Loading...
HomeMy WebLinkAbout00071163STAFF REVIEW COMMENTS NO. 1 Project: EMERALD FOREST PH 11-A (FP)-FINAL PLAT (1-500114) PLANNING FINAL PLAT 1. Certificate of Ownership and Dedication: Change reference from University Park to Emerald Forest Phase 11A. 2. North lot line- Lot 7, Blk. 20 : Line L 35 should be 76.41' instead of 88.40'. 3. Need to show off-site easement for drainage at southeast corner east of Lots 9 & 10 of Blk. 19. Reference volume and page number etc. 4. Dimensions on east line LOT 12( Phase B 95'&75' should be 85'&65. Reviewed by: TED MAYO Date: 5/27/01 ENGINEERING CONSTRUCTION PLANS 1. Cover: Construction Note 2- add "and drainage"; 2. Final Plat: Change per planning comments above. 3. Sheet C-2: Show size of existing utilities; show proposed new storm sewers with inlets; show existing storm sewers etc.; add erosion control features to plan, ie, location of silt fences etc. 4. Sheet C-3: Label sidewalks (new and existing), show width and clearly show all ramps; add horizontal curve data for street intersection. 5. Sheet C-4: ditto sheet C-3; downstream flowline of 18" RCP should be 238.50; profile-add vertical curve data-sta. 7+47 to sta. 8+18.58; end of street sta. Is 8+62.09 not 6+62.09; end of storm sewer sta. Is 8+80.21 not 6+80.21. 6. Sheet C-5: City of College Station requires a 1.5" line for double taps and a 1" line for single taps; plan- sta. 1+28.70- 6" gate valve not 8; pipe deflection-note- no deflection at joints, 150' min. radius for 6" dia. -add note to plans. 7. Sheet C-6: Ditto sheet 5. End of line-- install 2" blowoff assembly instead of 6" plug. 8. Sheet C-7: add tap locations/details or refer to and include City detail sheet. 9. Sheet C-8: ditto sheet 7; add requirement for structural fill for line under street. 10. Sheet C-9 add taps for section 11-A, refer to and attach City detail sheet. Staff Review Comments Page 2 of 1 STAFF REVIEW COMMENTS No. 2 Project: EMERALD FOREST PH 11-A (FP)-FINAL PLAT (1-500114) PLANNING FINAL PLAT 1. Certificate of Ownership and Dedication: Change reference from University Park to Emerald Forest Phase 11 A. 2. North lot line- Lot 7, Blk. 20 : Line L 35 should be 76.41' instead of 88.40'. 3. Need to show off-site easement for drainage at southeast corner east of Lots 9 & 10 of Blk. 19. Reference volume and page number etc. 4. Dimensions on east line LOT 12( Phase B 95'&75' should be 85'&65'. No plats have been submitted. Reviewed by: Thomas V. Vennochi Jr. Date: 7/13/01 ENGINEERING CONSTRUCTION PLANS 1. Cover: OK 2. Final Plat: Change per planning comments above. No plats have been submitted. 3. An Erosion Control Plan is needed. 4. Sheet C-3: Is it Rolling Rock Place or Turtle Rock Loop? 5. Sheet C-4: ditto street name. 6. Sheet C-5: Sheet C6 on second submittal. 7. Sheet C-6: Ditto sheet 5. End of line-- install 2" blowoff assembly instead of 6" plug. There appears to be two Sheet C6s. 8. Sheet C-7: OK 9. Sheet C-8: OK 10. Sheet C-9: OK 11. Sheet C-10: OK 12. Sheet C-11: OK 13. Sheet C-12: ok 14. General: add details for 36" RCP (plan/profile) and outlet channel downstream of 36". Cannot find a headwall or wingwall detail. Staff Review Comments Page 2 of 3 Drainage Report 1. Show inlet sizing calculations for Inlets #1 and #2 according to the City of College Station Drainage Policy and Design Standards, Part V.D. The last two pages in the drainage report are duplicated. General 1. OK Reviewed by: Thomas V. Vennochi Jr. Date: 7/13/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 3 of 3 11. Sheet C-10: add typical detail for 28' pavement section; add tap details for water and sewer. 12. Sheet C-11: sidewalk- width = 4'; 6' from back of curb. 13. Sheet C-12: ok 14. General: add details for 36" RCP (plan/profile) and outlet channel downstream of 36"; add concrete valley gutter detail-street; add structural details for inlets or attach City detail sheet; add note on sheets C-5 thru C-9 referring to Sheet C-12 for TNRCC compliance criteria. Drainage Report 1. Show inlet sizing calculations General 1. Please furnish a water design analysis that supports the 6" line sizes for all of the waterlines in all three phases; previous submittals for this same area and lot layout calls for an 8" line down Spring Creek to the east property line. Reviewed by: TED MAYO ELECTRICAL Date: 5/27/01 1. Blk. 19, Lot 1 need a 10 ft easement along Appomattox Dr. 2. Developer is responsible for the installation of conduit per city spec and design. 3. Developer is responsible for the installation of street lighting per city spec and design. Reviewed by Tony Michalsky Date: 5-11-01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and Staff Review Comments Page 3 of 1 "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 4 of 1