Loading...
HomeMy WebLinkAbout0007122491/31/01 15:42 From: Bridgatte George 979-764-3655 Page 2 of 2 0 STAFF REVIEW COMMENTS NO. 1 Project: WESTFIELD ADDITION PH 3-FINAL PLAT (1-500167) PLANNING 1. Please locate calculated 100-year floodplain on plat. You may wish to add note that this is not a FEMA established floodplain. ~2. Please provide a detailed cost estimate for all public infrastructure. 3. Please Include easement for sewer access to Westfield Phase II on plat. Phase li Is delayed. ,0114 4. Please add easements for street lighting if required. Please check with Public Utilities. "-,M~5. On the OP request, please show the full cost of all required infrastructure and the full cost of the requested Infrastructure. Then show the difference. A 10% contingency fee is allowed to be included in each estimate Reviewed by: Spencer Thompson Date: July 30, 2001 ENGINEERING 1. Construction comments not included at this time. Reviewed by: Spencer Thompson Date: July 30, 2001 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer Installs street lighting as per city spec. 3. Developer provides temp blanket easement for construction purposes. 4. Developer provides necessary easements for electric lines as installed. 5. Developer provides street lighting easements as per city specs and design. Reviewed by: Tony Michalsky Date: NOTE: Any changes mace to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Ststf Renew Cammemr Cage i of a iFZTEXTSP1 DOC a•nA #A%07U 764 3446 D VhLVrmnn1 ov%-10 18:05 $979 764 3496 DEVELOPMENT SVCS STAFF REVIEW COMMENTS No.1 Project: WESTFIELD ADDITION PHASE 3 (PP)-PRELIMINARY PLAT (0-236) PLANNING 0002 1. Seeing that there is the distinct possibility that Victoria may not be constructed for some time, it is in the best interest of the City for the developer to provide an access easement such that Commercial Lot 1-A can get access through Commercial Lot 1- B. Lot 1-B will be allowed an access according to the Driveway ordinance. Lot 1 A will not be allowed a separate driveway off of Graham Road. Please design the dimensions of the_easement to accommodate. any_,sit jm tovem pts..and. turning. radii requirements This easement can be removed at a later date in the event it is not needed. 2. According to previous discussions, the detention area is to be dedicated as "Greenways". The detention area has not been determined to be "park", as noted on the plat. Approximate 4.3 acres of land have already been credited to this development for the parklaind d ii*&n' *u rement. Preliminary, calculations show only 1.7 acres necessary for this development through Phase 3. There is still a development fee to be paid by the developer for Phase 3. All parkland dedication requires the approval of the City Parks Department. 3. The Westfield Phase 2 Preplat was approved 1/4/01. Please make change. Reviewed by: Spencer Thompson Date: January 5, 2001 ENGINEERING 1. According to my resources, the 70' ROW minor collector with bike lanes has a 48' pavement. Please make correction on plat. 2. It appears that the floodplain has been placed on the plat according to the existing topography of the land. It is my concern how the floodplain will change when the streets and lots have been brought to final grade and if the property line will include all the floodplain. Can you adjust this line accordingly to reflect this change? 3. Reviewed by: Spencer Thompson Date: January 5, 2001 Staff Review Comments Page 1 of 2 J:TZTEXT1PZ04120.DOC