HomeMy WebLinkAbout00071336STAFF REVIEW COMMENTS NO. 1
Project: PRIVETT DENTAL-SITE PLAN (1-500144)
PLANNING
✓1.
Please show all easements as existing or proposed.
2.
Please make a note stating whether or not the property is in the 100-year flood plane
referencing FEMA maps.
✓3.
Dumpster pad must be a 12' x 12' pad, with curbing around it.
4.
The fire hydrant, which is to serve this building, must be within the required distance
and on the same side of street. In this case, the hydrant that meets the distance
constraint is across Rio Grande and is therefore not in compliance.
5.
The "Proposed Building" does not require fire lane. However, plan on meeting fire
lane requirements on the "Future" side. At least one lane in the driveway must be a
minimum of 20' wide for fire trucks to enter and exit the site. (If you have any
questions concerning this matter, please contact Jon Mies "Fire Marshall" (979) 764-
6363).
6.
Please make parking lot layout consistent on all sheets. You are depicting handicap-
parking spaces in one location on sheet A1.01, not being the same location on sheet
C-1.
7.
Please edit Landscaping Plan per phone conversation on 06/22/01.
8.
Please provide details for barricades to protect existing trees being utilized for point
calculations.
9.
FYI: for phase two, you may not have more than 1134 square feet of pavement in
the landscape reserve without including an island.
10.
Please show water demands for each individual water meter and sewer connection.
The City will determine tap and meter sizes based on the supplied data.
11.
Please be aware that the official plat for this property contains a note that states the
property must take access from Rio Grand Blvd. In addition, this may also be a
deed restriction per our file documents. You may be required to replat the property to
dismiss the note. Please check with your legal council.
Reviewed by: Jennifer Reeves Date: 06/22/01
ENGINEERING
1. As mentioned above, this site will be need to construct a fire hydrant. The fire line
and hydrant are considered public infrastructure. The line must be in an easement
and a plan and profile of the waterline and hydrant are required on construction
documents. You may wish to relocate the water meter to come off the fire line.
2. The drainage report for the Development Permit is being reviewed at this time. The
engineer will be required to show calculations in order to utilize the storm sewer
Staff Review Comments Page 2 of 3
J:IPZTEXT\SR1.DOC
junction box. If you are not permitted to use the junction box, please plan on re-
grading the site in order to drain runoff in another manner.
3. Concerning the 50'x50" access easement on the west side of the property, please
consider saving as many of the existing oak trees as possible by adjusting the
proposed driveway.
Reviewed by: Spencer Thompson
Date: June 26, 2001
ELECTRICAL
1. Developer installs conduit as per city specs.
2. Developer provides temp blanket easement for construction purposes.
3. Developer pours transformer pad per city specs.
4. Developer provides 30'4" rigid pipe for riser pole if necessary.
5. Developer installs first 10' up the pole, city installs other 20'.
Reviewed by: Ronnie Bolin Date: 6-21-01
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devises must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
3. Dumpster enclosure inside dimensions are 9 X 9 feet. It needs to be 12 by 12 feet.
Reviewed by: Pete Caler
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 3 of 3
J:\PZTEXT\SR1.DOC
STAFF REVIEW COMMENTS NO. 2
Project: PRIVETT DENTAL-SITE PLAN (1-500144)
PLANNING
1. Please note on the site plan whether or not the subject property is within the 100-
year flood plane referencing the appropriate FEMA map.
J2. Please show fire the lane on phase two.
3. Phase one is not meeting the required landscaping points. It appears that you are
counting the landscaping in your required buffer area at the rear of the property
toward your landscaping point calculation. Please be aware that the landscaping in
the required buffer area cannot count toward your landscaping requirements for your
point calculation.
4. Please provide details for barricades to protect the existing trees being utilized for
point calculation.
5. Please be aware that if you want site plan approval for phase two, you will have to
have approved landscaping/streetscaping approval on this site plan as well. We
need you to submit landscaping/streetscaping plans for review.
6. Irrigation plans will have to be approved prior to CO.
-07. To be able to do your parking review on phase two, we will need to know the use. If
it is going to be office professional or a doctors office. Please show parking
requirement table on your site plan.
Reviewed by: Jennifer Reeves Date: 08/30/01
S
ENGINEERING
1. No comments. A `L
Reviewed by: Spencer Thompson
NOTE: Any changes made to the plans, that have not be
must be explained in your next transmittal letter and "bubbl,
these plans that have not been pointed out to the City, will cc
Staff Review Comments Page 2 of 1
J:\PZTEXT\PZ05279. D OC
STAFF REVIEW COMMENTS No. 4
Project: PRIVETT DENTAL - 01-00500144
ENGINEERING
1. Remove the service line from adjacent private lot on Capistrano Court. The long
east-west run of water service should tie directly to public water line without
additional jogs.
2. Water meter location must be shown immediately on east side of common
property line where service crosses.
3. Due to the lack of clearance between the water service and the future buildings,
the actual depth of water service will be required when permitting the buildings to
insure that the service line is not within the bearing zone of the building
foundations. If the service is too close, the line or the building will need to be
shifted to provide the required clearance.
4. Because the easement platted along the north side of the site is private, not
public, a public utility easement will need to be dedicated to cover the existing
sewer and power facilities. As long as the revised water service is no closer than
5 feet to any public facility, the easement may be described to divide the two.
For expediency, a blanket easement may be used to avoid delay in issuance of
the Certificate of Occupancy, with a metes and bounds dedication to follow after
the survey work has been performed.
Reviewed by: Brett McCully, P.E. Date: June 3, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
2 of 2