HomeMy WebLinkAbout00071306STAFF REVIEW COMMENTS NO. 1 Project: ROCKFISH RESTAURANT-SITE PLAN (1-500149) PLANNING FYI - The following do not require response. 1. A dimension was not provided for the sidewalks adjacent to the building. Please ensure that the 2-foot overhang for the parking spaces will not restrict the ADA required clearance of the sidewalks. 2. Please be aware that it will be the responsibility of the restaurant to open the dumpster gates. 3. Irrigation system will need to be installed prior to C/O. Reviewed by: Jessica Jimmerson Date: 7-18-01 ENGINEERING 1. Show an Erosion Control Plan. 2. When using the Rational Formula it is necessary to use a time of concentration (Tc) of 10 minutes or greater. Reviewed by: Thomas V. Vennochi Jr. Date: 7/23/01 ELECTRICAL 1. Developer install conduit per city specs and design. 2. Developer is responsible for the installation of service from transformer to building. Metering will be on the transformer. The city electric division will make up the service connection in the transformer. 3. Developer pours transformer pad per city spec. 4. Outside disconnect required. Reviewed by: Ronnie Bolin Date:7-24-01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 4 J:\PZTEXT\SRI.DOC Mitchell & Morgan Response to: STAFF REVIEW COMMENTS NO. 1 Project: ROCKFISH RESTAURANT-SITE PLAN (1-500149) PLANNING FYI - The following do not require response. Comment 1: A dimension was not provided for the sidewalks adjacent to the building. Please ensure that the 2-foot overhang for the parking spaces will not restrict the ADA required clearance of the sidewalks. Response: We checked all sidewalks have the required 36-inch minimum ADA clear space. Comment 2: Please be aware that it will be the responsibility of the restaurant to open the dumpster gates. Comment 3: Irrigation system will need to be installed prior to C/O. ENGINEERING Comment 1: Show an Erosion Control Plan. Response: Shown on the revised plan. Comment 2: When using the Rational Formula it is necessary to use a time of concentration (Tc) of 10 minutes or greater. Response: See attached letter. Reviewed by: Thomas V. Vennochi Jr. ELECTRICAL Comment 1: Developer install conduit per city specs and design. Response: Acknowledged. Comment 2: Developer is responsible for the installation of service from transformer to building. Metering will be on the transformer. The city electric division will make up the service connection in the transformer. Response: Acknowledged. Comment 3: Developer pours transformer pad per city spec. Response: Acknowledged. Comment 4: Outside disconnect required. Response: Acknowledged. Reviewed by: Ronnie Bolin MISCELLANEOUS Comment l : Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. Response: Pressure Vacuum Breaker is shown on Sheet LS2. Comment 2: ALL BackHow devises must be installed and tested upon installation as per City Ordinance 2394. Response: Acknowledged. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans, Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. STAFF REVIEW COMMENTS NO. 2 Project: ROCKFISH RESTAURANT (SP)-SITE PLAN (1-500149) PLANNING 1. No comment, stamped approved. Reviewed by: Jennifer Reeves Date: 10/23/01 ENGINEERING 1. Everything looks fine. Reviewed by: Ted Mayo Date: 10/23/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 3 of 3