Loading...
HomeMy WebLinkAbout00071411" DEVELOPMENT SERVICES TRANSMITTAL LETTER Name/Firm: -F&xo tj Date: ~5 ° Z 4 - t7 Address: 1102 6-7Oa 1lWl f~ Phone: rJ ll/°77 I 00 J S %qw :a 71 f~ Fax: 670- f 7q 7 We are transmitting the following for Development Services to review and comment: (Check all that apply.): ❑ Master Development Plan w/ ❑ Redlines ❑ Preliminary Plat w/ ❑ Redlines UJ~Final Plat w/ ❑ Redlines ❑ FEMA CLOMA/CLOMR/LOMA/LOMR w/ ❑ Redlines ❑ Site Plan w/ ❑ Redlines ❑ Grading Plan w/ ❑ Redlines ❑ Landscape Plan w/ ❑ Redlines ❑ Irrigation Plan w/ ❑ Redlines ❑ Building Construction Documents w/ ❑ Redlines YRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Waterline Construction Documents w/ ❑ Redlines ❑ Sewerline Construction Documents w/❑ Redlines ❑ Drainage Construction Documents w/ ❑ Redlines ❑ Street Construction Documents w/ ❑ Redlines ❑ Easement application with metes & bo unds decsription ❑ Drainage Letter or Report w/ ❑ Redlines ❑ Fire Flow Analysis w/ ❑ Redlines Special Instructions: TRANSMITTAL LETTER TRANSMTr.DOC OMY99 ❑ Development Permit App. ❑ Conditional Use Permit ❑ Rezoning Application ❑ Variance Request ❑ Other - Please specify ❑ TxDOT Driveway Permit ❑ TxDOT Utility Permit ❑ Other - Please specify I or I TE CON General Contractors Div. of CDS Enterprises, Inc. 1707 Graham Rd. • College Station, TX 77845 • 979-690-7711 • Fax: 979-690-9797 August 14, 2001 Bridgette George Asst. Development Coordinator City of College Station 1101 Texas Ave. South College Station, TX 77842 CU S-/ 5L&- 1 4 36, ai a iA/ RE: Castlegate Subdivision - College Station, Texas Dear Ms. George: Attached is the revised mylar of the Final Plat for Section 4, Phase 2, of the above referenced subdivision. The boundary was revised along the future Castlegate Drive extension so that the right-of-way of Castlegate Drive would be parallel lines on each side. Also, some of the dimensions were incorrect and these were corrected. Please let me know if this original can be filed or whether it needs to go through the application process and to the P&Z commission. The infrastructure construction is about 4 to 5 weeks from being completed. If you have any questions or need additional information, please do not hesitate to give me a call at (979) 690-7711. Sincerely Yours, W"~* Joe Schultz, P.E. Civil Engineer Attachment MEMORANDUM August 27, 2001 TO: Planning and Zoning Commission FROM: TED MAYO SUBJECT: FINAL PLAT for CASTLEGATE SUBDIVISION SEC 4 PH 2 (FP) Item: Discussion and possible action on a FINAL PLAT for CASTLEGATE SUBDIVISION SEC 4 PH 2 (FP), consisting of 22.94 acres (87 PDD-H single family lots) located north of Greens Prairie Road and west of Proposed SH 40. (1-500191) Applicant: JOE SCHULTZ FOR GREENS PRAIRIE INVESTORS, LTD. Staff Recommendations: Staff recommends approval as submitted. Item Summary: This is a revision to the final plat approved by the Planning and Zoning Commission March 1, 2001. The revision is to add two PUE's for electrical infrastructure as requested by the City and to make minor corrections to the bearing and distance of three perimeter boundary lines along Castlegate Drive. Attachments: 1. Area map 2. Application 3. Copy of Plat