HomeMy WebLinkAbout00071131STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SUB-DIVISION SEC3 PH 1 (FP)-FINAL PLAT (1-
500120)
PLANNING
1. Everything looks fine.
Reviewed by:
TED MAYO f1~!I
Date: 5/21/01
ENGINEERING
1.
Reviewed by:
ELECTRICAL
1.
Reviewed by: Tony Michalsky
MISCELLANEOUS
Date:
Date:
1. Irrigation system must be protected by either a Pressure Vacuum Breaker or
Reduced Pressure Principle Back Flow Device and installed as per City
Ordinance 2394.
2. All BackFlow devises must be installed and tested upon installation as per
City Ordinance 2394.
Reviewed by: Rob Werley
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 1 of 1