Loading...
HomeMy WebLinkAbout00071076Cl ( - ~ STAFF REVIEW COMMENTS No. 2 Project: PARKWAY PLAZA PH 6 (FP)-FINAL PLAT (1-500087) ENGINEERING 1. Please put P&Z certification block back on plat and submit the required number of copies. Reviewed by: Spencer Thompson Date: April 25, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. folc,c w Staff Review Comments J: \PZTEXT\PZ04735. DOC ( 0'. SO Avv~ (A I arIo I Page 1 of 1 I r STAFF REVIEW COMMENTS NO. 1 Project: PARKWAY PLAZA PH 6 (FP)-FINAL PLAT (1-500087) ENGINEERING 1. The building plans show a 6" waterline/ fireline from the water main to the building (Sheet SC-4). This line is public up to the backflow prevention device (RPZ). It is my estimation that, since no RPZ is show, it will be inside the building. This line must be in an easement. Please include the necessary easement on the plat. Reviewed by: Spencer Thompson Date: April 16, 2001 ELECTRICAL 1. No Comments Reviewed by: Tony Michalsky Date: 4-16-01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J:%PZTEX-RPZ04687. DO C Page 1 of 1