Loading...
HomeMy WebLinkAbout00070978STAFF REVIEW COMMENTS NO. 1 Project: EMERALD FOREST PH 11 - PRELIMINARY PLAT (01-108) PLANNING 1: No comments. Reviewed by: Jessica Jimmerson Date: 5-2-01 ENGINEERING 1. Bearing and distance on border along pipeline easement: S 39" 30' 17" E 735.43' should be S 33"` 30' 17" E 1303.151 . Reviewed by: Ted Mayo Date: 5/92/01 ELECTRICAL 1. Developer responsible for the installation of electric conduit per City specs e and requirements. 2. Developer responsible for the installation of street lighting per City specs and ~sr~{-tom requirements. 3. Additional easements may be necessary between lots to provide electric service to properties. 4. 5 ft easements will be necessary where street fights services run between lots per city design. Reviewed by: Tony Michalsky Date: 4-30-01 NOTE. Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. j.T- EX"7Z4?0.DM P6pe t of i