Loading...
HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO. 1 Project: H.E.B. GROCERY STORE PH. 2-SITE PLAN (01-119) T ecause there are issues that need to be addressed that may affect the layout of the site. The following does not constitute a full review, but is intended to inform the applicant of some items that have been noted. There will be a full review with the next submittal. PLANNING 1. The 15-ft. Holleman Drive ROW dedication has created a new property line for this site. The layout of the site should be in respect to the new property line. 2. There are multiple phase 2s and 3s on the Master Phasing Plan. If development of the new water tower site will be a part of phase two, the improvements need to be shown with the HEB site plan. 3. On the Site Plan, clearly show the limits of development for Phase 2. This will be the only area reviewed for this application. Phase lines should be shown 20 ft. beyond any disturbed earth. 4. This submittal is only for Phase 2. Please describe it with the correct lot number(s) and acreage on the cover sheet. 5. When determining parking and landscaping requirements, the amount of the requirement is rounded up when there is a remainder to cover that portion that is needed (e.g., 800 sq.ft. of building / 1:250 parking ratio = 3.2, or 4 parking spaces required). 6. On the Site Plan, there are hash-marked parking spaces (or portions of spaces) where the new parking will blend into the El Chico Parking. These areas need to become raised parking islands. Reviewed by: Molly Hitchcock Date: May 16, 2001 ENGINEERING 1. Sheet 3: FEMA Note- change 25 yr. To 100 yr. 2. Sheet 8: ditto 3. Sheet 9.1: Show existing 12" waterline (N-S thru property) ; BM- overtype 4. Sheet 9.2: Show existing 12" waterline- plan/profile; show existing 8" waterline on Park Place 5. Sheet 9.3: Show existing 12" waterline- plan/profile 6. Sheet 9.5: label inlets C1-4 &C1-2 in plan views Staff Review Comments Page 1 of 1 7. Sheet 10.1: concrete encasement of sanitary sewer at crossing with waterline- verify TNRCC compliance; waterline note 6- minimum of 24" separation required. 8. Sheet 10.3: waterline/sewer line crossing- verify TNRCC compliance; 24" min. vertical separation; show 8" waterline on Park Place. 9. Sheet 12.2: water service from easement on property- detail does not agree with sheets 10.1 & 10.3; Reviewed by: TED MAYO Date: 5/24/01 ELECTRICAL 1. Reviewed by: Tony Michalsky Date: MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 2 of 1 STAFF REVIEW COMMENTS No. 2 Project: HEB GROCERY STORE PH. 2 -SITE PLAN (01-119) Stopped Review: Only basic information was submitted with the intent of staff review of the larger site logistics issues, therefore a full review could not be completed. PLANNING 1. As requested verbally by the applicant, a basic review of the larger logistics of the site plan has been completed. At this time, it appears that the issues arising from the Holleman ROW dedication are adequately addressed. Submittal of landscaping plans and additional detail sheets is necessary for a full review. Reviewed by: Jessica Jimmerson Date: 6-21-01 )roe ENGINEERING C-0 Ub k- -C.-al- Ix- Reviewed by: ~ L - Y NOTE: Any changes made to the play 10L 11aVr, 1uL ut::et ieyuesLea oy the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 3 of 3 STAFF REVIEW COMMENTS No. 2 Project: HEB GROCERY STORE PH. 2 -SITE PLAN (01-119) Stopped Review: Only basic information was submitted with the intent of staff review of the larger site logistics issues, therefore a full review could not be completed. PLANNING 1. As requested verbally by the applicant, a basic review of the larger logistics of the site plan has been completed. At this time, it appears that the issues arising from the Holleman ROW dedication are adequately addressed. Submittal of landscaping plans and additional detail sheets is necessary for a full review. Reviewed by: Jessica Jimmerson Date: 6-21-01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 3 STAFF REVIEW COMMENTS No. 3 Project: HEB GROCERY STORE PH. 2 (SP)-SITE PLAN (1-500119) PLANNING 1. Signs will be permitted separately. FYI - The proposed location of the freestanding sign on Lot 3, may cause problems in the future if the property is sold and/or leased. Vāœ“2. Work is being proposed on property that is not under the ownership of the applicant. Either add a signature from an El Chico official to the site plan application or provide paperwork showing work authorization and the limits of said authority. Construction will not be permitted on this property until this information is submitted. 3 The turnaround area at the back of the building does not match between plan sheets. Is there going to be additional parking in the back or not? Will a separate plan be submitted for this area with phase 3? Show building setbacks. (per C-1 zoning) t.5. Show the FDC (fire department connection to the sprinkler system). ,,6. On Page 11.2 the detail for island type "I" does not appear to be complete. y There are three parking islands on the El Chico property that are shown as raised curb on the site plan, as they should be, but there is no mention of them with the other parking island details. They are also not shown on the island detail / overviews. This needs to be consistent throughout the submittal. āœ“8. End Island type "K" on page 11.3 does not meet end island area requirements. 43d. 1/9. What exactly is a decomposed granite walkway? 10. The directional traffic control signs shown on page 12.3 do not meet ordinance requirements. See Table II in Section 12 of the Zoning Ordinance. 11. On the landscaping plans, please remove the information regarding Lot 4, the site of the future water tower. That information will be included in their submittal. Its inclusion at this point just confuses the numbers for Lots 1 and 5. The calculations seem to be in line with what is required, however final approval cannot be granted until staff sees the numbers for Lots 1 & 5. 12. It appears that the location of the turnaround is within 350 feet of Park Place. The construction easement document states that the turnaround should be a minimum of 350 feet away from Park Place. 13. The landscaping that is required near the turnaround should be shown on the plans. You will be permitted to bond out of that landscaping until such time as the construction easement expires or is removed, but it needs to be reviewed and approved with this submittal. Staff Review Comments Page 2 of 3 J:\PZTEXT\SR3.DOC Reminder Note - The building on Lot 1 will not be C/Oed until the rezoning condition concerning the improvements in Holleman is met. Development Services staff understands that the applicant is working with the Public Works Department to reach an agreement. Reviewed by: Jessica Jimmerson Date: 7-9-01 ENGINEERING 1. No comments. Reviewed by: Ted Mayo Date: 7/2/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 3 of 3 J:\PZTEXT\SR3.DOC STAFF REVIEW COMMENTS No. 4 Project: HEB GROCERY STORE PH. 2 - SITE PLAN (01-119) PLANNING 1. This comment is to follow up on the phone conversation between you and Natalie Ruiz regarding the landscaping plan submittal. At this point, to resolve the remaining issues it may be best to hold a meeting between Development Services, the Water/Wastewater Division and yourselves. Please contact us at your convenience to set up a meeting. (979-764-3570) Reviewed by: Jessica Jimmerson Date: 7-26-01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 2 of 2 J:\PZTEXT\SR4.DOC STAFF REVIEW COMMENTS No. 4 Project: HEB GROCERY STORE PH. 2 - SITE PLAN (01-119) PLANNING 1. This comment is to follow up on the phone conversation between you and Natalie Ruiz regarding the landscaping plan submittal. At this point, to resolve the remaining issues it may be best to hold a meeting between Development Services, the Water/Wastewater Division and yourselves. Please contact us at your convenience to set up a meeting. (979-764-3570) Reviewed by: Jessica Jimmerson Date: 7-26-01 ENGINEERING 1. Reviewed by: Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Mai- Staff Review Comments Page 2 of 2 J:\PZTEXT\SR4.DOC V (-I I cl CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM TO: Jim Lopez, Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: HEB GROCERY STORE PH. 2 (SP) - SITE PLAN Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: To be determined later today. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Case file # 1-500119 ~)~"ffc-1 a CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM May 24, 2001 TO: JImmy Lopez, Adams Consulting Engineers, Inc., Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: H. E. B. Grocery Store - Site Plan Staff reviewed the above-mentioned site plan as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Mary Rohrer, H.E.B. Grocery Company, Via fax 210-938-8091 Case file #01-119 Home of Texas A&M University CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM May 24, 2001 TO: JImmy Lopez, Adams Consulting Engineers, Inc., Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: H_ E_ B. Grocery Store Site Plan Staff reviewed the above-mentioned site plan as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Mary Rohrer, H.E.B. Grocery Company, Via fax 210-938-8091 Case file #01-119 Home of Texas A&M University CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM June 22, 2001 TO: Jimmy Lopez, Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: HEB GROCERY STORE PH. 2 (SP) - SITE PLAN Staff reviewed the above-mentioned partial site plan as requested. The following page is a staff review comment stating that the ROW dedication issue has been addressed for the site plan. Please submit the following information for a complete site plan review: Two (2) copies of complete civils with the site and landscaping plans attached. Staff is ready to issue a Clearing and Rough Grading permit for this site. If there are comments that you are not addressing with the site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764--3570. Attachments: Staff review comments cc: Adams Consulting Engineers Inc., Via fax 817-329-7671 Mary Rohrer, HEB Grocery Company, Via fax 210-938-8091 Case file #1 - 500119 Staff Review Comments Page 1 of 3 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM July 10, 2001 TO: Jim Lopez, Adams Consulting Engineers, Inc., Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: HEB GROCERY STORE PH. 2 (SP) - SITE PLAN Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Six (6) complete sets of revised construction documents for the development. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Mary Rohrer, HEB Grocery Company Case file # 01-119 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM July 27, 2001 TO: Jim Lopez, Adams Consulting Engineers, Inc., Via fax 817-329-7671 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: HEB GROCERY STORE PH. 2 (SP) - SITE PLAN Please contact Jessica Jimmerson or myself regarding the attached comment. Attachments: Staff review comments cc: Mary Rohrer, HEB Grocery Company, Via fax 210-938-8091 Case file # 01- 119