The members of the Architectural Control Committee met on March
27, 2002. A purpose of the meeting was to review the
construction plans by the Williamson Group Architects, dated
December 6, 2001 (ten sheets) for "the Koppe Bridge 2"/"Koppe
Bridge Restaurant" at 3940 Harvey Road, College Station, Texas.
The Committee approved the plans.
In the event of any changes in your proposed construction, please
contact the Committee prior to those changes being effected.
We request that you comply fully with all applicable provisions
and requirements of the College Station Zoning District and
the Amended Declaration of Covenants and Restrictions for (the)
Harvey Hillsides Addition. Due to the residential lots which
abut your restaurant property, particular attention is invited
to paragraph XII of the Covenants. Further, we would like to
remind you that any changes in drainage you make on the property
can in no way alter the existing drainage on neighboring
properties.
The Covenants were created to protect all property owners within
our community, just as you expect your property interests to
be protected in the future.
page 2 of 2
The Committee extends to you a warm welcome to Harvey Hillsides
community and conveys its best wishes for the successful
completion of your dining facility. Please call upon us if
we can be of assistance.
FOR THE COMMITTEE: _ John R. Vilas
Chairman
cc: Mr. Jack W. Dillard
✓Development Services, City of College Station
Architectural Control Committee members
HARVEY HILLSIDES ARCHITECTURAL CONTROL COMMITTEE
15 Ranchero Drive o
College Station, x o
77845 -9405
March 11, 2002
Mr. Delph Ross
1002 Oakhaven Circle
College Station, Texas 77840
Dear Mr. Ross:
It has been reported that certain construction-type activities
are ongoing on your property in the Harvey Hillsides Addition.
Please be advised and reminded that Paragraphs IV and VIII of
our covenants are quite clear with regard to building
construction:
"There shall be no . . . structure built . . .
except and until such owner has submitted plans
and specifications to the Architectural Control
Committee for approval.
Accordingly, any construction-type activities should cease
immediately pending proper submissions and approvals.
Your attention is invited to my letter to you dated
November 19, 2000 in which it was recommended that you review
the Harvey Hillsides Addition Covenants and Restrictions,
particularly those portions pertaining to the Architectural
Control Committee and applicable building standards.
rk
The covenants were created to protect all property owners within
the community just as you expect your property interests to
be protected in the future.
Should you desire an additional copy of the covenants or have
any questions please contact me or any member of the Committee.
FOR THE COMMITTEE:
hn R. Vilas
jo;cChairman
cc: - Architectural Control Committee (C. Conant, K. Eugster,
D. Hejtmancik, W. Hoke, W. Jordan, M. Westhusin)
Planning and Zoning Commission, City of College Station
Certified, Return Receipt Requested
Thomas Vennochi - Koppe Bridge @ old Jose's site Page 1
From:
Susan Hazlett
To:
Jessica Jimmerson
Date:
3/28/01 2:38PM
Subject:
Koppe Bridge @ old Jose's site
3/28 Predevelopment Mta.
--Will pursue normal site plan procedures and process maintaining standards and within guidelines and
modifications per zoning ordinance.
--Will submit letter regarding impact of drainage issues
--Using all existing utilities with the exception of the sewer tap to the slab
--Responsible for underground electrial service from pole to building
--City Fire Codes will apply
Carl Warren a/111
Slab integrity
Electrial Division
Inform applicant of # of condui needed for service
Susan Hazlett
Phone: (979) 764-3570
FAX: (979) 764-3496
E-mail: shazlett@ci.college-station.tx.us
CC: Bridgette George; Carl Warren; Jennifer Reeves; Jon Mies; Thomas Vennochi
From: Williamson Group Architects
PSubjed: KOPPE BRIDGE NUMBER TWO
Copies: File, ROSS
~13 - 3la 3 bf
MS. RUIZ:
PLEASE FIND ATTACHED A SITE PLAN THAT HAS BEEN THRU RE-ZONING. MR. DELPH
ROSS WISHES TO UTILIZE THE EXISTING SLAB (FROM OLD JOSE'S RESTAURANT)
AND BUILD A NEW RESTAURANT. MR. ROSS STATES THAT THE ZONING
GOI" II" ISSION GAVE PERMISSION TO USE EXISTING PARKING (WITH ADDED PAVING).
THERE ARE A NUMBER OF OTHER ISSUES THAT WE WOULD LIKE TO BE DISCUSSED
AT THE PRE-DEVELOPMENT MEETING SCHEDULED FOR WEDNESDAY 28 MARCH AT
2PI" I. THESE ARE:
1) DOES THE PROJECT (AS IT STANDS) HAVE A DEVELOPMENT PERMIT.
2) WILL THE PROJECT BE REQUIRED TO GO THRU THE SITE REVIEW PROCESS.
3) WHAT EXACTLY WILL BE REQUIRED FROM THE DESIGN TEAM FOR A BUILDING
PERMIT.
YOUR HELP IN THIS MATTER IS APPRECIATED.
BEST REGARDS,
O. LEON WILLIAI-ISON, r.a.
1 "'m
IMFi
. M
VALLIAM80N GQ0UP AQCKITECT6
106 East 20th Street, Bryan. Texas 77803 (v)400.775.1778 (f)400.775.1884
2551 Texas Ave. South, Ste. A, College Station, TX 77840
Ofc: 979.693.5359 Fax: 979.693.4243 Email: mdgcs@mdgcs.com Web: www.mdgcs.com
April 12, 2001
Ted Mayo, P.E.
Assistant City Engineer
Development Services
City of College Station
PO Box 9960
College Station, Texas 77842
RE: Delph Ross Koppe Bridge Restaurant Tract Site Plan
Dear Ted:
Calculation from the proposed site plan of the above referenced project indicate an increase in impervious
area of 820.5 square feet (0.0188 acres) which is 2.8% of the existing impervious areas. This increase is
minimal and should not cause an appreciable increase in rainfall runoff.
Sincerely,
North B. Bardell, Jr., P.E.
C.E.O.
NB/tm
REVIEWED FOR
cnnnp+ iAnICE
APR 1 7 2001
COLLEGE STATION
ENGINEERING /
,dV
s
c.22-108(999)
0/-
f
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
June 2, 2001
TO: Delph Ross, Via fax 846-9226
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: Koppe Bridge Restaurant - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page
is a list of staff review comments detailing items that need to be addressed. The
next submittal will be the third and final review by staff for this round of reviews.
If all items have not been addressed on the next submittal, another $100
processing fee will need to be submitted for the subsequent set of three (3)
reviews. Please address the comments and submit the following information for
further staff review and approval of the plans:
Six (6) complete sets of civil construction documents for the
proposed development with the revised site and landscaping plans
attached;
Two (2) copies of the revised site plan only; and,
One (1) copy of the revised landscape plan only.
If there are comments that you are not addressing with the revised site plan,
please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: C. Leon Williamson, R. A., Williamson Group Architects, Via fax 775-1884
Case file #01-98
Staff Review Comments Page 1 of 1
Transmit Log Record BitWare Client
Status Log Date Time To Company
OK 566 612/01 10:23:30 Delph Ross
OK 567 6/2/01 10:23:44 C. Leon Williamson
Application
Microsoft Word - PZ04835.DOC
Microsoft Word - PZ04835.DOC
Page 1
Transmit Log Record
Status Log Date
BitWare Client
Time To Company
OK 671 7/23/01 17:17:42 Delph Ross
OK 672 7/23/01 17:17:56 C. Leon Williamson
Application
Microsoft Word - PZ05081.DOC
Microsoft Word - PZ05081.DOC
Page 1
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
July 23, 2001
TO: Delph Ross, Via fax 846-9226
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: KOPPE BRIDGE RESTAURANT (SP) - SITE PLAN
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and approval of the site plan:
Seven (7) revised site plans
One (1) revised landscaping plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc:
Case file # 1-500098
0:\KOPPEBRIDGE\017`(05.004
informorian copies: fle,
hard copy to follow by mail: no
Date: July 30, 2001
To: CITY OF COLLEGE STATION PLANNING DEPARTMENT
BRIDGETTE GEORGE, ASST. DEVELOPMENT REVIEW MANAGER
ATTN: JESSICA JEMMERSON
PO BOX °000
COLLEGE STATION, TEXAS 77842
370-704-3570 (V) 070-7234-3400 (F)
From: Williamson Group Architects
eSubject: KOPPE BRIDGE NUMBER TWO- PERMIT SET
Copies: File, ROSS
MS. JEI" II" IERSON:
PLEASE FIND ATTACHED FOUR SETS OF BLUE LINES OF THE ABOVE REFERENCED
PROJECT. THESE ARE NOT FOR SUBMITTAL AS A SITE REVIEW ITEM.
PER OUR TELEGOM, WE HAVE GORREGTED THE ITEMS REMAINING AND THESE SETS
ARE FOR YOUR USE IN DEVELOPMENT PERMIT STAMPING.
AS YOU RECALL THE ISSUES WERE:
1) NUMBER OF TREES IN BARRICADE AREA-G. THESE ARE NOW ITEMIZED BY NOTE
AND LEADER LINE.
2) THE TOTAL POINTS IN THE LANDSCAPE CHART. THESE HAVE BEEN VALIDATED
AGAINST ITEr1 ONE ABOVE.
WE LOOK FORWARD TO RECEIVING OUR DEVELOPMENT PERMIT. SHOULD YOU
HAVE FURTHER QUESTIONS, PLEASE DON'T HESITATE TO GALL.
BEST REGARDS,
C /I
7T
O. LEON WILLIAMSON, r.a.
WII,I AMM8ON G OUP AQCKITECTA
100 East 20th Street, Bryan. Texas 77,503 (v)373.775.1778 (~373.775.1884
G:\KOPPE?RIDGE\G ITYG5.002
informotion copies: file,
hard copy to follow by rnoiil: no
Pill
~MW
&ri 3„ ,,,,,3, 9fY,.,
Date: March 21, 2001
To: GITY OF COLLEGE STATION PLANNING DEPARTMENT
BRIDGETTE GEORGE, ASST. DEVELOPMENT REVIEW MANAGER
PO BOX 0000
COLLEGE STATION, TEXAS 77842
400-7G4-3570 (V) 400-704-34-00 (F)
From: Williamson Group Architects
c5ubjed: KOPPE BRIDGE NUMBER TWO- FURTHER STAFF REVIEW
Copie's: File, ROSS
MS. GEORGE:
PLEASE FIND ATTACHED TWO CORRECTED SITE PLANS AS REQUIRED BY THE STAFF
WE WOULD LIKE TO SET UP A MEETING WITH STAFF TO REVIEW THESE GOI" II" 1ENTS.
AS YOU ARE AWARE, THIS PROJECT IS A UNIQUE GIRGUMSTANGES AS IT WAS
APPROVED BY PLANNING AND ZONING. WE ARE ATTEMPTING TO COMPLY WITH
ALL GITY REQUIREMENTS, HOWEVER SOME GUIDELINES ARE UNCLEAR AS TO
EXISTING SITE CONDITIONS.
PLEASE LET US KNOW WHEN A MEETING GAN BE SGHEDULED.
REVIEW COMMENTS.
THE FOLLOWING IS OUR COMMENTS FROM THE STAFF REVIEW NOTES:
1. CORRECTED. WAS AN ARBITRARY LINE
2. THE SPACES ARE NOW CLEARLY DEFINED, A PAVING DETAIL IS PROVIDED SHOWING
THE WHEEL STOPS, THE DIMENSIONS ARE NOW PROVIDED ON THE DRAWING.
3. CORRECTED BY USE OF HATCHING ON DRAWING. FOR GLARITY THE DIMENSIONS
FOR EACH PARKING STALL ARE NOT SHOWN, HOWEVER, EACH PARKING STALL WILL
BE 0 FEET BY 20 FEET.
4. EXISTING LANDSCAPING EXTENDS OUT INTO THE TXDOT RIGHT OF WAY, THIS
LANDSCAPING WILL BE BARRICADED PRIOR TO CONSTRUCTION. THE OWNER WILL
PROVIDE ADDITIONAL LANDSCAPING ON THE SUBJECT PROPERTY TO MEET THE
POINT REQUIREMENTS OF STREET SGAPE (SEE POINT TOTAL ON DRAWINGS).
5. CORRECTED
(G. TREE BARRICADE SHOWN ON DRAWING FROM GITY STANDARDS. THERE ARE SOME
TREES THAT HAVE EXISTING PAVING UNDER THE DRIP LINE OF THE CANOPY. WE
WILL SUPPORT THE PLASTIG MESH BARRICADE MATERIAL BY STEEL POST AND BY
TEMPORARY POST SET IN OLD TIRES FILLED WITH CONCRETE. THIS WILL PREVENT
DAMAGE TO EXISTING PAVING.
7. THE OWNER WILL ADD NEW LANDSCAPING TO THE 37REETSCAPINO AREA SINGE
THE EXISTING IS NOT OF THE STATED DIMENSIONS IN THE ORDINANCE.
8. THE LINEAR FOOTAGE SHOWN ON THE ORIGINAL SUBMITTAL IS CORRECT FOR THE
STREETSGAPING GALGULATIONS. (SEE DRAWING NOTES)
M M15
~wgg;'Mwll
.ni
?33 ,,,33.?"
W LLIAM80N GQ0Uf) AQCHITECTeS
106 East 20th Street, Bryan. Texas 77803 (v)403.775.1778 (fl400.775.1884-
0. THE OWNER WILL PROVIDE ADDITIONAL LANDSCAPING (SHRUBS) AS SHOWN ON
DRAWING.
10. ITEM NOTED FOR RECORD.
11. DUMPSTER SCREENING SHOWN ON DRAWING FROM CITY STANDARDS.
12. ZONING FOR PROPERTY IS CB, PDDP FROM DEC 14TH, 2000.
13. FIRE LANES ARE NOW AT 20' MIN. THIS PAVING PLAN WAS PREVIOUSLY APPROVED
BY PLANNING AND ZONING COMMISSION. SINCE PAVING IS EXISTING AND HAS HAD
FIRE TRUCK TRAFFIC ON IT, IT IS ASSUMED THAT THE PAVING IS SUFFICIENT TO
WITHSTAND FIRE TRUCK LOADING.
14. SET BACKS ARE CORRECT ON THE DRAWING NOW, THEY WERE PREVIOUSLY
WRONG.
ENGINEERING GOMMENTS:
15. UTILITY DEMANDS WILL BE SHOWN ON CONSTRUCTION DRAWINGS AND WILL BE
COPIED TO THE ENGINEERING DIVISION. THE EXISTING UTILITIES ARE SHOWN ON THE
DRAWING AND CONTAINED WITHIN EASEMENTS. THE ROW WIDTH OF HWY 3013
UNKNOWN AT THIS LOCATION.
ELECTRICAL GOMMENTS:
10. THE ELECTRICAL DESIGN IS NOT COMPLETE AS THE BUILDING IS NOT YET DESIGNED.
UTILITY LOADS WILL BE SHOWN ON CONSTRUCTION DRAWINGS.
17. OWNER WILL COMPLY WITH ALL OTHER GOMMENTS AT CONSTRUCTION DRAWING
TIME.
MISCELLANEOUS COMMENTS
18. IRRIGATION SYSTEM WILL BE PROVIDED AS NOTED ON DRAWING.
10. BAGKFLOW PREVEN70R WILL SE INSTALLED PER CITY REQUIREMENTS.
20.
YOUR HELP IN THIS MATTER IS APPRECIATED.
BEST REGARDS,
O. LEON WILLIAMSON, r.o.
W LLIAM80N GROUP tWCKITECT8
100 East 20th Street, Bryan. Texas 77803 (v)40.°J.775.1778 (f)4-00.775-1884-
IF
IWAIIIA
G:\KOPVEBR!DGE\C I"I-'!G5.003
Info-c'ion copes: fle,
hord copy to follow by moil: no
Date: July 13, 2001
To: GITY OF COLLEGE STATION PLANNING DEPARTMENT
BRIDGETTE GEORGE, ASST. DEVELOPMENT REVIEW MANAGER
PO BOX 9960
GOLLEGE STATION, TEXAS 77842
409-764-3570 4033-764-3496 (F)
From: Williamson Group Architects
c5ubjed: KOPPE BRIDGE NUMBER TWO- FINAL STAFF REVIEW
Copies: File, ROSS
MS. GEORGE:
PLEASE FIND ATTACHED THREE COPIES OF CORRECTED SITE PLANS AS REQUIRED
BY THE STAFF
REVIEW COMMENTS.
THE FOLLOWING IS OUR COMMENTS FROM THE STAFF REVIEW NOTES:
1. A PRELIMINARY DEMAND FOR UTILITY SERVICES IS SHOWN ON DRAWINGS.
2. PROPOSED SERVICE LINES ARE EITHER EXISTING OR NEW. THESE ARE
SHOWN ON THE SITE PLAN. THE GITYS DRAWINGS ARE IN ERROR THERE IS A
FIRE HYDRANT AS SHOWN ON OUR SITE PLAN. IT WAS TESTED BY CITY
WATER DEPARTMENT AND THE FLOW RATES ARE SHOWN ON THE DRAWING.
3. THE EASEMENT AND PROPERTY LINE GALL OUTS HAVE BEEN GORREGTED
PER THE PLATTED PROPERTY.
4. TEXAS DEPARTMENT OF TRANSPORTATION COULD NOT GIVE US PERMISSION
TO USE THE LANDSCAPE IN THE R.O.W. THUS WE HAVE INCLUDED ON THE
SITE PLAN ONLY THE EXISTING PLANTINGS ON THE PROPERTY AND THE NEW
LANDSCAPE. THESE FAR EXCEED THE REQUIRED POINTS.
PER OUR MEETING OF 25 JUNE THIS SHOULD RESOLVE ALL REMAINING ISSUES. WE
ARE LOOKING FORWARD TO GETTING OUR DEVELOPMENT PERMIT SO WE MAY
MOVE ON TO BUILDING DESIGN PHASE.
YOUR HELP IN THIS MATTER IS APPRECIATED.
BEST REGARDS,
G. LEON WILLIAMSON, r.a.
WII,I, AMON GROUP AMITECT8
106 East 26th Street, Bryan. Texas 77803 (v)4.09775.1778 (fl409.775.1884
0[-q~
Texas Department of Transportation
1300 N. TEXAS AVE. • BRYAN, TEXAS 77803-2760 • (979) 778-2165
July 3, 2001
Mr. C. Leon Wlliamso
Williamson Gr chitects
106 Ea Street
Texas 77803
RE: SH 30 @ Koppe Bridge No. 2
Part of Block 4 (1.711 Acres)
Harvey Hills Subdivision
College Station, Texas
Dear Mr. Williamson:
We have reviewed the attached site plan information along with your landscape request. We
cannot insure or guarantee that future TxDOT improvements to SH 30 would not require the
removal of any or all of the landscape items located within the existing SH 30 right-of-way.
Therefore, any agreement between the City of College Station and the Developer based on existing
landscape conditions would in no way be binding on future TxDOT modifications within the SH 30
right-of-way.
If you have any questions concerning this matter, please call.
Sincerely,
Catherine W. Heil, P. E.
Area Engineer
JOP/bja
Attachment
ridgette George
Asst. Development Review Manager
PO Box 9960
College Station, Texas 77842
An Equal Opportunity Employer
TEXAS DEPARTMENT OF TRANSPORTATION
BRYAN. TES
778-E233 (V) 778-1375 (F)
from: Williamson Group Architects
Subjects KOPPE BRIDGE NUMBER TWO- LANDSCAPE IN TXDOT ROW
Copies: File, ROSS
MR. PAGE
PER OUR TELEPHONE CONVERSATION. I AM WRITING TO YOU SEEKING A LETTER
STATING THAT WE=MAY-60UNT-T"HE°LANDSCAPE IN THE-TEXDOT ROW AS POINTS
TOWARD OUR CITY-OFXG:S:,SITE PLAN REQUIREMENTS.
THE PROPERTY IN QUESTION IS OWNED BY
DELPH S GLENDA ROSS
1002 0AKi-1AVEN GIRCLE
COLLEGE STATION, TEXAS 77840
LOT 1.711 AGRES
PORTION OF BLOCK 4
HARVEY HILL-5 5U5DIV1510N
BRAZOS COUNTY, COLLEGE STATION, TEXAS
ATTACHED IS A COPY OF THE SITE PLAN SHOWING PLANTING IN THE ROW. ALL OF
THE PLANTING OCCURS WITHIN 10 FEET OF THE OWNERS PROPERTY LINE. THE
OWNER INTENDS TO SUPPLEMENT THIS PLANTING WITH NEW PLANTS (TOTALLY
WITHIN HIS PROPERTY BOUNDARY).
IF WE COULD GET A LETTER ADDRESSED TO :
OTY OF COLLEGE STATION PLANNING DEPARTMENT
BRIDGE77E GEORGE. ASST. DEVELOPMENT REVIEW MANAGER
PO BOX 9960
COLLEGE 5TA710N. TEXAS 71842
409-76111-3570 M 409-704-3496 (F)
STATING THE CONCURRENCE OF TXDOT WITH LEAVING EXISTING PLANTING.
YOUR HELP IN THI5 MATTER 15 APPRECIATED.
BEST REGARDS,
C. LEON WILLIAMSON. r.a.
WILLIAMON GROUP AQaITECT6 '
106 East 20-en Street. Bryan. Texas 77803 (v)979.775.1778 (f)979.7751884
I
G:\K0PPEBRIDGE\C7yG5.005
mformotion copies: fle,
hard copy to follow by mail: no
Date: August 0, 2001
To: GITY OF COLLEGE STATION PLANNING DEPARTMENT
BRIDGETTE GEORGE, ASST. DEVELOPMENT REVIEW r-ANAGER
PO BOX 0000
COLLEGE STATION, TEXAS 77842
070-704-3570 (V) 0070-7064-34000 (F)
From: Williamson Group Architects
65ubjed: KOPPE BRIDGE NUMBER TWO DEVELOPMENT PERMIT
Copies: File, ROSS
MS. GEORGE:
I AM IN RECEIPT OF YOUR FAX MEMO DATED 8/8/01 CONCERNING THE
REQUIREMENTS FOR DOCUMENTATION OF THE DEVELOPMENT PERMIT 0 N THE
ABOVE REFERENCED PROJECT.
PLEASE FIND THE REQUIRED COPIES, SEALED AND SIGNED.
BEST REGARDS,
C. LEON WILLIAMSON, r.o.
'3) 'Zj" A-4c
WII.,I AMON GID-OUP AQCHITECTeS
IOro East troth Street, Bryan. Texas 77803 (v)373.775.1778 0373.775.1884
/08/01 13:36
From: Bridgette George
979-764-3896
Page 1 of 1
1
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
r~
August 8, 2001
TO: Delph Ross, Via fax 846-9226
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: Koppe Bridge Restaurant Site Plan
Staff has completed the final round of plans review and have approved the construction
documents. Please remove "NUT FOR PERMIT OR CONSTRUCTION - INCOMPLETE
INFORMATION"on the construction documents and submit the following items to be stamped
approved and distributed:
Three (3) complete sets of civils with the site and landscaping attached;
Three (3) complete sets of civils with the architecturals attached; and,
Three (3) site and landscaping plans only.
Please call me if you have any questions.
cc: C. Leon Williamson, R. A. Williamson Group Architects, Via fax 775-1884
Case file #01-98
Did Ye A ~
Home of Texas A&M University
C~ q8
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
August 8, 2001
TO: Delph Ross, Via fax 846-9226
FROM: Bridgette George, Asst. Development Review Manager
SUBJECT: Koppe Bridge Restaurant - Site Plan
Staff has completed the final round of plans review and have approved the construction
documents. Please remove "NOT FOR PERMIT OR CONSTRUCTION - INCOMPLETE
INFORMA TION" on the construction documents and submit the following items to be stamped
approved and distributed:
Three (3) complete sets of civils with the site and landscaping attached;
Three (3) complete sets of civils with the architecturals attached; and,
Three (3) site and landscaping plans only.
Please call me if you have any questions.
cc: C. Leon Williamson, R. A. Williamson Group Architects, Via fax 775-1884
Case file #01-98
Home of Texas A&M University
Transmit Log Record BitWare Client Page 1
Status Log Date
OK 688 8/8/01
OK 689 8/8/01
Time To Company Application
13:36:18 Delph Ross Microsoft Word - PZ05205.DOC
13:36:42 C. Leon Williamson R. A. Williamson Grou Microsoft Word - PZ05205.DOC
-7-15 t