Loading...
HomeMy WebLinkAbout00071429a...., -V6 as nnochi -The Gateway, Ph. 1 Page 71- From: Bridgette George To: Thomas Vennochi Date: 9/6/01 4:11 PM Subject: The Gateway, Ph. 1 Before I return these comments, I'm removing your first comment: 1. Will there be any greenbelt area or parkland dedication? All proposed dedications must be reviewed by the Parks and Recreation Board prior to P&Z Commission consideration. Since this is commercial property, parkland dedication is not required. Thank you! Bridgette George :o) Asst. Development Manager City of College Station (979) 764-3570 (979) 764-3496 {Fax} www.ci. college-station.tx. us CC: Ted Mayo PROPERTY OWNER'S INFORMATION LOTS 1 & 5, BLOCK 1, THE GATEWAY, PHASE 1-> /A S A Delmar Baronhead I Ltd 15900 Dooley Road Addison, Texas 75001 LOT 2R, BLOCK 1, THE GATEWAY, PHASE I l CSI Associates 18377 Beach Boulevard, Suite 208 Huntington Beach, CA 92648 LOT 4R, BLOCK 1, THE GATEWAY, PHASE I Maroon City Partners Ltd. 3214 Westchester Avenue College Station, Texas 77845 Transmit Log Record Status Log Date Time To OK 726 9/7/01 10:04:36 Brad Kerr BitWare Client Company Kerr Surveying Application Microsoft Word - PZ05290.DOC Page 1 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM September 6, 2001 TO: Brad Kerr, Kerr Surveying, Via fax 691-8904 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATEWAY PH 1 (FP) -Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, September 10 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for September 20, 2001, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and, One (1) Mylar original of the final plat with the appropriate signatures. If you have any questions or need additional information, please call me at 764-3570. Attaiaroon s: Staff review comments cc: r Baronhead I Ltd, 15900 Dooley Road, Addison, TX 75001 ssociates, 18377 Beach Boulevard, Suite 208, Huntington Beach, CA, 92648 City Partners, Ltd, 3214 Westchester Avenue, College Station, TX, 77845 Case file #1-500188 Home of Texas A&M University DEVELOPMENT SERVICES TRANSMITTAL LETTER ia~s~^SKIS Date: Name/Firm: - Address: Phone: Fax: /0.~~~Q~ We are transmitting the following for Development Services to review and comment: (Check all that apply.): ❑ Master Development Plan ❑ Preliminary Plat 19 Final Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR ❑ Site Plan ❑ Grading Plan ❑ Landscape Plan ❑ Irrigation Plan w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines w/ ❑ Redlines ❑ Development Permit App. ❑ Conditional Use Permit ❑ Rezoning Application ❑ Variance Request ❑ Other - Please specify ❑ Building Construction Documents INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Waterline Construction Documents w/ ❑ Redlines ❑ Sewerline Construction Documents w/❑ Redlines ❑ Drainage Construction Documents w/ ❑ Redlines ❑ Street Construction Documents w/ ❑ Redlines ❑ Easement application with metes & bounds dec sription ❑ Drainage Letter or Report w/ ❑ Redlin es ❑ Fire Flow Analysis w/ ❑ Redlines C„Pniat Tnctnintinnc- Y ❑ TxDOT Driveway Permit ❑ TxDOT Utility Permit ❑ Other - Please specify TRANSMITTAL LETTER 1 of 1 TRANSMIT.DOC 10/17/01 09/18/01 11:91A P.001 ITCH ELL lVtORG.AN, LLP ENGINEERS & CONSTRUCTORS 511 UNIVERSITY DRIVE, SUITE 204 COLLEGE STATION, TEXAS 77840 OFFICE (979) 260-6963 FAX (979) 260-3564 FACSIMILE TRANSMITTAL SHEET TO: FROM: Tom Vennochi Veronica J.B. Morgan COMPANY: DATE..: City of College Station 9/13/01 PAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVF.R 764-3496 2 PHONE NUMBER SEND13R5 REFERENCE NUMBER: 764-3496 RE: YOUR REFERENCE NUMBER: Gateway Subdivision ❑ URGENT ❑ FOR REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE NOT ES/COATMENTS: 09/18/01 11:31a P.00z c C c ~ o c o 'd ffl N 0=c. Odin [R . O a 0 C r 'a - 'c .En w Ln Ca U tea M c 00- CV Gi c 0- V -j N ~ < ^ (A ^ 0 H ai X ~rn CPI no Uj C N • U 4 n _ M 8M 7.4 V v V in LL ember 13, 2001 Tom Vennochi City of College Station Development Services 1101 Texas Avenue College Station, TX 77840 Re: Replat for Gateway Subdivision Dear Tom: As per our earlier discussion my client, Frank Mihalopoulos, requests that the replat for the Gateway Subdivision submitted for the September 20`h Planning and Zoning Commission be removed from the agenda. There are some details with regard to property line locations between Lot 1 and Lot 4 of the Gateway Subdivision that are still unresolved. We appreciate your understanding in this matW. If you have any questions please do not hesitate to call. Veronica J.B. MIS Managing Partner Cc. Louise Barker Tim Fox Kevin King Frank Mihalopoulos John Welsh