HomeMy WebLinkAbout00071295STAFF REVIEW COMMENTS NO. 1
Project: EDELWEISS GARTENS, PH 1-FINAL PLAT (1-500152)
PLANNING
1. This submittal for a Final Plat is incomplete. Your construction drawings are not
showing connections to existing infrastructure to provide access and utilities to the
subdivided lots. In order for your plat to proceed, please show these connections.
Or, we will place this plat back on the agenda after the plat application and
construction drawings for Westfield Phase 3 has been received.
Reviewed by: Spencer Thompson Date: July 16, 2001
ENGINEERING
1. I will continue to review the construction drawings. Please be aware that Westfield
Phases 2 and 3 and Edelweiss Gartens are all being reviewed and coordinated
together and it may take a longer time to return comments than normal.
Reviewed by: Spencer Thompson Date: July 16, 2001
ELECTRICAL
1. Developer installs conduit as per city specs.
2. Developer installs street lighting as per city specs.
3. Developer provides temp. blanket easement for construction purposes.
4. Developer provides necessary easements for electric lines as installed.
5. Developer provides street light PUE as per design.
Reviewed by: Ronnie Bolin
MISCELLANEOUS
Date:7-10-01
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City Ordinance
2394.
2. All BackFlow devises must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments
J:\PZTEXT\SRI.DOC
Page 2 of 4
STAFF REVIEW COMMENTS NO. 2
Project: EDELWEISS GARTENS, PH 1-FINAL PLAT (1-500152)
PLANNING
1. Concerning the Plat, please change your boundary line (and acreage, if
needed) to NOT include the proposed Victoria Avenue.
Reviewed by: Spencer Thompson Date: August 2, 2001
ENGINEERING
1. Sheet 1: Please show 1-1/2" water line to lots 26 and 27 as 4" sewer line.
2. Sheet 3: Please show actual Q-10 and Q-100 for designed storm sewer.
Please show calculated velocities for actual Q-10 and Q-100 flows at the
designed slope, not theoretical slope. Use reduced areas where applicable
for velocity calculations. Please plot HGL-10 and HGL-100 on profiles, as
required. The storm drain must carry Q-10, while Q-100 must be maintained
in the ROW.
3. Please include valve box detail showing 24-sq.in. by 4" concrete block at
surface.
4. It appears that several of the storm water lines exceed the flow allowed with
the 25% reduction. Please check and verify.
5. It appears the exit velocity of the RCP below Ardenne Court is very high.
Please include energy dissipation in the outlet.
6. Concerning the Drainage Report, the adjusted design flows should decrease
with the decreased cross-sectional area. Please show actual flows and
allowed flows. Please show velocities based on actual installed slope and
actual or allowed flows.
7. Concerning the Sewer Report, it is obvious from your report that an 8" line is
sufficient for your anticipated service area. What is of concern, is whether the
8" line can efficiently serve as much of your subdivision as you want it to and
Westfield Phases 1,2 and 3. The 12" line along the proposed East-West
collector was designed to service this area. Please show calculations that
demonstrate that the 8" can serve all you are intending it to.
8. Water Report is satisfactory. Please remember as you plan for future phases
of this project, that the 24" water line along the proposed SH-40 ROW should
be included in your design. It may be necessary to include easements for
branches where applicable that were not shown on the preliminary plat. OP
requests should be based on the cost difference between the design shown in
the water report and the design necessary for an efficient system utilizing the
24" water line.
9. Do you have the easements for street lighting as per McCord Engineering
and Public Utilities?
Staff Review Comments Page 2 of 3
Reviewed by: Spencer Thompson Date: August 2, 2001
ELECTRICAL
1. Developer installs conduit as per city specs.
2. Developer installs street lighting as per city specs.
3. Developer provides temp. blanket easement for construction purposes.
4. Developer provides necessary easements for electric lines as installed.
5. Developer provides street light PUE as per design.
Reviewed by: Ronnie Bolin
Date:7-10-01
NOTE: Any changes made to the plans, that have not been requested by the City of College
Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any
additional changes on these plans that have not been pointed out to the City, will constitute a
completely new review.
Staff Review Comments Page 3 of 3
STAFF REVIEW COMMENTS NO. 3
Project: EDELWEISS GARTENS, PH 1 (FP)-FINAL PLAT (1-500152)
ENGINEERING
1. No comment.
Reviewed by: SPENCER THOMPSON Date: November 2, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional
changes on these plans that have not been pointed out to the City, will constitute a completely
new review.