Loading...
HomeMy WebLinkAbout00071421STAFF REVIEW COMMENTS NO. 1 Project: ASHFORD SQUARE BLK A LOT 3-FINAL PLAT (1-500189) ENGINEERING 1. This item will go to P&Z. 2. No other comments. Reviewed by: Spencer Thompson Date: August 31, 2001 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides temporary blanket easement for construction purposes. 3. Developer provides digital of plat and/or site plan for AutoCAD 14. Email to rbolin(a).ci.college-station.tx.us. 4. Developer provides easements for electric infrastructure as installed. 5. Upon completion of project surveyed sealed meets and bounds descriptive easements are necessary to release temporary blanket easement. Reviewed by: Ronnie Bolin 8-31-01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Home of Texas A&M University