Loading...
HomeMy WebLinkAbout00071330STAFF REVIEW COMMENTS NO. 1 Project: COOPER'S SUBDIVISION (PP)- PRELIMINARY PLAT (1- 500145) ENGINEERING 1. Please show directions of metes and bounds in clockwise order. 2. Please be aware that this area is an Impact Fee water line area (99 -01). The current established fee is $500 per Living Unit Equivalent and will be assessed at the time of Building Permit. 3. Please be aware that the Final Plat must show a "minimum first floor elevation" for lots 1 and 2. Reviewed by: Spencer Thompson Date: July 2, 2001 ELECTRICAL 1. Developer installs conduit as per city specs. 2. Developer provides temp. Blanket easement for construction purposes. 3. Developer pours transformer pad per city specs. 4. Developer provides 30' of 4" rigid pipe for riser pole. 5. Developer installs first 10' up riser pole. City installs remaining 20'. Reviewed by: Ronnie Bolin Date: 07 -02 -01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 4 J: \PZTEXT\SRI.DOC