Loading...
HomeMy WebLinkAbout00071181Status: OK To: Grover Watkins 1-281-931-9011„152 PROJECT REVIEW COMMITTEE (PRC) MEETING June 21, 2001 6/21/01 10:26:28 Page 2 of 2 TO: Grover Watkins, Scott Gabrish, & Barron Hobbs, Hilton Hotel, via fax (281) 931-9011 FROM: PRC Review Subcommittee: Ray Harris, P&Z Commissioner Judy Warren, P&Z Commissioner Carolyn Williams, P&Z Commissioner Staff Attending: Bridgette George, Asst. Development Review Manager Molly Hitchcock, Staff Planner Jennifer Reeves, Staff Planner Tammy Macik, Secretary SUBJECT: Hilton Hotel - The pnopo&d oi'.neplacing the existing attached sign on the bi ildirg and the existing pylon sign with the new corpot ate logo (OI -130) The PRC held a meeting on Wednesday, June 6, 2001 to review the above-mentioned project. Staff Planner Reeves opened the discussion by stating the applicant is planning on replacing their old corporate logo with the new corporate logo. Also, they are planning on replacing the freestanding sign as well. Mr. Grover Watkins stated that they are proposing along with other Hilton Hotels worldwide is to do a logo change. The sign will be the same height of the existing sign and about the 1/3 of the total square footage. They are also replacing two logos on building. Commissioner Warren asked about the colors of gray and blue. Mr. Watkins stated the colors are blue and silver. Commissioner Warren pointed out that the removal of the existing freestanding sign would be replaced with the another sign with the new logo and without the additional sign below the logo. Commissioner Harris motioned to approve the sign. Commissioner Williams seconded it and it passed 3-0. PROJECT REVIEW COMMITTEE STAFF REPORT Prepared by: Jennifer Reeves Date: May 29, 2001 HILTON (FACADE SIGNAGE) (01-0130) All proposals involving site development or redevelopment in the Overlay Corridor District shall require building color approval from the Project Review Committee (PRC). Zoning District: C-B Business Commercial and OV Overlay Corridor District Location: 801 University Drive East Applicant: Chandler Sign Company Item Summary: The Hilton Hotel & Conference Center at University Drive and Tarrow St. is proposing to replace the existing attached signage on the building and the existing pylon sign with the new corporate logo. Issues/Items for Review: 1. Attached signage Supporting Materials: 1. Application 2. Copy of signage proposals 0.*oupWeve sa\aMt\u►gstfipt%ondadoc