HomeMy WebLinkAbout00070786STAFF REVIEW COMMENTS NO. 1 Project: CREEKSIDE TERRACE CONDO'S (SP) -SITE PLAN (01 -63) PLANNING 1. Need to identify all easements as proposed or as existing. 2. Need to note on the site plan whether or not the subject property is in the 100 -year flood plain. 3. Please note all utilities as existing or as proposed. 4. Need to show curb detail on site plan 5. Please identify fire hydrants as existing or as proposed. 6. Need to contact Tony Michalsky on transformer location and conduit routing. 7. Please show parking requirements on the site plan. 8. Developer needs to provide 456 square feet of interior parking islands to meet the City Ordinance. 9. Please show all fire lanes. 10.At the entrance drive the existing power pole is being shown in the site distance triangle, and you are also showing a proposed 6" water line going through the existing power pole. What are your plans for this situation? 11. Please show required landscaping, and streetscaping point calculation requirements on your site plan. If you want to acquire points for the existing trees, you must show the caliper of each tree. Reviewed by: Jennifer Reeves Date: 03/7/01 ENGINEERING 1. A public utility easement dedicated by separate instrument and a sealed engineer's estimate is necessary for the fire line and hydrant. 2. At this point we assume that a single domestic and a single irrigation water meter will serve the whole development per your owners association. Show the estimated demand for domestic water and irrigation water separately, in a table format, showing the minimum, average and maximum flow demand. This will enable us to size the meters appropriately. 3. On the construction documents, Sheet C -2, the existing sanitary sewer north of Flume B is an 8" line for approximately 200'. A 10" sewer line exists under Deacon Drive. Please annotate them properly on both the site plan and construction documents. 4. Please show sanitary sewer connections on the site plan. 5. Also on Sheet C -2, Section B -B, it appears there is a typographical error, EL= 289.00. Annotate Flume B /profile inset. Staff Review Comments Page 1 of 1 6. In the Drainage Report, the acreage on Exhibit B2 does not match the acreage on Exhibit C1. 7. Please show a pavement cross - section detail on the site plan. 8. Please line up the centerline of the drive with Sandy Circle. Reviewed by: Thomas V. Vennochi Jr. Date: 3/8/01 ELECTRICAL 1. No comments Reviewed by: Tony Michalsky Date: 3/7/01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 2 of 1 STAFF REVIEW COMMENTS No. 2 Project: CREEKSIDE TERRACE CONDO'S (SP) -SITE PLAN (1- 500063) PLANNING 1. The parking analasys is incorrect on your legend. The required parking for condominiums is 1.5 parking spaces per bedroom. This would require 63 parking spaces for the subject property, you are only showing 52. 2. A Landscaping Plan needs to be submitted for review. Reviewed by: Jennifer Reeves Date: 03/14/01 El Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1 STAFF REVIEW COMMENTS No. 3 Project: CREEKSIDE TERRACE CONDO'S (SP) -SITE PLAN (1- 500063) PLANNING 1. The required parking is 1.5 parking spaces would require Creekside Terrace to provide There are 21 units proposed for this site, spaces, only 62 are proposed. Reviewed by: JENNIFER REEVES ENGINEERING per bedroom per unit. This 3 parking spaces per unit. this will require 63 parking Date: 03/26/01 1. The existing sanitary sewer that you wish to tie into is an 8" pipe. The flow of the existing sanitary sewer is to the northerly direction. Your sanitary sewer connection should be angled appropriately. We highly suggest that a manhole be placed at your connection to the existing sewer to prevent the chance of future stoppage and adverse impacts to your development and upstream citizens. 2. We size your water meters from your estimated demand. Our analysis of the water demand shows twice the amount of maximum flow. Please check your water demands as compared to your meter sizes. Reviewed by: Thomas V. Vennochi Jr. Date: 03/27/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1 0 STAFF REVIEW COMMENTS No. 4 Project: CREEKSIDE TERRACE CONDO'S (SP) -SITE PLAN (1- 500063) PLANNING 1. Please be aware in order to count barricaded trees toward your landscape point calculation, the trees must be in a location on the site that can be properly barricaded. It appears that some of the existing trees at the rear of your buildings cannot be properly barricaded. To properly barricade existing trees there has to be one foot per caliper inch of protection. They appear to be too close to your building for the proper barricaded protection. This has been an oversight on staff for not bringing this to your attention on previous reviews. In this instance you will receive point credit. Please be aware that if the trees die you will be expected to replace them. Reviewed by: Jennifer Reeves Date: 09/14/01 ENGINEERING 1. The drainage report has been approved. 2. Please submit detailed cost estimates for the public infrastructure (fire line) sealed by a Texas P.E. Reviewed by: Thomas Vennochi, Jr. Date: 9/17/01 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J APZTEXT\PZ05376. DOC Page 2 of 2 5. Also on Sheet C -2, Section B -B, it appears there is a typographical error, EL= 289.00. Annotate Flume B /profile inset. 6. In the Drainage Report, the acreage on Exhibit B2 does not match the acreage on Exhibit C1. 7. Please show a pavement cross - section detail on the site plan. 8. Please line up the centerline of the drive with Sandy Circle. Reviewed by: Thomas V. Vennochi Jr. Date: 3/8/01 ELECTRICAL 1. Developer / Owner is responsible for providing and installing at developers cost: Conduit per Electric Divisions spec and design. 1 - 4" gray sch 40 pvc conduit for electric service, from power pole to meter pack. 30 ft. of rigid conduit for riser poles (install first 10ft. city will install remainder) 4 inch weather head for each service riser. Contact Tony Michalsky at 979 - 764 -3438 Reviewed by Tony Michalsky Date: 3/8/01 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker or Reduced Pressure Principle Back Flow Device and installed as per City Ordinance 2394. 2. Back Flow devises must be tested upon installation as per City Ordinance 2394. Reviewed by: Rob Werley NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 2 of 1