10.4b ACRES - 94 UNITS
11/02/01
ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION
ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION
WATFRI IMP
1
6" PVC WATERLINE
L.F.
2950
$18.00
S53,100
2
8"X6"TAPPING SLEEVE & VALVE
L. S.
4
$4,000.00
$16,000
3
WET CONNECTIONS
L.S.
6
$500.00
$3,000
4
8"X6"TEE
EA.
2
$500.00
1000
5
8"X6" RUDUCER
EA.
2
350.00
$700
6
6" VALVES
EA.
8
550.00
4,400
7
6"X90 DEG. BENDS
EA.
12
$250.00
$3,000
8
STD. FIRE HYDRANT
EA.
I
1,600.00
1600
CFWFRI INF
9
8" PVC SAN. SWR.
L. F.
2131
$22.50
$47,948
10
STD. SAN. MH (6'DEPTH)
EA.
8
11,650.00
$13,200
11
X-DEPTH MH
V. F.
27
$90.00
$2,430
12
CLEAN-OUT
EA.
8
$1,650.00
$13,200
13
CONNECT TO X-LINES
L. S.
8
$500.00
$4,000
MICC'FI I ANI=0115
14
EROSION 8 SEDIM. CONTROL
LS.
1
$2,000.00
$2,000
15
1
TRENCH SAFETY
L.F.
2131
$1.00
$2,131
16
1.5% PERFORMANCE AND PAYMENT BOND
L.S.
I
$2,515.63
12-516
WATERLINE = $82,800
SANITARY SEWER = $80,778
MISCELLANEOUS = $6,647
TOTAL ESTIMATED CONSTRUCTION COST = $170,224
Z..
HESTER ENGINEERING COMPANY
7607 EASTMARK DRIVE, SUITE 253-8
COLLEGE STATION, TX 77840
979.693.1100
o __rv •~nw,<<d d,r srIT roe
B. A. CATHEY, INC. 1401
P.O. BOX 9517
COLLEGE STATION, TX 77842
35-1054/1130
PH# 409-870-5031 DATE~~ Z 237
/
PAY
TO HE Q ~ 4 60 I
ORDER OF
f
CC -v !I : i i> / 1J~ s~/~i3L C/R~ O LL A R S
® Compass Bank
College Station, Texas
cW
FOR- I - - - - - --tir
i
V00 1,40 LII' 1: L 1,30 L054?': ?44 L09j3?u'
fbf~ land ~(%c6r6ti ~es
acon ~0 s plLr+oc
-24 7
4 ~Ul ~d i n9s -
'3~5Gd.-2<g uni-fs
i
r
IG
'!f
WJLUt-~
E V -
s` z
Nu I red C.
2S 0' 1-41 c, t+
f5, (0
a
ck~
,rl t J i 'c~i~~fl u
l
I,
~r
Phase Two:
Points su plied by installing streetscape tre (4,560 points):
(new) 3.5" caliper Bald Cypress 300 pts/ea = 3000 points
8- (new) 2.5" caliper Cedar Elm 150 is/ea - 1200 points k
b9! (new) 1.25" caliper Crepe Myrtle W0 pts/ea = 360 points
Points for installing new non-canopy trees (960 points):
X24- 30 gal Crepe Myrtle *0 pts/ea = 960 points ✓
Points for installing new bushes/shrubs (700 points):
C42- (new) 5 gal Oleander 10 p s/ea = 420 points
28- (new) 5 gal Buford Holly 41 0 pts/ea = 280 points
Total Points Supplied= 4,560 + 960 + 700 = 6,220 points ✓
Welborn:
24- 30 gal Crepe Myrtle
Fraternity Row:
10- (new) 3.5" caliper Bald Cypress
8- (new) 2.5" caliper Cedar Elm
9- (new) 1.25" caliper Crepe Myrtle
Shrubbery Inside Complexes:
252- (new) Indian Hawthorne P
168- (new) 5 gal Buford Holly U
i - "Lj -1
~kry ~ti
S G
CcrnmJ~
PREDEVELOPMENT MEETING
The purpose of a predevelopment meeting i5 to meet the City Staff that will be involved
with your development and identify general isoueo that need further analyoio. Along with
the diocuooion of theoe major iooueo, staff will talk about the development proceoo,
distribute neceooary information and diocuoo what permito will be required for your
particular development. Thio meeting io in no way a complete review of your project.
Staff will perform a formal thorough review once the minimum requirements are
oubmitted for your particular development.
Date of Meeting:
Applicant(s):
City staff present:
V1NO to
~ \--L
roposal:
Se.~~ AS Co~oS
Miscellaneous:
c~~c~~
e ci\
Utility l oouco:
Water Availability/Capacity:
Sanitary Sewer Availability/Capacity:
Impact feco:
Electrical
~ ~ -~eC ~ c-o~. b~eK Cs~c net -
Fire %drant
mlocellaneom
Landocaping/5treetocape:
5idewalko:
Dumpoter Location:
Signs:
5creening/Bufferitie:
Variance Keq,ucoto: