HomeMy WebLinkAbout00071218STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SUB SEC 3 PH 2 (FP)-FINAL PLAT (1-500168)
PLANNING
1. Final Plat: Everything is ok.
Reviewed by: TED MAYO Date: 7/30/01
ENGINEERING
1. Construction Documents:
• Sheet 2: Add top of curb grade at STA 11+50
• Sheet 3: Ditto
• Sheet 4: Title Block- Add pipe 309
• Sheet 5: Plan- Pipe 319 is 27" not 24".
• Sheet 6: Profile-Pipes 315 & 316- Inlet 312 is 10' not 15'.
• Sheet 7: Plan- Add STA 9+40.76- 8" 11.25* MJ Bend.
2. Drainage Report: ok
Reviewed by: TED MAYO Date: 7/30/01
ELECTRICAL
1. Developer is responsible for the installation of all conduit per city design and
requirements.
2. Developer is responsible for the installation of street lighting per city design and
requirements.
3. Developer provides temp blanket easement for construction purposes.
4. Developer provides necessary easements for electric lines as installed.
5. Developer provides street lighting easements as per design.
Reviewed by: Tony Michalsky Date:
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have
not been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 4
J:\PZTEXT\SRI.DOC