The Development Permit has been sent to Mr. Buckner for his signature and I told him to return
it to you. At your earliest convenience please review this information and call with questions.
Thanky.@ r �pr your help with this project.
Hester, P.E.
Revised Plans
Graphic
Xc: Charles Buckner
Hester Engineering Company
Civil Engineering Services
7607 Eastmark Drive, Suite 253 -B
College Station TX 77840
979.693.1100
June 11, 2001
Bridgette George, Asst. Development Review Manager
College Station Development Services Department
1101 Texas Avenue South
College Station, TX 77842
Re: CD Exchange (SP) — Site Plan (01 -133)
1503 Earl Rudder Freeway
College Station, Brazos County, Texas
Dear Mrs. George,
Below please find your review comments addressed:
PLANNING
2 Pn�
1. See Sheet C 1
2. See Sheet C 1
3. No, Kerr Surveying Company 268.3195 has it and they are waiting for Mr. Springers signature.
4. See Sheet C 1 and the attached graphic.
5. See attached graphic.
6. See attached graphic. Mr. Buckner is discussing with Mr. Springer a joint use agreement.
7. See Sheet C3.
8. See Sheet C3.
ENGINEERING
_ 1. Carter's Grove Drainage Basin 6B does not require detention.
2. See Sheet C 1.
3. A separate plan provided by an irrigation contractor will provide this information. See note
Sheet C3.
4. No work is planned in the TXDOT right -of -way.
5. See attached.
ELECTRICAL
1. See note Sheet C2
2. See note Sheet C2
3. Load information will be provided by the Owner, Mr. Buckner
4. Items 4 -8, See Sheet C2
Hester Engineering Company
Civil Engineering Services
7607 Eastmark Drive, Suite 253 -B
College Station, TX 77840
Ph: 979.693.1100 Fx: 979.693.1075
Email: hec @gkg.net
May 30, 2001
Ted May, P.E.
City of College Station Development Services Department
P.O. Box 9960
College Station, TX 77840
979.764.3570
Re: CD Exchange Drainage Report
1503 Earl Rudder Freeway
College Station, Brazos County, Texas
Drainage Report
Dcar Ted, below find my Engineers Drainage Check list for this site:
Lo cation
i Primary drainage system identified
Carter's Creek, Carter's Grove Tributary
Surrounding developments shown
See Key Map
Local streets, drainage systems shown
See Key Map
Des cription
❑ Acreage of project
0.4735 Acres
Land cover described
Open, grass
❑ Primary /secondary systems within property shown
See Sheet C1
❑ General description
Vacant
CD Exchange — 1 503 Earl Rudder Freeway Drainage Report -- Page 1 of 4 Pages
Drainage Basins
❑ References to FIRMS if applicable
FIRM No. 142C
❑ Secondary system flow patterns and impact of development on existing system
See Grading Plan, Sheet C2
❑ Proposed pathways to Primary system shown or described
See Key Map
Design Criteria
❑ Any deviation from standards being requested?
No
C Discussion of site constraints and capacities (streets, existing structures, etc.)
Runoff will discharge into an existing triple 8x4 concrete box culvert which is
designed for ultimate flow.
E; Discussion of any applicable previous drainage studies and how this plan will affect it
When the adjacent Mobile Gasoline Station was constructed a triple 8x4 concrete
box culvert was built which allowed the owners of the property to build on the
entire tract of land. A report was prepared by Civil Design Services, Inc., Kenneth
R, Rothe, P.E. 210.736.3188, titled " 1.546 ACRES NE CORNER OF HWY 6
(BYPASS) AND HYW 30 (HARVEY ROAD) K.D. TIMMONS PROPERTY
COLLEGE STATION, TEXAS ", and a LOMA submitted to FEMA.
Hydrologic Criteria
Rainfall /runoff calculation method described and calculations provided
Rational Method Q =CIA,
QI00 =0.9x1 1.64x0.473= 4.96cfs Post Development
Q100 =0.3xl 1.64x0.473 =1.65 cfs Pre Development
Increase = 3.31 cfs
Detention discharge / storage calculation method / calculations
The box culvert was designed for ultimate development of this drainage basin and
with the site on a Primary Channel (Carter's Creek, Carters Grove Trib.) no
detention is required nor planned for this site.
Storm recurrence intervals used
The majority of the site will drain to a sump inlet that will discharge directly into
the triple 8x4 concrete box culvert. The inlet is designed to accept Q100.
❑ DISCUSSIOn of other drainage facility design criteria used if not referenced in Standards
NA
Hydraulic Criteria
i, Identify capacity of systems used
CDS Report Section 8 Concrete Box Culvert Q100 =1022 cfs Ultimate
❑ Specify velocities at critical points in system
NA
Identify detention / retention outlet and routing
No detention is planned for the site.
❑ Discussion of other drainage facility design criteria used not referenced in Standards
NA
❑ DPDS Special Drainage Basin and Channel Reach Design Standards, page 10 & 11:
CD Exchange — 1 503 Earl Rudder Freeway -- Drainage Report — Page 2 of 4 Pages
• No mandatory detention for Carters Grove Basin Reference No. 6
• No mandatory Minimum Floor Elevation
Drainage Facility Design
❑ Discuss drainage patterns / flows (pre vs. post)
Rational Method Q =CIA,
Q100= 0.9xI1.64x0.473= 4.96cfs Post Development
Q100= 0.3x11.64x0.473 =1.65 cfs Pre Development
Increase = 3.31 cfs
Section 8 Q100 ultimate = 1022 cfs from the CDS report.
❑ Are they draining water onto another property owner? - if so, is it where the water flowed
before? and is it not more than what flowed there before? and no faster than it flowed before?
No, the runoff generated will flow through the driveways, into a sump inlet and
discharge into the box culvert within the owners tract.
❑ Discuss erosion control measures employed
During construction erosion control will be obtained using silt fencing and hay bales
around the sump inlet and after construction solid sod will placed on the site.
❑ Discuss detention pond design (sideslope, low flow channels, outlet works, freeboard,
emergency spillway)
No detention is planned for this site.
i ; Discuss maintenance access and responsibilities
The drainage system installed by the owner will be maintained by the owner.
Conclusions
Veriti' compliance with DPDS (signed and sealed certification)
1 hereby certify that this report and accompanying drainage plan for the drainage
design was prepared by me in accordance with the provisions of the Cities Drainage
Policy and Design Standards for the owners thereof.
I "xplain effectiveness of improvements with regard to controlling discharges of 5 - 100 year
storm by a) Detaining
No detention is planned.
h) Accommodating runoff in existing / proposed easements or ROW discharging
into primary system
The runoff will discharge into an existing drainage easement / culvert
which is a primary system.
c) Combination of a K b
NA
Appendices
❑ References (all criteria and technical information used)
A copy of the CDS report is available upon request, but must be returned.
❑ Hydrologic computations
Land use assumptions for adjacent property
This area is zoned commercial.
Minor /major storm runoff at specific points
The discharge for the site is designed for the Q100, as is the box culvert it will
discharge into.
CD Exchange -- 1 503 Earl Rudder Freeway — Drainage Report — Page 3 of 4 Pages
❑ Historic /fully developed runoff specific points
NA
❑ Hydrographs at critical points
NA
❑ Hydraulic computations
❑ Culvert capacities (headwater and tailwater assumptions)
Tailwater from Carter's Creek was used for the concrete box culvert, CDS
report.
❑ Storm sewer capacities
HEC 2 was used by CDS to build a model of the drainage area and culvert
size.
❑ Street capacities
NA
❑ Storm inlet capacities (inlet control rating)
Q100 was used to determine the design.
Q= 3.OLy = 4.96efs /3x1.0 312 = 1.65 foot wide inlet will be required.
DPDS, page 38, D. Inlet sizing.
Open channel design
HEC 2 was used by CDS to build a model of the drainage area and culvert
size.
Detention area / volume capacity / outlet capacity
NA
Attached Drawing
Location map with drainage patterns
See Site Plan, Sheet C1
l:loodplain map if any
See Attachment, FEMA FIRM Map No. 142C
Drainage plan with topo (existing and proposed with arrows if needed)
See Drainage Plan, Sheet C2
Details ofoutlet structures
See Drainage Plan, Sheet C2
If you hav any questions please contact me.
OF TF,1y1
•NNMM�M�N�NNIHM�NN
MICHAEL G. HESTER
o- ,oA
[1
CD Exchange — 1503 Earl Rudder Freeway — Drainage Report -- Page 4 of 4 Pages
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
June 19, 2001
TO: Charles Buckner, Via fax 936- 582 -1486
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: C D EXCHANGE (SP) - SITE PLAN
Staff reviewed the above - mentioned site plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. The next submittal
will be the third and final review by staff for this round of reviews. If all items have not
been addressed on the next submittal, another $100 processing fee will need to be
submitted for the subsequent set of three (3) reviews. Please address the comments and
submit the following information for further staff review and approval of the site plan:
Six (6) sets of construction documents with the revised site and
landscaping plans attached;
Two (2) copies of the revised site plan; and
One (1) copy of the landscape plan.
If there are comments that you are not addressing with the revised site plan, please
attach a letter explaining the details. If you have any questions or need additional
information, please call me at 764 -3570.
Attachments: Staff review comments
cc: Michael G. Hester, Via fax 693 -1075
Case file #1 -- 500133
Staff Review Comments Page 1 of 3
Transmit Log Record BitWare Client Page 1
Status Log Date Time To
Company
Application
OK 600 6/19/01 14:09:38 Charles Buckner Microsoft Word - PZ04988.DOC
OK 601 6/19/01 14:09:54 Michael McClure McClure Engineering, Microsoft Word - PZ04988.DOC
Transmit Log Record
Status Log Date
BitWare Client
Time To
Company
Application
Page 1
OK 583 6/8/01 9:14:52 Charles Buckner Microsoft Word - PZ04938.DOC
OK 584.3 6/8/01 9:37:44 Michael G. Hester Hester Engineering Microsoft Word - PZ04938.DOC
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
TO: Charles Buckner, Via fax 936 -582 -1486
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: C D EXCHANGE (SP) - SITE PLAN
Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Two (2) revised site and landscaping plans.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764 -3570.
Attachments: Staff review comments
cc: Michael G. Hester, Via fax 693 -1075
Case file #01 -33
Staff Review Comments Page 1 of 3