Loading...
HomeMy WebLinkAbout00071210Craig Kankel, P.E. O C O'Malley Engineers, ineers, LIT . Robert C. Schmidt, P.E. 7 Ed Addicks, P.E. August 27, 2001 Ms. Natalie Ruiz Development Manager Development Services City of College Station 1101 Texas Avenue South P.O. Box 9960 College Station, Texas 77840 Re: City of College Station Veterans Park and Athletic Facilities, Phase I OE Job No. 675.01-RB Dear Ms. Ruiz: We have prepared responses to the plan review comments from the Planning and Engineering groups (copy attached) to assist in review of the changes and corrections we have made to the plans. Our responses are offered in order of the comments as follows: Planning 1. Site address and legal description have been added to Sheet C-2. 2. Zoning of land to south has been added to Sheet C-2. 3. Highway 30 right-of-way widths have been added to Sheet C-2. 4. Distances to opposite and adjacent driveways have been added to C-2. 5. We have verified that all parking spaces meet or exceed the 9' minimum width. Standard dimensions of spaces in lots A and C have been added to Sheets C-8 and C-10. A sketch of Parking Lot B is attached to show that these variable angle spaces exceed the minimum requirements and the minimum width has been added to Sheet C-9. 6. These revisions have been made on Sheets C-8 and C-10. 7. See "Y above. 8. The one way drive for Parking Lot B has been revised to be 20' wide. 9. A 6" doweled on curb is proposed along all edges of parking lots that are proposed to be extended in the future. A preliminary detail was previously approved by you. 10. This item has been addressed by the Parks and Recreation Department on their plans. 11. Fire Lanes have been designated and are to have painted curbs with signs designating the entrances to fire lanes. KA675-01 RMIetter\ruizplans.doc 203 S. Jackson P. O. Box 1976 Brenham, Texas 77834-1976 (979) 836-7937 FAX (979) 836-7936 12. Additional trees have been added to the Landscape plans by Parks and Recreation. IV Engineering 1. The red line comments have been addressed and the red line plans are attached. 2. Sheet 16 of the plans is a Sediment and Erosion Control plan. It is our understanding that the Development Permit will be requested at such time as a Contractor has been selected to perform the work. 3. A tree protection detail has been added to the Landscape drawings. 4. Although this 6" sewer line can be considered a service, we believe it is in the Parks and Recreation Department's best interest to have manholes rather than frequent cleanouts to aid in future maintenance. 5. The City's design standards require the trench backfill over water and sewer lines to be compacted to 95% Modified Proctor and over storm sewers to be 95% Standard Proctor. We have added a Civil General Note on Sheet C-1 requiring 95% Modified Proctor backfill compaction for all utility trenches under pavement. 6. Valves have been added to the long run of water line and at both tee branches. 7. Construction details for the water and sewer appurtenances will be in accordance with the City of College Station Water and Sewer Specifications which include all of the required details. This entire document is referenced by general note in the Civil Drawings. 8. Slopes of water lines have been added and where significant vertical deflection is required, vertical curve data is shown. 9. The handicapped ramp at Parking Lot B has been revised to reflect the recommended ramp type. Due to the fact that all other locations will be subject to rainfall run-off flow that must be contained within the gutter, ramps perpendicular to the curb are proposed. Since these sidewalks will be 10' wide, there will be approximately four (4) feet of level sidewalk beyond each ramp. Transmitted herewith are two sets of the site, landscape and civil plans for your review. Also attached are the "red line" plans showing additional review comments. KA675-01 RB\letter\ruizplans.doc If you have any questions regarding this information, please call. Sincerely, Robert C. Schmidt, P.E. Vice President RCS:kl Enclosures cc + two sets of plans: Mr. Eric Ploeger KA675-01 RB\letter\ruizplans.doc fz B CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 RECEIVES ALG 15 M MEMORANDUM August 13, 2001 TO: Eric Ploeger, Assistant Director o arks & Recreation FROM: Natalie Ruiz, Developmen ' g SUBJECT: Veterans Park 8s Athletic Facilities, Phase I Staff reviewed the above-mentioned site plan as requested. The following page contains staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for additional staff review: Two (2) copies of the revised site, landscape and civil plans. Additional sets of plans will be needed once approved by staff. The drainage study submitted on July 26th has been approved and I am forwarding a copy to O'Malley Engineers. Please call Spencer Thompson or Molly Hitchcock at 764-3570 if you have any questions regarding staff review comments. CC: Robert C. Schmidt, P.E., O'Malley Engineers, Via fax (979) 836-7936 Case file no. 01-169 1~ I CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM August 13, 2001 TO: Eric Ploeger, Assistant Director o arkg & Recreation FROM: Natalie Ruiz, Development g 46 SUBJECT: Veterans Park 8s Athletic Facilities, Phase I Staff reviewed the above-mentioned site plan as requested. The following page contains staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by any Monday at 10:00 a.m. for additional staff review: Two (2) copies of the revised site, landscape and civil plans. Additional sets of plans will be needed once approved by staff. The drainage study submitted on July 26th has been approved and I am forwarding a copy to O'Malley Engineers. Please call Spencer Thompson or Molly Hitchcock at 764-3570 if you have any questions regarding staff review comments. CC: Robert C. Schmidt, P.E., O'Malley Engineers, Via fax (979) 836-7936 Case file no. 01-169 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 n p` MEMORANDUM 'i September 4, 2001 TO: Robert C. Schmidt, P.E., O'Malley Engineers, Via fax (979) 836-7936 FROM: Bridgette George, Assistant Development Manager SUBJECT: COCS VETERANS PARK (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for the plans to be stamped approved: Three (3) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; and, Six (6) copies of the revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Eric Ploeger, Assistant Director, Parks & Recreation Department, Via fax 764-3737 Case file #1-500194 Home of Texas A&M University AUG-21-2001 16:53 T MALLEY ENGINEERS y Engineers, L.L.P. i O'Malley b FAX TRANSMITTAL TO: /VaTo e ve Z l~ DATE:- ;VZ /Zo l RE: Lle'e"a' /"arlc j ~ lQ.~,t OE JOB NO, 17S of--,e~j FAX 7 7 26 q(- 3 ¢l~ FROM: ed or~ `n: d/ FAX 979/836-7936 NO. OF PAGES Z- (INCLUDING COVER) VIA MAIL - YES NO REMARKS: /y a la/: e ,e.~ a f~ae ~c,,Je / _ der e~►- ~e ~a: f, Would &,,1",,,4 Se.r s ap~~~ C4 c:,~r-b p1l~.~•e ~ ~jzr~ ~~i ~ 6 y ~S dre T7~ h~ X ~er+.de.~ jrl ~v Nom- c7S a Cas ¢ SAY% 5 /nea3=-rte IF YOU DO NOT RECEIVE ALL THE PAGES, PLEASE CALL: 9791836-7937. 979 836 7936 P.01i02 Craig Kankel, P.E. Robert C. Schmidt, P.E. Ed Addicks, P.E. , 1 n w 1- n 1 T -1. 1n11 1-11 - i c•v 1A9M 0.1,0 -M.3 AUG-21-2001 16:53 O'MALLEY ENGINEERS 979 836 7936 P.02i02 6" 1/2" RADIUS ON CORNERS #4 REBAR CONTINUOUS EXCEPT AT EXPANSION JOINTS. PROVIDE 6„ EXPANSION JOINTS IN I . f . ACCORDANCE WITH TYPICAL CURB ASPHALT SURFACE AND GUTTER. BASE MATERIAL U Q E a~ O r D 3 v / 0 Lo r` 0 0 #5 REBAR x 2'-6" LONG 3'-0" O.C. TEMPORARY CONCRETE _CU_RB DOWELED ON ASPHALT PAVEMENT SECTION NTS CITY OF COLLEGE STATION VETERANS PARK & ATHLETIC FACILITY 074mim FNaINffiLS 10M P oot mumber. 675.01 R8 /RC ® CE= Drawn : CDS o,%- 8_21-01 Aavtmw. Sh*O dumber. 1 ,,.Q}.... 1