Loading...
HomeMy WebLinkAbout00071286STAFF REVIEW COMMENTS NO. 1 Project: CASTLEGATE SUB SEC 2 PH 2 (FP)-FINAL PLAT (1-500154) PLANNING 1. Final Plat as submitted is acceptable. We need to insure that the City's Impact Fee Sanitary Sewer Line is accurately located (on-the-ground) for accurate easement definition. Reviewed by: TED MAYO Date: 7/12/01 ENGINEERING 1. Construction document review is ongoing-project completion by 7/18/01. Reviewed by: TED MAYO Date: 7/12/01 ELECTRICAL 1. Developer installs conduit as per city spec. 2. Developer installs street lighting as per city specs. 3. Developer provides temp. Blanket easement for construction purposes. 4. Developer provides necessary easements for electric lines as installed. 5. Developer provides street light PUE as per design. Reviewed by: Ronnie Bolin Date:7-10-01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley Staff Review Comments Page 3 of 4 J:\PZTEXT\SRI.DOC NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 4 of 4 J:\PZTEXT\SRI.DOC STAFF REVIEW COMMENTS NO. 1 Project: CASTLEGATE SUB SEC 2 PH 2 (FP)-FINAL PLAT,(1-500154) PLANNING 1. Final Plat as submitted is acceptable. We need to insure that the City's Impact Fee Sanitary Sewer Line is accurately located (on-the-ground) for accurate easement definition. Reviewed by: TED MAYO Date:.7/12/01 ENGINEERING Construction Documents 1. Sheet 4: ROW widtha0' not 60'. 2. Sheet 5: ROWwidth is 50' not 60'; Tarset Co,,eed 48' pavement radius at end to accommodate ladder truck turnaround; each paved roadway should be 24' BC-BC. 3. Sheet 6: Pipes 212 & 213 slopes a shown in drainage report as 1.93% vs.1.88e/o, shown on profile;Title Block-SWF? 4. Sheet 7: Title BIoc,JrePipe 210A not 2~ 5. Sheet 12: Profle STA)7+31.50- 8" ? MJ Bens, 6. Sheet 13: STA 4+06£ 6"X6" MJ Tee not 8"X6,"(Plan & Profile). 7. Sheet 14: STA 3+80- 6"X6" MJ Tee not 8"X6" (Plan & Profile). Drainage Report: ok Other 1. Need to submit Engineer's Cost Estirnat'e 2. Impact fees will be due for this development at $349.55 per living unit. Reviewed by: TED MAYO ELECTRICAL 1. Developer installs conduit as per city spec. 2. Developer installs street lighting as per city specs. Staff Review Comments J:WZTEXTtSRI.DOC Date: 7/19/01 Page 3 of 4 3. Developer provides temp. Blanket easement for construction purposes. 4. Developer provides necessary easements for electric lines as installed. 5. Developer provides street light PUE as per design. Reviewed by: Ronnie Bolin Date:7-10-01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J:IPZTEXTSRI.DOC Page 4 of 4