending:
Natalie Ruiz, Development Review Manager
Molly Hitchcock, Staff Planner
Tammy Macik, Secretary
SUBJECT: Skypala Fourplexes: Discussion and consideration and possible action of 6
proposed fourplex buildings to be located at 500 Wellborn Road in Northgate.
(01-240)
The NRB held a meeting on Wednesday, November 21, 2001 to review the above-mentioned
project. Staff Planner Hitchcock began the discussion by stating the fourplexes are like an
apartment complex but everything will be built to each lot so the lots can be sold off separately.
They will be sharing of the dumpster and the parking. One item that Ms. Hitchcock pointed out
was the screening of the parking. It is being propose to put a 3-foot cedar fence along the
frontage of Maple Street. They are not proposing any sidewalks on the public streets. They are
not in the City of College Station Master Plan but with the new Northgate Ordinance passage, it
will be require. Mr. Galindo asked about two different signs but since staff has not review the
signs, Commissioner Kaiser recommend we come back to it later. Commissioner Kaiser asked
Ms. Hitchcock if the items in the staff report were the items to be discussed. Ms. Hitchcock
stated the two main items that needs to be discussed is the mailbox placement and the discussion
of sidewalks. Commissioner Kaiser asked the applicant about the mailbox placement. Mr.
Galindo stated the idea is to keep the cluster type box the post office provides and the location
will be determine by the post office near the entrance he presume. Staff Planner Hitchcock stated
that the mailboxes, according the Northgate Guidelines, The Master Plan, and the Ordinance, it
Home of Texas A&M University
NRB Meeting
Project
Date
Page 2 of 2
would be attached to the building when possible and enclosed in structure similar to the building.
NRB Member Abbott stated that the placement will be at the edge of NG1. Ms. Hitchcock stated
to the board that they can make recommendation on the design of the mailboxes and staff can
check that when it comes in. Commissioner Kaiser added estatics concideration if it is
thematically consistent with the brick.
The next item to be considered is the screening of Parking lot. Ms. Hitchcock stated that
a cedar 3-foot fence is being proposed . Ms Hitchcock state the ordinance allows the fence to be
planting spot ms or structural elements. Mr. Galindo stated that the idea is to minimize the
maintenance to an easement. Mr. Galindo stated they are limited to amount of trees that can put
in. The wall would require less maintenance than the brushes. Mr. Galindo stated they will
begin the wall at the tangent points where it curves on the property line as close to the driveway
as possible. Commissioner Kaiser asked historically what has been done with this type of
screening. Ms.Hitchcock stated most of the time you are seeing shrubs or iron fence with shrubs
but it is at the Board's discretion. NRB Member Abbott stated that the board has approved a
fence with brick columns with cedar infield between the brick columns. Mr. Joe Courtney stated
that the Skypalas is wanting use what is already been used on the Tradition Dorm. Ms.
Hitchcock asked if the brick columns will be at each end or at different intervals? Ms. Ruiz
asked the Board if there is a specific feet of spacing you would like to see? NRB Member Abbott
recommended the intervals of 8 to 20 feet with 4-feet columns, which would be taller than the
fence. Commissioner Kaiser if there was anything else to dicuss. Ms. Hitchcock stated that
sidewalks needed to be considered. Ms. Ruiz stated that with streets without curbs and gutters
the Maple Street the four-plex will be built on, you will not see sidewalks.
NRB Member Abbott made the motion to approve as submitted with the consideration of the
fence being brick pillars with cedar fencing in between the pillars; location of the mailbox to be
worked out the post office with estatics consideration matching the existing architectural
character and review by staff. Commissioner Williams seconded and passed 3-0. The
consideration is sidewalk is being forego at this time due the under time when the city will put in
the sidewalks.
Home of Texas A&M University
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
TO:
FROM: Bridgette George, Assistant Development Manager
SUBJECT: SKYPALA FOURPLEXES (SDSP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page
is a list of staff review comments detailing items that need to be addressed. The
next submittal will be the third and final review by staff for this round of reviews.
If all items have not been addressed on the next submittal, another $100
processing fee will need to be submitted for the subsequent set of three (3)
reviews. Please address the comments and submit the following information for
further staff review:
Two (2) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached.
OR
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan,
please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 764-3570.
Attachments: Staff review comments