HomeMy WebLinkAbout00071440STAFF REVIEW COMMENTS NO. 2
Project: COCS WATER TOWER PROJECT (SP)-SITE PLAN (1-500182)
PLANNING
1. No comments
Reviewed by: JESSICA JIMMERSON Date: October 10,2001
ENGINEERING
1. All review no. 1 comments have been addressed. No additional comments.
Reviewed by: TED MAYO Date: 10/10/01
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments
Page 2 of 3
STAFF REVIEW COMMENTS NO. 1
Project: CS WATER TOWER PROJECT - SITE PLAN (01-182)
PLANNING
The landscaping plan for the area has not yet been submitted. Staff has contacted
Adams Consulting Engineering to determine the status of the plan.
Reviewed by: Jessica Jimmerson Date: 9-10-01
ENGINEERING
1. Sheet 4: OK
2. Sheet 5: Plan view- HEB taps; their sheet 12-2 shows three taps-6" fire line, 3"
domestic water, and 2" irrigation. You show one 6" connection. Please clarify.
Profile - Add Sta. 102+61.30, 18"x 8" Tee, 6" GV, 6" x 13" MJ Anchor Cplg Sta.
101 +14.75 and Sta. 100+82.07 describe the same connection. Please clarify.
3. Sheet 6: OK
4. Sheet 7: OK
5. Sheet 8: OK
6. Drainage Report: OK
Reviewed by: TED MAYO Date: 9/05/01
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan.
email to rbolin(a)-ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin
Staff Review Comments Page 2 of 1
Catalogt
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devises must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 3 of 1