Loading...
HomeMy WebLinkAbout00071063PREDEVELOf MENT MEETING The purpose of a predevelopment meeting io to meet the City Staff that will be involved with your development and identify general issues that need further analysis. Along with the discussion of these major issues, staff will talk about the development process, distribute necessary information and discuss what permits will be required for your particular development. This meeting is in no way a complete review of your project. Staff will perform a formal thorough review once the minimum requirements are submitted for your particular development. Date of Meeting: ~d Applicant(s): ESL City Staff present: 4z6i6s' Cie Miscellane us: G v May 04 01 11:48a Michael McClure 979 693-2554 Edelweiss Estates, Phase 16 Estimated Cost of Remaining Work Hanover and Von Trapp Streets p.3 DPvo-~O may 4, 111U1 Item No Description Unit Estimated Quantity Unit Price ~ Total 3 1.5" HMAC Surface Course S. Y. 3.0981 4.00 12,392.00 6 7" Crushed Limestone Base S.Y. 1,694; 6.50 11,011.00 7 6" Crushed Limestone Base S.Y. 1,404 5.50 7,722.00 8 Type Ill Curb and Gutter L. F. 1,056, 6.50 6,864.00 Type , L.F. 872 6.50 5,668.00 - 0 a and Knuckle Concrete Apron S.Y. 310 33.50 10,385.00 11 4" Sidewalk S, F. 7,388 2.50' 18,470.00 12 Sidewalk Ramps S. F. 969' 6.00: 5,814.00 28 15' Curb Inlet (top only) EACH 1 11 1,750.00 1,750.00 29 10' Curb inlet to only) ( EACH 2 1,450.00 2,900.00 Total Value of Remaining Work $82,976.00 S/.qo / 0 Edelweiss Estates, Phase 16 Estimated Cost of Remaining Work Hanover and Von Trapp Streets May 4, 2001 Item Description Unit Unit Price Total No. 3 1.5" HMAC Surface Course S.Y. 1 4.00 12,392.00 6 7" Crushed Limestone Base S.Y. 6.50 11,011.00 7 6" Crushed Limestone Base S.Y. 1,404 5.50 7,722.00 8 Type III Curb and Gutter L.F. 1,056 6.50 6,864.00 9 Type IV Curb and Gutter L.F. 872 6.50 5,668.00 10 Concrete Apron and Knuckle S.Y. 310 33.50 10,385.00 11 4" Sidewalk S.F. 7,388 2.50 18,470.00 12 Sidewalk Ramps S.F. 969 6.00 5,814.00 28 15' Curb Inlet (top only) EACH 1 1,750.00 1,750.00 29 10' Curb inlet to only) EACH 2 1,450.00 2,900.00 Total Value of Remaining Work $82,976.00 S/.qo / 0