Loading...
HomeMy WebLinkAbout00070885STAFF REVIEW COMMENTS NO. 1 Project: LUEPNITZ SUBDIVISION (FP) -FINAL PLAT (1- 500070) ENGINEERING 1. Correct ACTURAL to ACTUAL along Rock Prairie Road. Please note that this Final Plat will not be filed until the infrastructure design has been approved and either installed and inspected or a bond for the amount of construction has been issued. No building permit will be issued until the plat is filed. Reviewed by: Spencer Thompson Date: March 14, 2001 ELECTRICAL 1. Developer is responsible for conduit extensions to provide electric service to property per city specs and design. Reviewed by: Tony Michalsky Date: 3 -14 -01 MISCELLANEOUS NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1 J: \PZTEXT \PZ04502. DO C Transmit Log Record BitWare Client Status Date Time To Company Application Page 1 OK 3/16/01 9:46:00 J. Dale Brown, Jr., P. Ash & Browne Engineering, In Microsoft Word - PZ04518.DOC OK 3/16/01 9:47:08 Dr. Roy Luepnitz W. S. Construction, Inc. Microsoft Word - PZ04518.DOC OK 3/16/01 9:48:10 Dr. Roy Luepnitz W. S. Construction, Inc. Microsoft Word - PZ04502.DOC OK 3/16/01 9:49:18 J. Dale Brown, Jr., P. Ash & Browne Engineering, In Microsoft Word - PZ04502.DOC