HomeMy WebLinkAbout00071672J,
STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SUB SEC 1 PH 1 (FP)-FINAL PLAT (1-500243)
ENGINEERING
1. Please add a certificate for the City Planner.
2. Everything else looks fine.
Reviewed by: TED MAYO Date: 10/31/01
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer installs street lighting as per city specs and design.
3. Developer provides temporary blanket easement for construction
purposes.
4. Developer provides digital of plat and/or site plan for AutoCAD 14. Email
to rbolin(a)ci.college-station.tx.us.
5. Developer provides easements for electric infrastructure as installed
(including street lighting).
6. Upon completion of project surveyed sealed meets and bounds
descriptive easements are necessary to release temporary blanket
easement.
Reviewed by: Ronnie Bolin Date: 11-1-01
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City, will constitute a completely
new review.
Home of Texas A&M University