HomeMy WebLinkAbout00071076Cl ( - ~
STAFF REVIEW COMMENTS
No. 2
Project: PARKWAY PLAZA PH 6 (FP)-FINAL PLAT (1-500087)
ENGINEERING
1. Please put P&Z certification block back on plat and submit the required number
of copies.
Reviewed by: Spencer Thompson
Date: April 25, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
folc,c w
Staff Review Comments
J: \PZTEXT\PZ04735. DOC
( 0'. SO Avv~ (A I arIo I
Page 1 of 1
I
r
STAFF REVIEW COMMENTS NO. 1
Project: PARKWAY PLAZA PH 6 (FP)-FINAL PLAT (1-500087)
ENGINEERING
1. The building plans show a 6" waterline/ fireline from the water main to the building
(Sheet SC-4). This line is public up to the backflow prevention device (RPZ). It is
my estimation that, since no RPZ is show, it will be inside the building. This line
must be in an easement. Please include the necessary easement on the plat.
Reviewed by: Spencer Thompson Date: April 16, 2001
ELECTRICAL
1. No Comments
Reviewed by: Tony Michalsky Date: 4-16-01
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Staff Review Comments
J:%PZTEX-RPZ04687. DO C
Page 1 of 1