Loading...
HomeMy WebLinkAbout00071177STAFF REVIEW COMMENTS NO. 1 PLANNING Project: Windwood Subdivision Entry (PIPP) 1. Nandinas will need to be a minimum of 5 gallons. Reviewed by: Molly Hitchcock Date: May 15, 2002 UTILITIES 1. Notify College Station Utilities during construction so valve cover can be raised. Reviewed by: Frank Simoneaux Date: May 17, 2002 PUBLIC WORKS 1. If any landscape materials within or near the city easements or right of way are not properly maintained by the applicant, the City of College Station reserves the right to remove these materials that constitute a sight distance hazard for vehicles and pedestrians, as well as a sight distance obstruction to any official traffic control device. Furthermore, the City of College Station is not responsible for the costs associated with replacing these materials. 2. The applicant is responsible for the costs (materials and labor) associated with re- locating any official traffic control device. Any device to be relocated, as well as the proposed new location, must be approved by the City Traffic Engineer. 3. The applicant is responsible for the costs (materials and labor) associated with the relocation and/or repair of any electrical conduit or other public utilities that becomes damaged during the construction and maintenance of any landscape materials within the city easements or right of way. 4. The applicant (and any of its maintenance staff and contractors) shall hold harmless the City of College Station for any injuries incurred while constructing and maintaining any landscape materials within city easements or right of way. Reviewed by: Dale Picha Date: May 16, 2002