HomeMy WebLinkAbout00070855STAFF REVIEW COMMENTS NO. 1
Project: ESTATES AT RIVER RUN PH 3 (FP) -FINAL PLAT (01 -066)
PLANNING
1. Please indicate the subdivision boundary with heavy lines.
2. Lot 4B constitutes a new lot. Lot 4A and Lot 4B each need to meet the requirements
of the Subdivision Regulations (e.g., lot size, frontage distance). Perhaps the effect
intended could instead be reached through an easement.
3. Does the retained mineral surface use extend across Paint Trail?
Reviewed by: Molly Hitchcock Date: March 14, 2001
ENGINEERING
1. A drainage easement is necessary for watercourses where drainage must traverse
from one property through the next such as along White's Creek, from the ROW to
the river or creek, and (apparently) from Lot 5 through Lot 2. Please see Code of
Ordinances/ Chapter 9/ Drainage Easements.
Reviewed by
Spencer Thompson
Date: March 19, 2001
ELECTRICAL
1. No comments.
Reviewed by: Tony Michalsky
Date: March 14, 2001
NOTE: Any changes made to the plans, that have not been requested by the City of
College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that have not been pointed out to the City
will constitute a completely new review.
Staff Review Comments
J: \PZTEXT\PZ04513. DOC
Page 1 of 1