HomeMy WebLinkAbout00070988STAFF REVIEW COMMENTS
No. 2
Project: KTH COMMERCIAL ADDITION (MDP)-MASTER DEVELOPMENT
PLAN (01-106)
PLANNING
1. The subject property is currently zoned M-1, C-1, and A-O. Please show
the zoning designations on the plan. You will need to show the zoning
district boundaries when they are not the same as the proposed lot
boundaries.
2. Please describe proposed land uses for Lots 1 and 2 and the existing land
use on Lot 2. If there are any proposed zoning changes, please identify
them.
3. Other owners of land in the parent tract need to sign the application to
show that they are aware of their property's involvement in this plan.
Reviewed by: Molly Hitchcock Date: May 9, 2001
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 1 of 1
approximate location of Decatur Street as shown on the Thoroughfare
Plan. Decatur will need to be constructed at the time these tracts plat.
Off-site Easements: A Public Sewer and Drainage Easement is being
required for Lot 1through Lot 2.
Drainage: Any development in the area will be required to comply with
the Drainage Ordinance. There is an unnamed channel flowing from
north to south that provides a drainage outlet for Shenandoah. An
easement is being provided to maintain the integrity of the channel.
Flood Plain: Not located in a flood plain.
Impact Fees: None
NOTIFICATION:
Advertised Commission Hearing Dates(s): 5-17-01
Response Received: None as of date of staff report.
STAFF REVIEW COMMENTS No. 3
Project: Kth Commercial Addition (MDP)-Master Development Plan (01-106)
K.S. Moss Capital Corp. has declined staff's request to participate in the Master
Development Plan. Please submit a letter requesting a variance from the Subdivision
Regulations to have all owners of the parent tract participate in the master development
plan process. In the letter, the applicant will need to document his attempt to include
K.S. Moss Capital Corp. in the process.
PLANNING
1. Please remove "RESERVE TRACT "B" 14.254 ACRES" from the K.S. Moss
Capital Corp. tract.
2. Please remove the bold from around the K.S. Moss Capital Corp. tract.
3. Please include a note on the plan that the K.S. Moss Capital Corp. tract is the
remaining piece of the parent tract, but will not be considered in the KTH
Commercial Master Development Plan.
Reviewed by: Molly Hitchcock
Date: June 19, 2001
ENGINEERING
1. No comment.
Reviewed by: Spencer Thompson
Date: June 20, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of
College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that have not been pointed out to the City
will constitute a completely new review.
Staff Review Comments
J:\PZTEXT\SR3.DOC
Page 2 of 3
STAFF REVIEW COMMENTS NO. 1
Project: KTH COMMERCIAL ADDITION (MDP)-MASTER DEVELOPMENT PLAN (01-
106)
PLANNING
1. Please show the proposed property lines within the parent tract boundaries.
2. The subject property is currently zoned M-1, C-1, and A-O. Please show the correct
existing zoning designations on the plat.
3. Please identify the owners of Lot 1 Block 1, Lot 2 Block 1, and Reserve Tract "A".
4. Please describe proposed land uses and, if applicable, any proposed zoning
changes.
5. Other owners of land in the parent tract need to sign the application to show that
they are aware of their property's involvement in this plan.
Reviewed by: Molly Hitchcock Date: April 30, 2001
ENGINEERING
1. It has come to my attention that a line must be shown on this plat as the proposed
ROW for Decatur. The line is not intended to be an accurate depiction of the ROW
location. It is only intended to make the public aware of the future street addition.
Please place the arbitrary line on the southern boundary where you deem best and
add a note to that affect.
2. Please make sure that the owners of Lot 1 Block 1 know that they will need to
construct a minimum 6" sewer line in order to later serve Reserve Tract "B".
3. Lot 2 will be required to provide an access easement to Lot 1 across the property
front due to driveway requirements and constraints.
Reviewed by: Spencer Thompson Date: April 30, 2001
ELECTRICAL
1. No comments
Reviewed by: Tony Michalsky Date: 4-30-01
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 1 of 1
J:\PZTEXl1PZ04753. DOC
STAFF REVIEW COMMENTS
No. 4
Project: KTH COMMERCIAL ADDITION (MDP)-MASTER DEVELOPMENT PLAN
(01-106)
PLANNING
1. The dedication and development of the future Decatur ROW will be necessary
with the platting of Reserve Tract A. The entire ROW will have to be dedicated
and developed, but the current plan only shows 20 feet of the ROW on the
property. For the master development plan, please identify the 70-ft. ROW on
the property. The exact alignment of the road will have to be shown on any
future preliminary plat of Reserve Tract A.
Reviewed by: Molly Hitchcock Date: June 28, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City will constitute a completely new review.
Staff Review Comments Page 3 of 3
J:\PZTEXT\SR4.DOC