HomeMy WebLinkAbout00071346• STAFF REVIEW COMMENTS No. 2 Project: EDELWEISS BUSINESS CTR LT 4 -5 -6 B 4 (FP) -FINAL PLAT (1- 500142) ENGINEERING 1. You are only required to construct the water line and not the hydrant. The hydrant can be constructed at the time of development. If you wish you may remove the hydrant from the plans. There may be a conflict between the water line and sewer manhole as shown on the plans. There must be a minimum 9 -ft separation between the two. If you remove the hydrant, please include a 2" blow -off at the end of the water line, as required. You may wish to extend the PUE at this time such that the hydrant will later be able to be installed without conflict. Reviewed by: Spencer Thompson Date: June 27, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 3 STAFF REVIEW COMMENTS NO. 1 Project: EDELWEISS BUSINESS CTR LT 4 -5 -6 B 4 (FP) -FINAL PLAT (1- 500142) ENGINEERING 1. Construction documents for water and sewer line extensions are required with this plat. It appears a fire hydrant may be required for development on Lot 6. 2. Please be aware that this site will be required to meet the City's new Zoning Ordinance Section 8.10. 3. In your application and note # 4 on plat you show lots as being in C -1 zoning. My records show this property as being zoned A -P. Reviewed by: Spencer Thompson Date: June 18, 2001 ELECTRICAL 1. Developer provides 10' easement from corner of Rock Prairie Road and Edelweiss Ave. to back of lot. (along Edelweiss Ave.). 2. Coordinate with Electric Division for electric needs per lot. Reviewed by: Ronnie Bolin Date:6 -13 -01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 4 JAPZTEXT\SRI.DOC STAFF REVIEW COMMENTS No. 2 Project: EDELWEISS BUSINESS CTR LT 4 -5 -6 B 4 (FP) -FINAL PLAT (1- 500142) ENGINEERING You are only required to construct the water line and not the hydrant. The hydrant can be constructed at the time of development. If you wish you may remove the hydrant from the plans. There may be a conflict between the water line and sewer manhole as shown on the plans. There must be a minimum 9 -ft separation between the two. If you remove the hydrant, please include a 2" blow -off at the end of the water line, as required. You may wish to extend the PUE at this time such that the hydrant will later be able to be installed without conflict. Reviewed by: Spencer Thompson Date: June 27, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 3