Loading...
HomeMy WebLinkAboutMisc10 )ZlC)\ 'Fys \6 bV ~ ~ October 25, 2001 5-M R .G C o H 01 (a Mn ~a 3 Y3u~u, H~rn~ •L C L L a C M C ca °'c - U j (n pf C : m WC»(Za w a c~ va ~ o n. cn mM U C G f. ui a .C _tf fa ri a n a a o~c 4;~ 14 J J W H d' 00 N ai X ir + 0 M M 4j at M IM vr% o+ $ " u'♦1 V ~ Bridgette George City of College Station Development Services 1101 Texas Avenue College Station, TX 77840 Re: Magnolia Place Dear Bridgette, Attached are the revised copies of sheets 7 and 10 for the Magnolia Place Dormitory, to be stamped approved. The revisions were made per a telephone conversation with Spencer Thompson regarding asphalt repair on University Oaks. Please call if you have any questions. Veronica J.1Mo: Managing Partner Cc. File CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 . College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM September 22, 2001 TO: Veronica Morgan, Mitchell & Morgan, LLP, Via fax 260-3564 FROM: Bridgette George, Assistant Development Manager SUBJECT: MAGNOLIA PLACE DORMITORY (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: The Construction Document Mylars for staff to stamp approved and then please provide the following: Six (6) complete sets of approved construction documents for the proposed development with the revised site and landscaping plans attached; Two (2) revised site plans; and, One (1) revised landscaping plans. Please submit additional sets for your copy. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Michael Peter, Asset Campus Housing, Via fax 512-231-2277 Case file #1-500215 Home of Texas A&M University [Bridgette George - Asset Campus Housing Comments From: Pete Caler To: Natalie Ruiz Date: 9/18/01 2:05PM Subject: Asset Campus Housing Comments f _ - ~ Page 1 oI-x6 Veronica Morgan met with me today concerning this project. The site plan she showed me is acceptable for sanitation collection operations as long as the driveway remains as it is drawn and not offset from the service area. Our vehicle will be able to service the container without doing any backing maneuvers on the public right-of-way (Dominik). If the drive is offset, we would not be able to access the container where it is currently placed. I also gave her some dimensions for screening the container. Thanks. Pete Caler Sanitation Superintendent City of College Station Phone: (979) 764-3690 Fax: (979) 764-3489 CC: Bridgette George; Tammy Macik CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM September 24, 2001 TO: Veronica Morgan, Mitchell & Morgan, LLP, Via fax 260-3564 FROM: Bridgette George, Assistant Development Manager SUBJECT: MAGNOLIA PLACE DORMITORY (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) set of revised construction sheets to be merged with the original set of construction documents. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Case file #1-500215 Home of Texas A&M University C I is CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM September 24, 2001 TO: Veronica Morgan, Mitchell & Morgan, LLP, Via fax 260-3564 FROM: Bridgette George, Assistant Development Manager SUBJECT: MAGNOLIA PLACE DORMITORY (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) set of revised construction sheets to be merged with the original set of construction documents. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Case file #1-500215 Home of Texas A&M University DEVELOPMENT SERVICES TRANSMITTAL LETTER V -~1 ll 0/ Name/Firm: J j(1 I ~ © r Date: I / 7l D 1 Address: J1 / I've (5 Phone. rf s wz~ V, , T , ~f Fax: `73 l We are transmitting the following for Development Services to review and comment: (Check all that apply.): ❑ Master Development Plan ❑ Preliminary Plat ❑ Final Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR Site Plan LJ Grading Plan LA Landscape Plan LJ Irrigation Plan ❑ Building Construction Documents w/ ❑ Redlines ❑ Development Permit App. w/ ❑ Redlines ❑ Conditional Use Permit w/ ❑ Redlines ❑ Rezoning Application w/ ❑ Redlines ❑ Variance Request w/ ❑ Redlines ❑ Other - Please specify w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are in ❑ Waterline Const ❑ Sewerline Consl ❑ Drainage Const; ❑ Street Construc- ❑ Easement applil ❑ TxDOT Driveway Permit ❑ TxDOT Utility Permit ❑ Other - Please specify ❑ Drainage Letter ❑ Fire Flow Anal Pf tau jt~/,~ Special Instruction: 5 J l , , , P/0-st *ck TRANSMITTAL LETTER I 0f I TRANSMIT.DOC 10/17/01 Certificate of Occupancy Project: 6t1,a 440,-aL/~(~~ 0 0 ❑ Site/ Landscaping inspection approved ❑ Public Works ❑ Engineering approved ❑ Public Utilities ❑ Electrical ❑ Water (backflow devices) (date) (date) n / nn ,n~ (date) / tit ( ate) ❑ Parkland dedication (if applicable) o $ ❑ Fire (date) ❑ Legal (easements) (date) ❑ Certificate of Occupancy issued Conditions of C.O.: (date) e r mgt (date) - INSPECTION CHECKLIST - FOR CERTIFICATE OF OCCUPANCY Multi-Family and Commercial Projects Planning & Development Engineering Items (Exterior) • All pavement must be in - especially around perimeter. • All curbing must be installed, including edges of future phases. • All parking spaces must be striped, including handicap spaces. • Spot check dimensions of spaces and circulation aisles. (9'x18' with 2' overhang or 9'x 20' without overhang; 2-way circulation aisles must be 23' wide; 1-way can be 20'wide) • All islands must be curbed raised, and either planted or bricked (decorative pavers, stamped colored concrete O.K.) and located as shown on approved plans. • The Dumpster screening must be installed as shown on approved plans. • The landscaping must be installed and appear to be similar to approved plan. • The site must be clean and free of construction debris, equipment, job shacks, sand, dirt, etc. • The development, construction and finance signs must be removed. • The adjacent lots disturbed during construction must be returned to original conditions (graded, seeded or sodded, debris removed). • Handicap ramps must be installed. • Handicap signs must be installed. • Fire lanes must be painted in locations shown on approved plan. • Detention with groundcover must be installed and located as shown on approved plan. Look to see if water can get into and out of the pond- per the approved plans. • If grass is the ground cover to be used for general landscape and detention requirements, the sod must be installed or there must be evidence that the area has been seeded or hydromulched. IF ANY OF THE ITEMS HAVE NOT BEEN COMPLETED, PLEASE CONTACT THE ASST. DEVELOPMENT MANAGER IN CHARGE OF THE PROJECT AT 764.3570