HomeMy WebLinkAbout00071421STAFF REVIEW COMMENTS NO. 1
Project: ASHFORD SQUARE BLK A LOT 3-FINAL PLAT (1-500189)
ENGINEERING
1. This item will go to P&Z.
2. No other comments.
Reviewed by: Spencer Thompson Date: August 31, 2001
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides temporary blanket easement for construction
purposes.
3. Developer provides digital of plat and/or site plan for AutoCAD 14. Email
to rbolin(a).ci.college-station.tx.us.
4. Developer provides easements for electric infrastructure as installed.
5. Upon completion of project surveyed sealed meets and bounds
descriptive easements are necessary to release temporary blanket
easement.
Reviewed by: Ronnie Bolin 8-31-01
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Home of Texas A&M University