HomeMy WebLinkAbout00071057STAFF REVIEW COMMENTS NO. 1
Project: STONE FOREST SUBDIVISION PH 3 (FP)-FINAL PLAT (1-500090)
ENGINEERING
1. No comment. Please replace this comment sheet with the previous sheet due to an
error occurring in our system. I apologize for any inconvenience. Thank You.
Reviewed by: Spencer Thompson Date: April 12, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
Electrical
1. Developer is responsible for the installation of all conduit per city design and
requirements.
2. Developer is responsible for the installation of streetlighting per city design and
requirements.
3. Coordinate the location of necessary easements with the electrical division
personnel to cover all electric infrastructure as installed on site.
Reviewed by: Tony Michalsky
Staff Review Comments
J:\PZTEXT\PZ04675. DOC
Date: 4-16-01
Page 1 of 1