Loading...
HomeMy WebLinkAbout00071017STAFF REVIEW COMMENTS NO. 1 Project: SONIC AT WELLBORN & ROCK PRAIRIE-SITE PLAN (1-500101) PLANNING 1. Any landscaping that's removed must be replaced to maintain the existing landscaping point calculation from the original approved landscaping plan. Please show on the site plan where relocation of landscaping will be placed. Keep in mind if you place landscaping in the site triangle you must keep it under 2' 6". Reviewed by: Jennifer Reeves Date: 04/26/01 ENGINEERING 1. At this time, in review of the Preliminary Site Sketch dated 4/20/01, 1 don't see any engineering issues with regard to sanitary sewer, water distribution or drainage within the proposed canopy area. Reviewed by: Thomas V. Vennochi Jr. Date: 04/26/01 ELECTRICAL 1. Any changes in electric service requirements coordinate with City Electrical Division. Reviewed by: Tony Michalsky MISCELLANEOUS Date: 4-30-01 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1