Loading...
HomeMy WebLinkAbout00071474D I'cr!D P." F Fla utcd :.I it r1l. 0 icy a 1,11.11 !btccl .aiirllc f-.a n1c .a n0 .I'°2 A n ru fAcoo :a u d fill c r In tic ri ill ; lit °iit h flvu r ccul. lighting Catic (0utvg°atcr pn C213I Et,ucca ai:tcrier frri-311 :ac r-jic rc.Adcr ha,ard 120 alt. I'' 9'4 aA ,t IL Ilamily Church 30 ii S•l~ fai ar-a C-ahinct. 15' 0 . I PIC-W I 15har VAM C (I Pic': -+2 Ybm, rill Of, _ 1 ti r1i y' Q 1 l l f 1?.--JO, Yl1011 281-420-3083 W. K.281-42-P-3684 li fee 131 ber t1NN4M 4*0+16 WPON&W ft mom~ ilhn~+~~'~~~IA~711L~1•wd1~~r+~Maf.1+~~i4~r1N1slra11~~4r~~I1r11M~ltl~i~118"Nam w~* Canvlluclien Ilalee: RIGHT SI GI 6 0 17218 PORTER U I Covenant 12o %blt PORTER T 77365 0 Family Church 1D r1rF*~ +3 O m itaFk lellab A ALOWABLE AREAS FOR FREESTANDING SIGNS FRONTAGE MAX. AREA' (FEET) (SQ. FT.) 0-50 25 51-100 50 101-150 75 151-200 100 201-250 125 251-300 150 301-350 175 351-400 200 401-450 225 451-500 250 501-550 275 551-600+ 300 NOTES TABLE I 1. FRONTAGE - the number of feet fronting on a public street to which a sign is oriented. 2. AREA - the area in square feet of a single face sign. or (1) side of a double face sign. or half the sides of a multi-face sign. 3. The area of a freestanding sign is the area enclosed by the minimum imaginary rectangle of vertical and horizontal lines which fully contain all extremities. exclusive of supports. of a horizontal view of the sign. 4. The maximum area of any freestanding sign may not exceed either that allowed by the chart above or the square of (1/6) the distance in feet from the base of the sign to the curb or pavement edge of the frontage street. whichever is greater. 15. On corner lots. the frontage street shall be the greater street as classified on the throughfare plan.-Where two streets are the same. the applicant may choose the frontage street. ALLOWABLE HEIGHTS FOR FREESTANDING SIGNS (Distance from curb/ pavement edge in feet) AT LEAST LESS THAN HEIGHT 10 15 4.5' 15 20 8.0' 20 25 11.0' 25 30 14.0' 30 35 16.0' 35 40 19.0') 40 45 21.0' 45 50 23.0' 50 55 26.0' 55 60 29.0' 60 65 31.0' 65 70 34.0' 70+ 35.0' 0100+ `50.0' NOTES 1. _DISTANCE.FROM CURB -.the distance in feet from .*the curb or pavement edge to the nearest part of the sign. 2. HEIGHT -height of the sign measured from the elevation of the curb or pavement edge. 3. No freestanding sign shall exceed 35' in height except as in No. 5 below. 4. On corner lots only. the frontage street (as defined in No. 4. above) can be used to determir:. height and area. '5. Tracts zoned C-1. C-2. C-3. M-1 & M-2 with a mini- mum 100' of frontage on S.H.6 East Bypass may have a sign up to a maximum of 50' in height with a minimum distance from the right-of-way of 100'. The sign shall not be closer than 200' to any property zoned R-1. R- IA. R-2 or R-3. Zoning Ordinance Page 12 - 12 TABLE II Summary of Sign Regulations Sign Permitted Maximum Maximum Number Permit Classification District Area Height Setback Allowed Required Subdivision all 150 sf 15' 10' from ROW Sec. 12.3, B yes Area I.D. all 16 sf 4' 10' from ROW Sec.12.3.13 yes Apt./Condo/MH R-4.R-5,R-6,R-7• 100 sf 10' 10' from ROW 1/project' yes Development all 35 sf on 50 ' ROW 15' 10 ' from ROW 1 yes (Project) 65 sf on 60' ROW 150 sf on 70' ROW 250 sf on >70' ROW Development all same as above 15' 10' from ROW 1 yes (Subdivision) Traffic R-4, R-5, R-6. A-P. 3 sf 4' 4' from curb 1/curbcut no Control C- 1, C-2, C-3, M-1, M-2 Real Estate all <150' frontage-16sf 8' 10' from ROW Sec. 12.3.G no > 150 ' frontage-32 sf Finance/ all < 150' frontage-16 sf 8' 10' from ROW 3 eonst. no Construction > 150 ' frontage-32 sf 1 finance Political all See Table 1 10 ' from curb n/a no if area > 2 sf Roof shall be treated as commercial freestanding sign Freestanding A-P 100 sf 10' 10' from ROW 1 /premise yes if > 2 acres Freestanding C-1, C-2, C-3. M-1 ,M-2 See Table 1 See. 12.3.K yes Low Profile A-P, C -2. C-3. 60sf 4' 10' from. ROW. -Sec. 12.3.K yes Attached Sec. 12.3.L yes Exem t Sec. 12.3.P p Prohibited Sec. 12.3.0 • Refer to Sec. 12.3.C. (As amended by Ordinance No. 1695 dated February 12, 1987) Zoning Ordinance Page 12 - 13 SIGN AREA i~-Y-~j ~ SIGN (X)(Y)=AREA MINIMUM CONDITIONS FOR MORE i THAN ONE FREESTANDING SIGN street ' Property Une . 1000' MIN. ' z Sign ~~Sign I ~ o f I Zoning Ordinance Page 12 - 14 Curb Line ~ ee- 40's, s er S 1 o0 X ~Lo Seib - ack a, FREESTANDING SIGN (X) (Y) =AREA e~ iCurb Line less edge 1~0 p~0 Spree o R the . SO ~Y etb aek • X 4' MAX. LOW PROFILE SIGN (X)(Y),<,60 SQ. FT. Zoning Ordinance Page 12 - 15 I Proiect Presentation 1 The City Council has implemented a policy whereby applicants and developers are expected to present their case to the Council. This policy will primarily affect requests for rezonings and ordinance amendments. The Council will first hear a brief presentation by staff. Next, the applicant and/or developer will make their presentation. The public hearing will be opened after the applicant's presentation. Please be aware that the Planning and Zoning Commission has implemented a similar policy. Applicants and developers, who have a project before the Commission, will present their case to the Commission after the staff presentation. This policy will apply to almost all items on the regular agenda before the Commission, including rezonings, ordinance amendments, master plans, plats and conditional use permits. Again, for those items requiring a public hearing, the applicant and or developer will be able to make their presentation prior to the opening of the public hearing. Applicants with an item on the consent agenda should be prepared to answer questions if the item is pulled off of the consent agenda. This information is supplied to applicants with the intent to provide guidance as to the content of the applicant's portion of the project presentation to the Council and/or the Planning and Zoning Commission. This is an opportunity for the applicant and/or developer to explain the purpose of their request, to present a counter viewpoint or to stress the advantages of their proposal. Special consideration should be given to addressing the reasons for any variances requested. Following is a list of items applicants should be prepared to discuss during their presentation to the Council and/or the Planning and Zoning Commission (grouped by type of request). All the suggested items may not apply to each case. Several of the bullet points are key phrases referring to additional information that can be found in the City's Code of Ordinances and/or the City's Comprehensive Plan. There may be some overlap between the staff and the applicant's presentations. If necessary, please contact staff at least two days ahead of time to make arrangements to use the City's media equipment. Project Presentation. doc REZONING: Applicants should be prepared to address: Item Summary: (Please be aware that the Council and Commission must consider all the potential uses in a given zoning district.) ■ Purpose for request ■ Why did applicant choose to request this zoning versus others available? ■ Surrounding uses/zoning ■ Development Activity in the vicinity ■ Market influences ■ Property configuration/dimensions will allow development under proposed zoning? ■ Potential impacts to surrounding uses/infrastructure, esp. traffic • Proposed mitigation of negative impacts, buffering, etc. ■ Neighborhood meetings ■ Actions pending (platting, additional zoning, site plan) ■ Discuss any potential oversize participation requests ■ Relationship to approved master plan For PDD rezoning requests the applicant should go into some detail about the proposal, as well as, explain what benefit the City may realize from this proposal as opposed to a standard zoning district in this particular location. Staff will continue to address: Comprehensive Plan Considerations: • Land Use Plan - Changes in conditions, Surrounding uses (existing and on future LUP) • Special Area Plans (EBP, City Center, University Dr., 2818, WPC, 30/60) • Thoroughfare Plan • Parkland Dedication, Open Space Dedication, Greenways • Development Policies • CIP projects near site Item Background: • Annexed • Rezoned • Platted • Recent actions Related Advisory Board Recommendations: Parks Board, NRB, DRB Infrastructure and facilities: • Water: adequate capacity - adequate fire coverage? • Sewer: adequate capacity? • Streets: Classification on Thoroughfare plan; conditions, adequate capacity? • Off-site Easements • Drainage • Flood Plain • Oversize request • Impact Fees Project Presentation. doc 2 CUP and C-N DISTRICT USES: Applicants should be prepared to address: Item Summary: ■ Purpose for request ■ Surrounding uses/zoning ■ Development Activity in the vicinity ■ Market influences ■ Property configuration/dimensions ■ Potential impacts to surrounding uses/infrastructure, esp. traffic ■ Neighborhood meetings ■ Actions pending (platting, additional zoning, site plan) ■ Be prepared to discuss items to mitigate adverse effects of the proposed use. These may include, but are not limited to, increased open space, loading and parking requirements, additional landscaping or buffering, and additional improvements such as curbing, sidewalks and screening. Staff will continue to address: Comprehensive Plan Considerations: • Land Use Plan - existing and future uses on subject site and in rest of area • Special Area Plans (ex. Northgate Revitalization Plan, WPC, EBP, etc.) • Thoroughfare Plan • Parkland Dedication, Open Space Dedication • Proposed development - varies from zoning restrictions? (Height, setbacks, etc.) • Signs (what district regulations will restrict signs?) • Discuss items to mitigate adverse effects of the proposed use. These may include, but are not limited to, increased open space, loading and parking requirements, additional landscaping, and additional improvements such as curbing, sidewalks and screening." Item Background: • Annexed • Zoned • Platted • Recent actions Infrastructure and facilities: • Water - adequate capacity • Sewer - adequate capacity • Streets - adequate capacity • Off-site Easements • Drainage • Flood Plain • Oversize request • Impact Fees Project Presentation. doc 3 MASTER DEVELOPMENT PLANS AND PLATS (PRELIMINARY. FINAL & REPLATS): Applicants should be prepared to address: Item Summary: ■ Reason for request ■ Reason for any variances requested from the Commission ■ Explain any variances already granted by ZBA ■ Surrounding uses/zoning ■ Development Activity in the vicinity ■ Market influences • Actions pending (platting, additional zoning, site plan) ■ Discuss any potential oversize participation requests ■ Relationship to previously approved master plan or preliminary plat Staff will continue to address: Comprehensive Plan Considerations: • Land Use Plan • Special Area Plans (EBP, City Center, Univ. Dr. 2818, WPC, 30/60) • Thoroughfare Plan • Access/Cross Access/Driveway Compliance • Bikeways • Parkland Dedication, Open Space Dedication, Greenways • Compliance with any previously approved master plan or preliminary plat • Compliance with rezoning conditions • Compliance w/Subdivision Regulations Item Background: • Annexed • Zoned • Platted • Recent actions Related Advisory Board Recommendations: Parks Board Infrastructure and facilities • Water • Sewer • Streets • Off-site Easements • Drainage • Flood Plain • Oversize request • Impact Fees SPECIAL PROJECTS AND OTHER (WPC, Ordinance Amendments) These types of projects are rare. Please get with staff to determine what should be presented for these types of cases. Project Presentation. doc 4 STAFF REVIEW COMMENTS NO. 1 PLANNING 1. 2. 3 4. 5. 6. 7. Project: Covenant Family Church, Additional Parking - Conditional Use Permit Site Plan (01-55) Show 24' landscape reserve line. Trees and crepe myrtles do not serve as adequate screening for the parking from the ROW. If you want to use shrubs to screen, they must be arranged so that they will form a solid screen after one year's growth. Point of clarification - There are no easements and no utilities crossing the proposed or future parking areas? When are each of the existing wood buildings planned to be removed from the site? What will the proposed lighting in the parking lot be like? (Height, wattage, etc.) Please label the City limit line. Since there is not a building permit to tie the approval of the irrigation system to, we will need to see the irrigation plan and approve it before the final approval of the site plan. 8. Please be aware that if this plan is approved by the Planning and Zoning Commission, it will be valid for twelve months for you to begin site work on phase one. Once phase one is completed, you will have another twelve months to begin work on phase two before the conditional use permit will expire. Reviewed by: ENGINEERING Jessica Jimmerson Date: 3-13-01 Considerable development has occurred in the Harvey Hillsides area in the last 12 months. This site will have to curtail rainfall runoff rates to equal or less than predevelopment conditions. Your drainage letter does not explain that this project is complying with this requirement. Reviewed by: Spencer Thompson Date: March 8, 2001 ELECTRICAL 1. No Comment Reviewed by: Staff Review Comments J:\PZTEXT\PZ04457.DOC Tony Michalsky Date: 03/02/01 Page 1 of 1