Loading...
HomeMy WebLinkAbout00071407P t City of College Station Requirements for Electric Service: All electric service will be provided underground. • Electric department personnel have the discretion to provide overhead service if deemed appropriated. Developer / Owner is responsible for providing and installing at developers cost: • Conduits per Electrical Divisions spec and design. • 30 ft. of rigid conduit for riser poles (install first 10 ft. city will install remainder) provide weatherhead if secondary riser. • Concrete transformer pads for commercial and apartment complex projects per city specs and design. • Concrete junction box pads per city specs and design. • Subsurface pull boxes per city spec and design (pull boxes supplied by City). • Street lighting per city spec and design. • CT can on building if necessary per city spec and design. Developer / Owner needs to provide the City of College Station Electric Division with: • Plat and/or site plan • Digital (Autocad version) of plat and/or site plan. E-mail to rbolin@ci.college-station.tx.us • Electric load data for project (need ASAP transformer delivery is currently 15 to 20 weeks) Temporary Blanket easement (see attached form, fill out and return with necessary paperwork). Upon completion of project surveyed sealed meets & bounds descriptive easements are necessary to release temporary blanket easement. Electric service will not be energized unless easement form is on file in our legal department. 5-25-01 Date: City of College Station Contacts: Public Utilities Department Ronnie Bolin Electric Division Electric Planning & Project Coordinator, 979-764-6314 P.O. Box 9960 e-mail - rbolin@ci.college-station.tx.us College Station, Texas Fax # 979-764-3452 Tony Michalsky Electric T&D Superintendent, 979-764-3438 e-mail - tmichals@ci.college-station.tx.us We the undersign hereby request the City of College Station Electric Division to: Business Owner's Billing Address Phone # Fax # Estimated Date Needed Complete We further understand that we are to pay the City of College Station for the total cost (plus sales tax) of services performed for the following project, Thank you, Owner Signature Mail or Fax (see above for phone # or address) EASEMENT DEDICATION SHEET (To be filled in and submitted with construction plans and specifications for preliminary review) REQUESTING DEPARTMENT INFORMATION REQUESTED BY: EXT. (City Department and Name of Person to Contact) ACCOUNT NO. (For ordering title work, appraisals, etc.) PROJECT NO. TYPE OF EASEMENT: Public utilities(PUE) Temporary Blanket PUE (prior to budding permit) SPECIAL INSTRUCTIONS: REVIEW AND APPROVAL REQUIRED/GIVEN BY THE FOLLOWING DEPARTMENTS: Approval Required By: Electric Approval Given By: Electric Water/ WV (please initial) Water/WW Asst. City Engineer. Asst. City Engineer METES & BOUNDS DESCRIPTION CHECKED FOR CLOSURE BY: APPLICANT INFORMATION PROPERTY OWNER(S): (Names must be exactly as they appear on the dee ADDRESS: PHONE NUMBER: ALL LENDERS: (Names and Addresses IF OWNER IS A CORPORATION, PARTNERSHIP, OR JOINT VENTURE: 1. State of Incorporation/Registration 2. Partners' Names (if applicable) 3. Person Authorized to Sign (Name and e LEGAL DEPARTMENT MUST BE PROVIDED WITH THE FOLLOWING: 1. A copy of a recent (within 90 days) deed or title insurance policy showing the names of the grantors/owners 2. For unplatted property, a signed, sealed and dated metes and bounds description and a diagram of the property showing the location of the easement. 2. For platted property, a copy of the plat showing the lot, block, subdivision, and recording information. 3. For blanket easements, a signed, sealed and dated metes and bounds description and a diagram of the property. 5. Corporate or partnership owners must furnish a copy of a corporate resolution or other proof of authority to sign on behalf of the corporation, partnership, or joint venture. 6. Name, address and phone number of person who is to receive the easement and be responsible for getting it executed. Any IWW aa4uhldw resulting Gnpltal proveme P acts requtlas a meWng -WH the MR Depar&wnt I I i I I i ~ ~ ; I (D U I i ~ u i C ~ C O O, C") o -0 m O I N ~ N U ca O Q U 4-0 0 -j tm 4' 0 O U Q. o ° U p a3i z ~I I I , I ~ ~ U I • I I i ~ L O I I ~ ; ~ ! I i ' I i ~ I I i I I ~ C I I I t C ; i I , i I I ~ ' i I I ! I I I I I I I i I ' I ~ ~ _ U I ! I I I I I I ~ ~ ! I i I i I I ~ i ' I I I i j i i ~ I I 1 I ! I I ~ i i I i i I i i I I I I I I I ~ I l i I I ~ I I l i{ I I i L I ~ i I L i l l I i , - ' j l l l i j ! f m I I + i ; I, i i ! O LL I I i I I I , i i I Q I L ! ! i I I i i 1 I I I I I I ! I I I i I I I~ y C O Q- ~ V / ♦ ^ ` W ^ W CL L _0 - A ` O O _ - 3 (a W --I > (V m ca = O O O Q- L O N N N N N N N N N N N N N N N N +5 0) 0 O J N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O 'J 0 N N N N 0 0 0 0 0 0 0 0 0 0 0 a) C - O a) N O a) > 0)~ U U U - O N C t c 8 N N N N N N N N N O N V) co A2 V) V) a) U 4) a) a~ a) 'S co M0awwwn~~~~:~-g ! :029- :.5! !5.! !fft 12 U) 00 -j ~ z City of College Station Transformer Pad Specifications Concrete Pad D Conduit Entry G -G- Primary Secondary A - - C B E i NOTE, All dlminslons are in inches 1/2' Rebar 18' Center to ~ Center both ways. 0 81 I Class 'A' Concrete as Per City of Coltege Station Specifications. XFMR KVA A INCHES B INCHES C INCHES D INCHES E INCHES F INCHES G INCHES WEIGHT lb, 100 24 11 52 70 10 49 14 1,775 Single Phase 167 24 11 54 70 10 49 15 2,205 250 24 11 54 70 10 49 15 2,500 112"t 35 15 87 76 21 40 26 3,000 150 35 15 87 90 21 54 26 3,300 225 39 15 91 90 21 54 26 4,565 Three 300 46 15 91 91 21 55 22.5 4,915 Phase 500 46 15 110 105 21 69 32 5,800 750 53 15 110 105 21 69 28.5 81000 1000 53 15 111 105 21 69 29 9,500 1500 58 15 114 109 25 69 28 11,600 2000 58 15 114 120 25 80 28 15,000 SL ao' Y~oo- Y roc) c-) 0 QO ~ P yCO~ Q yo m zy O V z s z rr v U n