HomeMy WebLinkAbout00070785LETTER OF COMPLETION 0� , c n
CITY ENGINEER DATE: 1 -16 -02
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF Creekside
Terrace Utilities
Dear Sir:
The purpose of our letter is to request that the following listed
improvements be approved and accepted as being constructed under city
inspection and completed according to plans and specifications as
approved and required by the City of College Station, Texas. This
approval and acceptance by the City is requested in order that we may
finalize any sub - contracts and to affirm their warranty on the work. This
approval and acceptance by the City of the improvements listed below
does hereby void the letter of guarantee for the listed improvements on
the above referenced project.
The one year warranty is hereby affirmed and agreed to by
Elliott Construction, Inc. and by their sub - contractors as
indicated by signatures below.
WORK COMPLETED
200 LF - 6" Waterline
Fire Hydrant
1 - Manhole
DATE
1 -10 -
1 -10 -02
1 -10 -02
Owner:
Address:
Signature:
Lip l
�0 z
Utility Representative (s)
AL
Contractor Elliott Constructio Inc.
Address: P.O. s ox 510
Wellborn, TX 77881
Signature: