Loading...
HomeMy WebLinkAbout00071110STAFF REVIEW COMMENTS NO. 1 Project: CASTLEGATE SUB SEC 2 PH 1-FINAL PLAT (1-500124) PLANNING 1. Everything looks fine. Reviewed by: TED MAYO O~ / Date: 5/21/01 ENGINEERING 1. Reviewed by: Date: ELECTRICAL 1. Reviewed by: Tony Michalsky Date: MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. All BackFlow devises must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1