Loading...
HomeMy WebLinkAbout00071208❑ ' 11. Show curb and pavement detail. A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include island, planting areas, access ways, dumpster locations, utility pads, etc.) Curb details may be found in the Zoning Ordinance Section 9 and alternatives to those standards must be approved by the City Engineer. No exception will be made for areas designated as "reserved for future parking". NOTE: One edge of Parking Lot A and if Alternate Bid C is not awarded, one edge of Parking Lot -C are proposed without a curb. 0 12. Landscape plans as required in Section 11 of the Zoning Ordinance (See Ordinance # 1638.) The landscaping plan can be shown on a separate sheet if too much information is on the original site plan. If requesting protected tree points, then those trees need to be shown appropriately barricaded on the landscape plan. Attempt to reduce or eliminate plantings in easements. Include information on the plans such as: A required point calculations ® additional sreetscape points required. Streetscape compliance is required on all streets larger than a residential street. f calculations for # of street trees required and proposed (proposed street tree points will accrue toward total landscaping points.) 15 proposed new plantings with points earned proposed locations of new plantings f screening of parking lots L screening of dumpsters, detention ponds, transformers, A/C units, loading docks, propane tanks, utility demarcation point on buildings, or other areas potentially visually offensive. C existing landscaping to remain show existing trees to be barricaded and barricade plan. Protected points will only be awarded if barricades are up before the first development permit is issued. ® 13. Show irrigation system plan. (or provide note on how irrigation system requirement will be met prior to issuance of C.O.) All plans must include irrigation systems for landscaping. Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation deman submitted by applicant and must include backflow prevention protection. 14. Is there any landscaping in TxDOT R.O.W. ? Yes ❑ No U If yes, then TxDOT permit must be submitted. IN 15. Will there be any utilities in TxDOT R.O.W. ? Yes No ❑ If yes, then TxDOT permit must be submitted. ❑ 16. Will there be access from a TxDOT R.O.W. ? Yes M No ❑ If yes, then TxDOT permit must be submitted. ❑ N/A 17. The total number of multi-family buildings and units to be constructed on the proposed project site. ❑ N/A 18. The density of dwelling units per acre of the proposed project. C5 19. Provide a water and sanitary sewer legend to include water demands (minimum, maximum and average demands in gallons per minute) and sewer loadings (maximum demands in gallons per day). 1SI 20. Are there impact fees associated with this development? Yes ❑ No X] NOTE: Signs are to be permitted separately. SITE PLAN CHECKLIST 3 of 3 SITECK.DOC 04/06/01