HomeMy WebLinkAbout00071370STAFF REVIEW COMMENTS NO. 1
Project: SHENANDOAH PH 7B (FP) -FINAL PLAT (1- 500140)
ENGINEERING
1. This is a Stop Review. In order for the subject property to obtain a final plat, the
property must be have an approved preliminary plat. The Approved Preliminary Plat
for this property has expired. The Subdivision Regulations allow for a Preliminary
Plat to be effective for 1 -year.
6 -13.3.6 Approval or conditional approval of a master development plan or master
preliminary plat shall be effective for one (1) year from the date of such notice, unless
reviewed by the Commission in light of new or significant information which would
necessitate a revision, in which case the Commission shall so inform the subdivider in
writing.
6 -13.3.7 If a final plat is not submitted within one (1) year of the effective date of
approval, the Commission may, upon written application of the subdivider, extend the
approval for an additional six (6) months.
The City allows the Preliminary Plat approval to be extended for 1 -year after a Final
Plat has been approved from the Preliminary.
These comments are provided for the convenience of the Applicant.
2. The City will be requiring the Developer to extend sewer service to the adjacent
property, west.
3. Please modify the utilities on the plat to reflect the changes.
4. If properties abutting the park will be inundated by the 100 -year flood, please reflect
this on the plat. A minimum first floor elevation may be required on the Final Plat.
5. Since Alexandria is not going through the Crowley Property the end of the
thoroughfare must be modified.
6. The City planner will be looking at traffic circulation in the area.
Reviewed by: Spencer Thompson Date: June 21, 2001
ri
Reviewed by:
Date:
Staff Review Comments Page 2 of 4
J: \PZTEXT\SRI.DOC
ELECTRICAL
1. Developer installs conduit as per city specs.
2. Developer installs street lighting as per city specs.
3. Developer provides necessary easements for electric lines as installed
4. Developer provides street light easements as per design
5. Developer provides rigid conduit for riser poles. Installs first ten feet. City will install
last 20 feet.
Reviewed by: Ronnie Bolin Date:6 -12 -01
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devises must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 3 of 4
J: \PZTEXT\SRI.DOC
Transmit Log Record
Status Log Date
Time To
BitWare Client
Company
Application
Page 1
OK 614 6/21/01 16:16:18 Michael McClure McClure Engineering, Microsoft Word - PZ04970.DOC
OK 613.2 6/21/01 16:28:42 Edward Froehling Microsoft Word - PZ04970.DOC
STAFF REVIEW COMMENTS
No. 2
Project: SHENANDOAH PH 7B (FP) -FINAL PLAT (1- 500140)
PLANNING
1. Please remove Bob Mosley as signatory and leave blank.
Reviewed by: SPENCER THOMPSON Date: July 20, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College
Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any
additional changes on these plans that have not been pointed out to the City, will constitute a
completely new review.
Staff Review Comments Page 2 of 3
Budgetary & Financial Summary: There will be an OP request on the lower portion of
the sewer line. The City has asked the Developer to construct a 12" line to
accommodate more land development in the area.
Attachments:
1. Area map
2. Application
3. Copy of Plat
Comprehensive Plan Considerations:
Land Use Plan: The LUE depicts this area as single - family residential.
Thoroughfare Plan: The T -Plan shows Alexandria continuing as a minor
collector through Phase 10 of Shenandoah. The Developer has extended
the street in accordance with the Plan. Southern Plantation Drive is shown
on the T -Plan as a minor collector and has been extended as such through
Phase 713.
Parkland Dedication: A 12 -acre tract is required to be dedicated for portions
of Shenandoah Subdivision and Alexandria Subdivision. The Parks
Department has already accepted an 8 -acre tract. The remaining portion of
the park will be dedicated with any future plat applications in Shenandoah
and Alexandria.
Open Space Dedication: There is no Open Space being dedicated with this
subdivision. However, this future park will join with a portion of Green Space
in the Crowley Subdivision to the south allowing for access from one to the
other.
Budgetary & Financial Summary: An OP request for a 12" sewer line to
accommodate more land development in the area was previously approved by
City Council.
Attachments:
1. Area map
2. Application
3. Copy of Plat