HomeMy WebLinkAbout00071025STAFF REVIEW COMMENTS No. 2
Project: KOPPE BRIDGE RESTAURANT (SP)-SITE PLAN (1-500098)
PLANNING
1. To be able to count the existing landscaping/streetscape points in the
TXDOT ROW, the applicant must have permission from the state to retain
and maintain what is existing. Please provide a letter from TXDOT stating
their approval of the landscaping/Streetscape in the ROW.
Reviewed by: Jennifer Reeves/Jessica Jimmerson Date: 05/15/01
ENGINEERING
1. The engineers here at Development Services need to see the estimated
demand for domestic water, irrigation water and sewer usage: minimum,
average and maximum on the site plan so that we can size the water
meters and determine the appropriate utility taps. We understand you are
trying to use the existing services, but your demand might require different
size meters. There is also the possibility that the services were damaged
in the fire. Please provide the estimated demand information in case of
these possibilities.
2. Please show existing/proposed utilities and existing/proposed service lines
to your proposed building. We must assure that they are properly
contained in the appropriate easements. Meters must be contained within
an easement. Our record of existing City of College Station water and
waste water lines do not show a fire hydrant near the north corner of your
property. We do not show a water line near your property. There is a 15"
sanitary sewer line in an existing easement along the northeast side of the
property.
3. The easements and property line call outs from your final plat (Delraye
July 1999) are not properly represented on your site plan.
4. In order to obtain building permits, begin site and structure construction,
the site plan must be approved and a Development Permit must be
issued. You drainage letter has been approved. The proper utilities, utility
services and easements must be affirmed.
Reviewed by: Thomas V. Vennochi Jr. Date: 06/1/01
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
Staff Review Comments Page 2 of 1
STAFF REVIEW COMMENTS
No. 3
Project: KOPPE BRIDGE RESTAURANT -SITE PLAN (01-98)
PLANNING
1. It appears that the boundary of some of the landscaping barricading has been
omitted from the latest submittal, esp. around the buffer area.
2. According to the landscaping chart, there should be 14 canopy and 20 non-
canopy trees in the barricaded areas. Staff can only find 19 total. We need to
have that information accurately depicted on the plan so that when an inspector
visits the site, it is very clear how many plants of what kind should be in each
barricade area. If it is not feasible to graphically depict each area, then call out or
note what is in each area. (We do not need to know exactly what is in the buffer
area.)
Reviewed by: Jessica Jimmerson Date: 7-18-01
ENGINEERING
1. No comment.
Reviewed by: Thomas V. Vennochi Jr. Date: 7/23/01
NOTE: Any changes made to the plans, that have not been requested by the City of
College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that have not been pointed out to the City,
will constitute a completely new review.
Staff Review Comments Page 2 of 3
J APZTEXT\SRI DOC