Loading...
HomeMy WebLinkAbout00071352STAFF REVIEW COMMENTS NO. 1 Project: TIGER EXPRESS (SP) -SITE PLAN (1- 500137) PLANNING 1. Need to edit the parking legend. The required parking for the convenience store square footage is16 spaces, which brings your total required spaces for the site to 27. 2. If there is not already irrigation installed where you are relocating your shrubs along the Wellborn Rd. side of your property, then you will be required to provide an irrigation plan to the City of College Station Development Services for approval. Reviewed by: Jennifer Reeves Date: 06/07/01 ENGINEERING 1. No comment. Reviewed by: Spencer Thompson Date: June 13, 2001 ELECTRICAL 1. Existing service for car wash must be relocated by owner /developer. Electric services cannot go under buildings. 2. Any changes in electric service, contact electric department representative. Reviewed by: Ronnie Bolin MISCELLANEOUS Date:6 -13 -01 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 3 J:\PZTEXr\PZ04950.DOC