Loading...
HomeMy WebLinkAbout00071271STAFF REVIEW COMMENTS NO. 1 Project: ALAM ADDITION (FP)-FINAL PLAT (1-500155) PLANNING 1. Add at top of title block above ALAM ADDITION--- FINAL PLAT of 2. Remove signature block for Mayor Reviewed by: TED MAYO Date: 7/12/01 ENGINEERING 1. Reviewed by: Date: ELECTRICAL 1. Developer installs conduit per city specs and design. 2- 4" gray schedule 40 pvc install 48" below finished grade form power pole to transformer location and from transformer to property line for future loop feed. 2. Developer installs service conduit from transformer to building per city spec and design. (4" gray schedule 40 pvc, number of conduit will be determined when we receive load information. 3. Developer pours transformer pad as per city specs. 4. Easement will be required for all electric infrastructure as installed. Provide a temporary blanket easement for construction purposes and upon completion of project provide meet and bound descriptive easement to release temporary easement. City of College Station legal dept will prepare all legal documents for easement once necessary paper work is provided by developer. Signed temporary easement must be on file before electric service can be turned on. Reviewed by: Ronnie Bolin Date:7-10-01 Staff Review Comments Page 3 of 4 J:\PZTEXl1SR1.DOC MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 4 of 4 J:\PZTEXT\SRI.DOC STAFF REVIEW COMMENTS NO. 1 Project: ALAM ADDITION (FP)-FINAL PLAT (1-500155) PLANNING 1. Add at top of title block above ALAM ADDITION--- FINAL PLAT of 2. Remove signature block for Mayor Reviewed by: TED MAYO Date: 7/12/01 ELECTRICAL 1. Developer installs conduit per city specs and design. 2- 4" gray schedule 40 pvc install 48" below finished grade form power pole to transformer location and from transformer to property line for future loop feed. 2. Developer installs service conduit from transformer to building per city spec and design. (4" gray schedule 40 pvc, number of conduit will be determined when we receive load information. 3. Developer pours transformer pad as per city specs. 4. Easement will be required for all electric infrastructure as installed. Provide a temporary blanket easement for construction purposes and upon completion of project provide meet and bound descriptive easement to release temporary easement. City of College Station legal dept will prepare all legal documents for easement once necessary paper work is provided by developer. Signed temporary easement must be on file before electric service can be turned on. Reviewed by: Ronnie Bolin Date:7-10-01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J:\PZTEXT\SRI.DOC Page 2 of 4